Space

May 29, 2013

ATK Technologies support launch of ULA’s Delta IV rocket carrying WGS-5

ATK propulsion and composite technologies supported the May 24 successful launch of a United Launch Alliance Delta IV rocket from Space Launch Complex 37B at Cape Canaveral Air Force Station, Fla.

This rocket carried the Wideband Global SATCOM (WGS-5) into orbit for the U.S. Air Force.

WGS-5 is the fifth satellite delivered by prime contractor Boeing as part of the WGS system that provides flexible, high-capacity communications for the nation’s war fighters.

WGS provides an order of magnitude increase in military communications bandwidth, providing high data rate and long-haul communications for Marines, soldiers, sailors and airmen worldwide.

“ATK’s extensive involvement with this launch is indicative of the company’s broad capabilities in the aerospace and space markets,” said Blake Larson, president of ATK Aerospace Group. “We are pleased to continue our strong relationships with our customers on this mission.”

This was the third time the Delta IV medium-plus rocket featured four ATK 60-inch diameter Graphite Epoxy Motors (GEM-60). The 53-foot-long motors were mounted in pairs on opposing sides of the rocket, with one fixed and one vectorable nozzle per side. They burned for 90 seconds and provided more than 1.1 million pounds of thrust to assist delivery of the WGS-5 satellite to its determined orbit. The composite cases, nose cones and aeroskirts for the GEM motors were fabricated at ATK’s Clearfield, Utah, facility. The solid rocket motors were produced at ATK’s Magna, Utah, facility. ATK has manufactured 58 GEM-60 boosters for the Delta IV launch vehicle since the initial flight in 2002.

The nozzle for Delta IV’s RS-68 engine was designed and manufactured at ATK’s Promontory, Utah, facility. The Pratt & Whitney Rocketdyne-built RS-68 is the largest hydrogen-fueled engine in the world. ATK also designed and produced the nozzle’s thermal protection material, which is capable of shielding the nozzle from the extreme heat of launch when external temperatures can exceed 4,000 degrees Fahrenheit.

For the Delta IV medium-plus launch vehicle itself, ATK supplied nine key composite structures, including the Interstage that provides the interface between the Common Booster Core and the cryogenic second stage, a Centerbody that integrates the liquid oxygen (LO2) and liquid hydrogen (LH2) tanks, a Thermal Shield that protect the RS-68 engine during ignition and flight, and an LO2 Skirt. Additionally, the payload is encapsulated by a five-meter-diameter composite payload Fairing, along with required hardware for payload integration: Nose Cap, X-Panels, Payload Attach Fitting, and Payload Attach Fitting Diaphragm. The structures are five meters in diameter and range from one to 15 meters in length. They are all produced using advanced hand layup, machining and inspection techniques at ATK’s manufacturing facility in Iuka, Miss., with the exception of the X-Panels, which are produced at ATK’s facility in Clearfield, Utah.

ATK also provided the propellant tank for the Delta IV upper stage roll control system. The tank was manufactured at ATK’s Commerce, Calif., facility.

WGS supports the defense communications system, the U.S. Army’s ground mobile forces, the U.S. Air Force’s airborne terminals, the U.S. Navy’s ships at sea, the White House Communications Agency, the U.S. State Department and other special users.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 19, 2014

News: McKeon on broader military authorization: Anything can ‘fail or pass’ - Rep. Howard “Buck” McKeon, R-Calif., chairman of the House Armed Services Committee, said if Congress returns after the midterm elections to weigh a broader military authorization for the battle against Islamic State, it might not pass. Defense contractor gets 7 years for giving secrets...
 
 

News Briefs September 19, 2014

U.S. military deaths in Afghanistan at 2,203 As of Sept. 16, 2014, at least 2,203 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,823 military service members have died in Afghanistan as a result...
 
 

Pratt & Whitney, U.S. Air Force complete qualification for F135 engine testing

Pratt & Whitney, a United Technologies Corp. , together with its U.S. Air Force partner at the F135 Heavy Maintenance Center at Tinker Air Force Base, Okla., celebrated another significant milestone qualification for F135 engine testing at the Oklahoma City Air Logistics Complex. OC-ALC which in addition to engine testing is also qualified to perform...
 

 
Navy photograph

Triton has first cross-country flight from Palmdale

Northrop Grumman photograph The MQ-4C Triton Unmanned Aircraft System takes off from Northrop Grummanís Palmdale, Calif., facility Sept. 17 for its first cross-country flight to Naval Air Station Patuxent, River, Md. PALMDALE,...
 
 
Air Force photograph by Michael J. Pausic

Future of NATO: Adapting to a new security environment

Air Force photograph by Michael J. Pausic Gen. Phillip Breedlove informs the assembled crowd about the results of the recent NATO Summit and the areas of instability that affect Europe that have regional implications. Seated in...
 
 
Air Force photograph by Scott M. Ash

AFRL commander describes Air Force’s technology vision

Air Force photograph by Scott M. Ash Maj. Gen. Thomas Masiello takes a question from an audience member after discussing Air Force Research Laboratory breakthrough technologies during the 2014 Air Force Association’s Air ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>