Business

April 24, 2013

Pratt & Whitney Rocketdyne reaches milestone in development of next rocket engine for human spaceflight

CANOGA PARK, Calif. – Pratt & Whitney Rocketdyne, the rocket-engine manufacturer that helped power American astronauts to the moon during the Apollo era, has completed the last in a series of hot-fire tests on a J-2X engine with a stub-nozzle extension at simulated altitude conditions.
This latest chapter in the development of America’s next rocket engine paves the way toward full-motion testing of the J-2X engine, which is designed to power humans to Mars. NASA has selected the J-2X as the upper-stage propulsion for the evolved 143-ton (130-metric-ton) Space Launch System, an advanced heavy-lift launch vehicle.

Pratt & Whitney Rocketdyne is a United Technologies Corp. company.

“This test series with the stub-nozzle extension was very successful,” said Walt Janowski , J-2X program manager, Pratt & Whitney Rocketdyne. “We completed all the objectives we set out to accomplish, and acquired important information to help us better understand how the engine will perform during flight ñ from thrust, hardware durability and combustion stability. We look forward to continuing to work with NASA to provide a safe, reliable transportation system to explore new destinations in space.”

In the latest series of tests with the stub-nozzle extension, J-2X Engine 10002 was tested six times for a total of 2,156 seconds on the A-2 test stand at John C. Stennis Space Center in Mississippi. The stub-nozzle extension allows engineers to test the engine in near-vacuum conditions, similar to what it will experience in the extreme environment of space. The next step is to move the engine to the A-1 test stand, where it will be fired to test the range of gimbal motion for its flexible parts. Engine 10002 is the second J-2X development engine built by Pratt & Whitney Rocketdyne for NASA. The first J-2X engine, Engine 10001, was tested a total of 21 times for more than 45 minutes last year. The J-2X powerpack, which consists of components on top of the engine, was tested separately 13 times for a total of more than 100 minutes at Stennis Space Center.
The engines and powerpack were fired at varying pressures, temperatures and flow rates to ensure the engine is ready to support exploration beyond low-Earth orbit, Mars and beyond.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 23, 2014

News: Israel’s Iron Dome defense in line for tripled U.S. spending - Israel’s iron Dome missile defense system may end up getting triple the U.S. funding that the Defense Department sought for it in March. Ukraine asked U.S. for systems to counter Russian missiles - A month before the United States says a Russian missile likely brought...
 
 

News Briefs July 23, 2014

U.S. military deaths in Afghanistan at 2,194 As of July 22, 2014, at least 2,194 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. The AP count is three less than the Defense Department’s tally. At least...
 
 
Raytheon photograph

Raytheon completes key Air, Missile Defense Radar reviews

Raytheon photograph Partially-populated, full-sized Air and Missile Defense Radar array. Raytheon has completed two critical program reviews for the new Air and Missile Defense Radar, the U.S. Navy’s next generation integ...
 

 
Insitu photograph

Insitu demonstrates long endurance capabilities of Integrator unmanned aircraft

Insitu photograph Insitu’s Integrator unmanned aircraft recovers via SkyHook; the aircraft recently completed a 24-hour endurance flight. Insitu announced July 22 the successful 24-hour flight of its Integrator unmanned a...
 
 

NASA partners punctuate summer with spacecraft development advances

Spacecraft and rocket development is on pace this summer for NASA’s aerospace industry partners for the agency’s Commercial Crew Program as they progress through systems testing, review boards and quarterly sessions under their† Space Act Agreements with the agency. NASA engineers and specialists continue their review of the progress as the agency and partners move...
 
 

U.S. Navy selects Northrop Grumman for ship self-defense system

The U.S. Navy has awarded Northrop Grumman a $12 million task order for a full range of engineering services to continue modernizing the Ship Self-Defense System Mark 2. The contract has a potential value of $61 million over five years, if all options are exercised. SSDS MK2 is a combat system designed for anti-air defense...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>