Local

April 26, 2013

Edwards test team extends KC-135 capabilities

Known as “The Mighty War Wagon” of the United States Air Force, the KC-135 Stratotanker has proven to be the core aerial refueling capability for the Air Force for more than 50 years.

With the help of the 418th Flight Test Squadron at Edwards, along with a multitude of testers, the KC-135 Block 45 test team recently completed a series of tests in April to help extend the aircraft’s service life for decades.

“There are currently 419 KC-135s and 59 KC-10s that enhance the Air Force’s capability to accomplish its primary mission of Global Reach while providing aerial refueling support to Air Force, Navy, Marine Corps and allied nation aircraft. These aircraft also provide mission support including cargo, aeromedical evacuation, personnel transport, and a variety of other specialized missions,” said Maj. John Mikal, 418th FLTS KC-135 Block 45 lead project test pilot. “Increasing the life expectancy of the current Air Force tanker fleet is critical. Ongoing upgrade programs help to ensure there is no gap in these mission capabilities, while the new KC-46 program starts replacing the aging KC-135 fleet.”

As part of the KC-135 Block 45 upgrades, Mikal said they included a digital flight director, a radar altimeter, an electronic engine instrument display, and Automatic Flight Control System or Autopilot for Communications, Navigation, Surveillance/Air Traffic Management (CNS/ATM) requirements in order to maintain global airspace access.

“Maintenance sustainability was another item that was looked at, which addresses the need to deal with parts that are obsolete, since no one makes the old parts anymore,” said Mikal. “Commercial off-the-shelf equipment or systems will be used to replace the existing analog flight director, radio altimeter, autopilot, and 21 cockpit engine instruments with newer digital technology equipment that will be integrated into the existing avionics.”

According to Mikal, the new upgrades will ensure:

 

* the extension and improvement of mission capability and sustainability of the KC-135 fleet

* the new digital avionics technology integrated into the legacy system will increase safety, efficiency and reliability

* effective replacement of obsolete components

* the KC-135 meets current and future CNS/ATM requirements, allowing unrestricted operations in commercial and military airspace throughout the world.

 

“The Block 45 modification was needed to extend the KC-135 aircraft as a viable weapon system through fiscal year 2040,” added Mikal. “The Block 45 systems mitigate capability gaps and improve overall KC-135 shortcomings in reliability, maintainability and supportability.”

At the initial start of the KC-135 Block 45 program, it was originally estimated that testing would end in March 2011, but the technical challenge of integrating the new digital systems proved to be very challenging, according to the test team.

“It took an amazing amount of ingenuity and hard work by the collective KC-135 Block 45 upgrade team, due to the program experiencing a two-month stop in test in early 2012 to determine the cause of a structural coupling event which occurred during flight test,” Mikal said. “While clearing the aerial refueling envelope, the performance of the new autopilot altitude hold was so good, re-adjustment was required to improve stability during aerial refueling coupled flight.”

Along with the 418th, the massive, multi-year undertaking required support from more than 90 members to overcome technical hurdles and prevent the very real threat of program cancellation. Of those included, individuals were acquired from the 412th Test Wing, 412th Operations Group, 412th Test and Engineering Group, 773rd Test Squadron, 775th Test Squadron, 370th Flight Test Squadron, 445th Flight Test Squadron, the KC-135 System Program Office, Rockwell Collins, Air Mobility Command Test and Evaluation Squadron Detachment 3, AMC Air, Space and Information Operations (A3), and McConnell Air Force Base, Kansas.

“There were only two KC-135 aircrew in the 418th FLTS when the program started. Eventually, the 418th FLTS KC-135 aircrew numbered four; even so, Test Operations was largely instrumental in supporting the program with their KC-135 aircrew,” said Mikal.

Most notably though was the Edwards team, which was able to complete the final testing $200,000 below cost and three weeks ahead of new schedule through extremely efficient testing and test execution flexibility despite regular scope changes, priority changes, funding rebaseline, weather cancellations, maintenance issues, resource rescheduling/constraints, and the ultimate challenge of addressing the AR oscillation issue with no additional schedule or funding impacts.

“In the end, the Global Reach Combined Test Force test team proved to be a pivotal contributor, bringing this challenged program to a successful completion,” added Mikal. “Successful completion of this program has secured the opportunity to field Block 45 to the KC-135 fleet, while preventing the otherwise inevitable reduction in overall mission effectiveness due to avionics obsolescence and CNS/ATM airspace access issues. Without the KC-135 Block 45, 88-percent of the U.S. Air Force tanker assets would eventually be unable to complete their mission.”

It is currently estimated that the first 179 KC-46 aircraft will be delivered by 2028.KC

 




All of this week's top headlines to your email every Friday.


 
 

 
CofC1

AFTC needs to be ‘agile, ready, right’

Air Force photograph by Rebecca Amber Gen. Ellen Pawlikowski, commander of Air Force Materiel Command, hands the Air Force Test Center guidon to Maj. Gen. David Harris June 18. Harris assumed command from Maj. Gen. Arnold W. Bu...
 
 
Northrop Grumman photograph

Northrop Grumman hosts robotics, computer science projects for San Fernando Valley students

Northrop Grumman photograph During the High School Involvement Partnership program expo on May 15 in Woodland Hills, Alex Surat, a Canoga Park High School senior, demonstrated a mobile phone application that he built and progra...
 
 

New AIM-9X Sidewinder missile completes Operational Test and Evaluation live fires

The U.S. Navy and Raytheon have completed operational testing and evaluation live fires of the AIM-9X® Sidewinder Block II infrared air-to-air missile. Testing and evaluation consisted of 16 planned shots against a mix of full-scale and sub-scale targets. The U.S. government is now finalizing approval, acceptance and delivery of Block II missiles to the U.S....
 

 
Lockheed Martin photograph

Lockheed Martin, Raytheon, Bombardier join forces for JSTARS recap program

Lockheed Martin photograph Left to right: Rick Yuse, Raytheon, Orlando Carvalho, Lockheed Martin, and Alain Bellemare, Bombardier, meet at the Paris Air show, representing their best of breed team for the Air Force’s JSTARS ...
 
 

Northrop Grumman awards grants to San Fernando Valley area teachers

Northrop Grumman recently awarded grants worth $3,600 to Los Angeles-area schools in support of science, technology, engineering and mathematics education initiatives. Through the company’s National Engineers Week STEM grants program, Northrop Grumman provided 12 individual grants of $300 each to teachers in local schools to fund projects that promote STEM education and awareness. Teacher...
 
 
Photographs by Linda KC Reynolds

Lockheed Martin donates to Habitat for Heroes

Photographs by Linda KC Reynolds Lockheed Martin Corporation donates $15,000 to Habitat for Humanity and help paint and trench a phase of new homes that are already sold to low income veterans. Veterans are one step closer to m...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>