Defense

April 24, 2013

Readiness, modernization in flux, Air Force secretary says

The Air Force will see few force structure changes this year, but readiness and modernization accounts will be in flux this year and next, Air Force Secretary Michael B. Donley said April 23.

The secretary also told the Defense Writers’ Group that now is the time for another base realignment and closure process.

Readiness and modernization will be problems for the service, Donley said. Air Force readiness has declined since 2003 as the service concentrated on providing support for counterinsurgency operations in Iraq and Afghanistan, he explained, and providing combat power for the full spectrum of operations has decayed.

“Air-to-air combat, suppression of enemy defenses [and] operations in a contested air environment have not gotten the attention they deserve, and readiness has declined in that respect,” Donley said.

The service had been working to rebuild readiness, he said, but sequestration spending cuts have thrown that effort out the window. Troops and aircraft deploying in support of operations are top notch and receive the training, equipment and supplies they need, the Air Force secretary said, but stateside training has been slashed.

A flying hour reduction of 18 percent is concentrated in the last six months of the fiscal year, and only to stateside-based units, Donley said.

“We are standing down nine fighter squadrons, three bomber squadrons, … and there will be an additional bomber squadron this summer when it returns from deployment,” he added. “It will make the challenge of readiness in [fiscal year 2014] that much harder.”

Some of the recovery from this drawdown will take months, but for depot-level maintenance, which the service is deferring, recovery may take a year or more, he said.

Modernization remains an overarching problem for the Air Force, the secretary said. The average age of the air fleet is increasing, with some aircraft – B-52 bombers and KC-135 tankers – being far older than their crews, he noted.

The Air Force must modernize across the board, Donley said. In addition to its fighters, bombers, tankers and trainers, he said, the service also must modernize satellite capabilities and intelligence, surveillance and reconnaissance capabilities.

“Every mission area that you can think of needs to be modernized,” he added.

The fiscal situation could be the Air Force’s best chance to eliminate excess infrastructure, Donley said.

“It’s a significant forcing function,” he added, noting that Air Force officials estimate the service has roughly 20 percent excess infrastructure by square footage. Eight closures conducted during the 2005 base realignment and closure round, he said, were relatively small.

Since then, the Air Force has retired more than 500 aircraft, and the number of personnel has shrunk. The best way to do this is to retire aircraft and eliminate the infrastructure that supports those aircraft, Donley said, but aircraft retirement decisions and base closure decisions are made in separate worlds. The Air Force did do this in a drawdown during the 1990s, he added, but has not since then.

 




All of this week's top headlines to your email every Friday.


 
 

 

Hurricane Hunters to fly Tropical Storm Erika

The Air Force Reserve Hurricane Hunters are operating out of Homestead Air Reserve Base, Fla., flying their state-of-the-art WC-130J Super Hercules into Tropical Storm Erika in support of the National Hurricane Center in Miami. The 53rd Weather Reconnaissance Squadron flew four missions into the tropical storm from their deployed location at St. Croix in the...
 
 

Pentagon probing alleged distorting of war intelligence

The Pentagon’s inspector general is investigating an allegation that the military command overseeing the anti-Islamic State campaign distorted or altered intelligence assessments to exaggerate progress against the militant group, a defense official said Aug. 26. The official was not authorized to discuss the probe publicly and so spoke on condition of anonymity. The investigation was...
 
 
LM-C130

U.S. Air Force receives additional MC-130J Commando II

MARIETTA, Ga., Aug. 27, 2015 – A crew from the U.S. Air Force Aug. 27 ferried a new MC-130J Commando II aircraft assigned to Air Force Special Operations Command to Cannon Air Force Base, N.., from the Lockheed Martin facilit...
 

 
af-uav4

Arming the RPAs

Air Force photograph by TSgt. Joseph Swafford A1C Matthew Lopez (center), 62nd Expeditionary Reconnaissance Squadron munitions systems technician, builds a GPS-guided GBU-49 bomb at Kandahar Airfield, Afghanistan, Aug. 15, 2015...
 
 
dragon-lady1

Local efforts help keep Dragon Lady flying at 60

Air Force photograph by Airman 1st Class Bobby Cummings A U-2 Dragon Lady soars above the flightline at Beale Air Force Base, Calif., Jan. 22, 2014. The low-altitude handling characteristics of the aircraft and bicycle-type lan...
 
 
Air Force photograph

U.S. Navy awards production contract for additional P-8A aircraft, first RAAF planes

Air Force photograph A P-8A Poseidon maritime patrol and reconnaissance aircraft parked on the tarmac during a BALTOPS 2015 mission on the flightline of Spangdahlem Air Base, Germany, June 9, 2015. The U.S. Navy awarded a nearl...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>