Space

May 15, 2013

Sierra Nevada’s Dream Chaser testing begins at NASA Dryden, Langley

EDWARDS, Calif. — Sierra Nevada Corporation’s Space Systems Dream Chaser flight vehicle arrived at NASA’s Dryden Flight Research Center in Edwards, Calif., May 15 to begin tests of its flight and runway landing systems.

The tests are part of pre-negotiated, paid-for-performance milestones with NASA’s Commercial Crew Program, which is facilitating U.S.-led companies’ development of spacecraft and rockets that can launch from American soil. The overall goal of CCP is to achieve safe, reliable and cost-effective U.S. human access to and from the International Space Station and low-Earth orbit.

Tests at Dryden will include tow, captive-carry and free-flight tests of the Dream Chaser. A truck will tow the craft down a runway to validate performance of the nose strut, brakes and tires. The captive-carry flights will further examine the loads it will encounter during flight as it is carried by an Erickson Skycrane helicopter. The free flight later this year will test Dream Chaser’s aerodynamics through landing.

Meanwhile, on the east coast, several NASA astronauts will be at the agency’s Langley Research Center in Hampton, Va., this week to fly simulations of a Dream Chaser approach and landing to help evaluate the spacecraft’s subsonic handling. The test will measure how well the spacecraft would handle in a number of different atmospheric conditions and assess its guidance and navigation performance.

“Unique public-private partnerships like the one between NASA and Sierra Nevada Corporation are creating an industry capable of building the next generation of rockets and spacecraft that will carry U.S. astronauts to the scientific proving ground of low-Earth orbit,” said William Gerstenmaier, NASA’s associate administrator for human exploration and operations in Washington. “NASA centers around the country paved the way for 50 years of American human spaceflight, and they’re actively working with our partners to test innovative commercial space systems that will continue to ensure American leadership in exploration and discovery.”

The Dream Chaser Space System is based on Langley’s Horizontal Lander HL-20 lifting body design concept. The design builds on years of analysis and wind tunnel testing by Langley engineers during the 1980s and 1990s. Langley and SNC joined forces six years ago to update the HL-20 design in the Dream Chaser orbital crew vehicle. In those years SNC has worked with to refine the spacecraft design. SNC will continue to test models in Langley wind tunnels. Langley researchers also helped develop a cockpit simulator at SNC’s facility in Louisville, Colo., and the flight simulations being assessed at the center.

NASA is partnered with SNC, Space Exploration Technologies (SpaceX) and Boeing to meet CCP milestones for integrated crew transportation systems under the Commercial Crew Integrated Capability (CCiCap) initiative. Advances made by these companies under their funded Space Act Agreements ultimately are intended to lead to the availability of commercial human spaceflight services for government and commercial companies.

While NASA works with U.S. industry partners to develop commercial spaceflight capabilities, the agency also is developing the Orion spacecraft and the Space Launch System, a crew capsule and heavy-lift rocket to provide an entirely new capability for human exploration. Designed to be flexible for launching spacecraft for crew and cargo missions, SLS and Orion will expand human presence beyond low-Earth orbit and enable new missions of exploration in the solar system.




All of this week's top headlines to your email every Friday.


 
 

 
ATK

ATK completes installation of world’s largest solid rocket motor for ground test

ATK The first qualification motor for NASA’s Space Launch Systems booster is installed in ATK’s test stand in Utah – ready for a March 11 static-fire test. NASA and ATK have completed installing the first Spac...
 
 
ULA photograph

Third Lockheed Martin-built MUOS satellite launched, responding to commands

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Complex 41 at...
 
 
ULA photograph

ULA successfully launches Navy’s Mobile User Objective System-3

ULA photograph The U.S. Air Force’s 45th Space Wing successfully launched the third Mobile User Objective System (MUOS) satellite, built by Lockheed Martin, for the U.S. Navy at 8:04 p.m. Jan. 20, 2015, from Launch Comple...
 

 

Aerojet Rocketdyne Propulsion supports launch, flight of third MUOS satellite

Aerojet Rocketdyne played a critical role in successfully placing the third of five planned Mobile User Objective System (MUOS-3) satellites, designed and built by Lockheed Martin, into orbit for the U.S. Navy. The mission was launched from Cape Canaveral Air Force Station in Florida aboard a United Launch Alliance Atlas V rocket, with five Aerojet...
 
 
LM-MUOS-satellite

U.S. Navy poised to Launch Lockheed Martin-built MUOS-3 satellite

The U.S. Navy and Lockheed Martin are ready to launch the third Mobile User Objective System satellite, MUOS-3, from Cape Canaveral Air Force Station, Fla., Jan. 20 aboard a United Launch Alliance Atlas V rocket. The launch win...
 
 

NASA, NOAA find 2014 warmest year in modern record

https://www.youtube.com/embed/-ilg75uJZZU?enablejsapi=1&rel=0 The year 2014 ranks as Earth’s warmest since 1880, according to two separate analyses by NASA and National Oceanic and Atmospheric Administration scientists. The 10 warmest years in the instrumental record, with the exception of 1998, have now occurred since 2000. This trend continues a long-term warming of the planet, acc...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>