Business

April 24, 2013

Boeing Winnipeg announces site expansion, 737 MAX work

Boeing Canada Winnipeg announced April 23 plans to increase its Murray Park Road manufacturing site by more than 22 percent, primarily to house new composites work for Boeing’s 737 MAX airplane.

The building will be expanded by 14,000 square meters (150,000 square feet) to a total of 62,000 square meters (665,000 square feet) of manufacturing space. It will be used mainly to construct the one-piece composite acoustic inner barrel on the newly designed engine nacelle inlet for the 737 MAX.

The inner barrel is one of the latest quiet engine technologies that will be employed on the 737 MAX to help reduce the operational noise of the airplane by up to 40 percent.

“Boeing Canada Winnipeg has a great future ahead in support of unprecedented production rates,” said Kevin Bartelson, general manager, Boeing Canada Winnipeg. “Earlier this year, we negotiated a successful contract extension with our local Canadian Auto Workers union. This contract ensures we have the stable workforce, skills and now the manufacturing space we need to take on exciting new production for the 737 MAX.”

The expanded building, which includes two bays about the size of 12 Olympic-sized swimming pools, will house the 737 MAX and some 787 Dreamliner production. Construction will begin immediately on the west side of the existing Murray Park facility, with an estimated completion by the fourth quarter of 2014. Today’s event was held in conjunction with Stantec and Graham Construction, the design-builders of the facility.

“I am very pleased with how our Winnipeg team has actively taken steps to be globally competitive and a reliable supplier to Boeing,” said Ross R. Bogue, vice president and general manager, Boeing Fabrication, Boeing Commercial Airplanes. “We value the Canadian aerospace industry by consistently placing work with our Boeing Canadian facilities and supplier partners.”

This site investment and contract award supports Boeing’s continued presence in Winnipeg and enduring relationship with Canadian industry. These investments are aligned to the Industrial & Regional Benefits policy.

Canada is one of the largest international supplier bases for Boeing. Today, Boeing has 1,900 employees across Canada and partners with more than 200 major suppliers across the country. Combined with the Boeing facilities, this supply network significantly contributes to the Canadian economy by generating approximately $1 billion in business annually in Canada. Boeing Winnipeg is the largest aerospace composite manufacturing centre in Canada and manufactures complex composite parts for the 737, 747, 767, 777 and 787 airplanes.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>