Tech

May 8, 2013

NASA extends electrical systems engineering services contract

NASA has extended its interim contract with MEI Technologies Inc. of Houston for electrical systems engineering services.

The ordering period has been extended for five months from May 9 to Oct. 8. The maximum ordering value of this indefinite-delivery, indefinite-quantity contract has been increased by about $50 million to a total of about $287 million. This extension has been implemented to sustain performance until the Engineering Systems Engineering Services II follow-on contract is awarded.

Under this contract, MEI Inc. performs tasks that are necessary for the study, design, development, fabrication, integration, testing, verification, and operations of spaceflight, airborne, and ground system hardware and software. Contract responsibilities also include development and validation of new technologies to enable future space and science missions in support of the Applied Engineering and Technology Directorate at NASA’s Goddard Space Flight Center in Greenbelt, Md.

Task orders issued under the contract provide critical support to a wide range of NASA’s missions and projects including Global Precipitation Measurement, Magnetospheric MultiScale, Landsat Data Continuity Mission, James Webb Space Telescope, Soil Moisture Active-Passive, Soft X-Ray Spectrometer for the Astro-H mission, and the Advanced Topographic Laser Altimeter System.

 




All of this week's top headlines to your email every Friday.


 
 

 
NASA photograph by Chris Rink

NASA flies stormy Kansas Skies this summer for science

NASA photograph by Chris Rink Richard Ferrare, a senior research scientist from the Atmospheric Sciences Division at NASA Langley Research Center in Hampton, Va., monitors the data input from the Lidar Atmospheric Sensing Exper...
 
 
NASA photograph by Carla Thomas

DC-8 reaches milestone

NASA photograph by Carla Thomas NASA’s DC-8 makes a low approach to Edwards Air Force Base. NASA’s DC-8 Flying Laboratory recently reached its third decade of delivering groundbreaking science. As a way to celebrate...
 
 
NASA photograph by Tom Tschida

NASA Armstrong leads team to test effects of volcanic ash on aircraft engines

NASA photograph by Tom Tschida Volcanic ash is sprayed into one of the F117 engines of a C-17 during the final phase of the Vehicle Integrated Propulsion Research (VIPR) project July 9 at Edwards. The VIPR team, comprised of NA...
 

 
NASA photograph

NASA, partners test unmanned aircraft systems

NASA photograph NASA’s Ikhana is being used to test a system that will allow uncrewed aircraft to fly routine operations within the National Airspace System. NASA, working with government and industry partners, is testing...
 
 
NASA photograph

NASA-developed air traffic management tool flies into use

NASA photograph NASA Future Flight Central is a national Air Traffic Control/Air Traffic Management (ATC/ATM) simulation facility. The two-story facility offers a 360-degree full-scale, real-time simulation of an airport, where...
 
 
NASA photograph

Robotics teams prepare to compete for $1.5 million in NASA Challenge

NASA photograph The Los Angeles team Survey’s robot is seen as it conducts a demonstration of the level two challenge during the 2014 NASA Centennial Challenges Sample Return Robot Challenge, Thursday, June 12, 2014, at t...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>