Space

May 17, 2013

NASA’s asteroid sample return mission moves into development

NASA’s first mission to sample an asteroid is moving ahead into development and testing in preparation for its launch in 2016.

The Origins-Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRIS-REx) passed a confirmation review May 15 called Key Decision Point-C. NASA officials reviewed a series of detailed project assessments and authorized the spacecraft’s continuation into the development phase.

OSIRIS-REx will rendezvous with the asteroid Bennu in 2018 and return a sample of it to Earth in 2023.

“Successfully passing KDP-C is a major milestone for the project,” said Mike Donnelly, OSIRIS-REx project manager at NASA’s Goddard Space Flight Center in Greenbelt, Md. “This means NASA believes we have an executable plan to return a sample from Bennu. It now falls on the project and its development team members to execute that plan.”

Bennu could hold clues to the origin of the solar system. OSIRIS-REx will map the asteroid’s global properties, measure non-gravitational forces and provide observations that can be compared with data obtained by telescope observations from Earth. OSIRIS-REx will collect a minimum of 2 ounces (60 grams) of surface material.

“The entire OSIRIS-REx team has worked very hard to get to this point,” said Dante Lauretta, OSIRIS-REx principal investigator at the University of Arizona in Tucson. “We have a long way to go before we arrive at Bennu , but I have every confidence when we do, we will have built a supremely capable system to return a sample of this primitive asteroid.”

The mission will be a vital part of NASA’s plans to find, study, capture and relocate an asteroid for exploration by astronauts. NASA recently announced an asteroid initiative proposing a strategy to leverage human and robotic activities for the first human mission to an asteroid while also accelerating efforts to improve detection and characterization of asteroids.

NASA’s Goddard Space Flight Center in Greenbelt, Md. will provide overall mission management, systems engineering and safety and mission assurance. The University of Arizona in Tucson is the principal investigator institution. Lockheed Martin Space Systems of Denver will build the spacecraft. OSIRIS-REx is the third mission in NASA’s New Frontiers Program. NASA’s Marshall Space Flight Center in Huntsville, Ala., manages New Frontiers for NASA’s Science Mission Directorate in Washington.




All of this week's top headlines to your email every Friday.


 
 

 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 
 

Lockheed Martin wins Alaska spaceport bid

ANCHORAGE, Alaska – The state-owned space agency Dec. 12 named Lockheed Martin the winner of a bidding process to reconfigure a launch pad to accommodate larger rockets than what the Kodiak Launch Complex can currently handle. Lockheed Martin beat out three other bidders to reconfigure launch pad one at the Kodiak site, officials with the...
 

 
LM-orion-recover

Orion spacecraft heading home after successful at-sea recovery by U.S. Navy, NASA

Engineers are getting their first look at the Lockheed Martin-built Orion spacecraft following its successful flight test and recovery Dec. 5. With the spacecraft recovered from the Pacific and brought to port in San Diego, tec...
 
 
Northrop Grumman image

Northrop Grumman to supply navigation system for SBIRS GEO-5 satellite

Northrop Grumman image Artist’s rendering of the Space-Based Infrared System’s Geosynchronous Earth Orbit satellite.   WOODLAND HILLS, Calif. –¬†Northrop Grumman has been selected by prime contractor Lock...
 
 
boeing-spacecraft

Boeing CST-100 spacecraft moves another step closer to flight

Boeing and NASA recently completed the Ground Segment Critical Design Review and set the baseline design for the company’s Commercial Crew Transportation System, moving a step closer to the planned early 2017 voyage to th...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>