Business

June 3, 2013

Boeing Commercial Airplanes Engineering realigns for future growth, competitiveness

Boeing announced May 31 it is establishing new centers for engineering design, propulsion and out-of-production airplane support for Commercial Airplanes as it continues to lay the foundation for increased competitiveness and profitable growth in its second century.

The company, which marks its 100-year anniversary in 2016, will establish engineering design centers in Washington state, South Carolina and Southern California. The centers will operate independently but cooperatively with one another and with the existing Commercial Airplanes engineering design center in Moscow, Russia.

In a related strategic move, Boeing Commercial Airplanes is establishing a propulsion operation in South Carolina to enhance the performance of future airplanes, beginning with the 737 MAX.

The new centers will add internal capability and capacity in both engineering and propulsion as the company scales up to meet unprecedented demand for commercial airplanes and services. Boeing is forecasting strong growth in commercial aviation over the next 20 years, and a market for 34,000 new airplanes estimated at $4.5 trillion. The services market is estimated at $2.4 trillion.

“Our opportunity for future growth is unprecedented and this helps us be more competitive by building on our team’s talent and capability across Boeing, the United States and around the world,” said Mike Delaney, Boeing Commercial Airplanes vice president of Engineering. “With these changes, we are structuring Boeing’s engineering operations to support that growth, reduce business risks and to consistently provide the products and services our customers expect.”

The engineering centers support Boeing’s business from product development through design, production and support.

Boeing’s new propulsion operation in South Carolina is part of “a thoughtful, disciplined approach to building our capability and capacity in integrated propulsion system design,” said Nicole Piasecki, vice president and general manager of Boeing Commercial Airplanes Propulsion Systems Division. “We intend to be the industry leader in this area. The Propulsion South Carolina team will begin with the design and assembly of the 737 MAX engine nacelle inlet and expand strategically on future airplane programs.” That work is performed by a supplier on the Next-Generation 737.

“As we look to the future, we believe that innovative propulsion-system designs are needed to capture the benefits of new, more powerful and efficient engines,” Piasecki said.

The new Southern California engineering design center will now be home to engineering support for out-of-production airplanes. Boeing’s Southern California engineering team in Long Beach is already the center for support to heritage McDonnell Douglas airplanes.

“We will leverage the new Southern California design center to create a single location for out-of-production airplane support, enabling us to streamline processes and develop common practices,” said Lynne Thompson, vice president of Boeing Customer Support.

During the next six to nine months, most out-of-production airplane support, including the 707, 727, 737-100/-200/-300/-400/-500 and 757, will move from Puget Sound to Long Beach.

Boeing also is exploring development of a design center in Kiev, Ukraine to support the Boeing Design Center in Moscow, Russia.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines November 24, 2014

News: Hagel said to be stepping down as defense chief under pressure - Defense Secretary Chuck Hagel is stepping down under pressure, the first cabinet-level casualty of President Obama’s Democratic majority in the Senate and a beleaguered national security team that has struggled to stay ahead of an onslaught of global crises. Afghan mission for U.S....
 
 

News Briefs November 24, 2014

Fog forces five U.S. choppers to land in Polish field Officials say that that fog forced five U.S. Army helicopters to make an emergency landing in a Polish field and spend the night there, the second such incident since September. The U.S. Army said 15 soldiers were moving equipment to their base in Germany Nov....
 
 
Air Force photograph by Samuel King Jr.

Navy’s first F-35C squadron surpasses 1,000 flight hours

Air Force photograph by Samuel King Jr. An F-35C Lightning II aircraft piloted by Lt. Cmdr. Chris Tabert, assigned to Strike Fighter Squadron (VFA) 101, flies the squadron’s first local sortie. The F-35C is the carrier va...
 

 
boeing-SC-787

Boeing South Carolina begins final assembly of its first 787-9 Dreamliner

Boeing has started final assembly of the 787-9 Dreamliner at its South Carolina facility. The team began joining large fuselage sections of the newest 787 Nov. 22 on schedule, a proud milestone for the South Carolina team and a...
 
 
Lockheed Martin image

Ball Aerospace equips Orion mission with key avionics, antenna hardware

Lockheed Martin image Ball Aerospace & Technologies Corp. is providing the phased array antennas and flight test cameras to prime contractor Lockheed Martin for Orion’s Exploration Flight Test-1 (EFT-1), which is an u...
 
 

Salina, Kansas, recalls anniversary of shuttered base

It has been 50 years this month since the announcement that Schilling Air Force Base was closing rattled Salina residents. The Salina Journal, which carried news of the closure in its Nov. 19, 1964, editions, reported that the economic disaster then spared no part of the community – real estate, retail, civic involvement, church attendance,...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>