Business

June 3, 2013

Newest 787 complements, extends the super-efficient family

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with 737 MAX. Many features of the livery on the original 787 are reflected in the new design, and the prominent number designator on the tail helps distinguish various models within the same product family.

Boeing has begun final assembly of the first 787-9 Dreamliner. The newest member of the 787 family began taking shape on schedule May 30 in Everett, Wash., when Boeing started joining large sections of the super-efficient jet.

“From the start, the entire 787-9 team has focused relentlessly on execution so that we fulfill the commitments to our customers,” said Mark Jenks, vice president, 787 Airplane Development, Boeing Commercial Airplanes. “Integrating the 787-9 into our production system on time is another clear sign that we are well prepared and well positioned for the work ahead.”

Boeing’s global partners delivered the first 787-9 sections to final assembly on or ahead of schedule, and strong progress continues beyond, with major assembly under way on the other flight-test airplanes. “The dedication, quality and skill of our partners are helping drive our disciplined performance,” said Jenks.

Boeing will build the first three 787-9s on its Temporary Surge Line in Everett to allow for smoother integration of the 787-9 into the production system while continuing to ramp up production across the 787 program.

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers) while using 20 percent less fuel than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

The first Boeing 787-9 Dreamliner began final assembly May 30 in Everett, Wash. Final assembly starts in the first position on the production line, shown here, where Boeing begins joining together large sections of the fuselage.

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with the 737 MAX. Many features of the livery on the original 787 are reflected in the new design. The prominent number designator on the tail helps distinguish various models within the same product family.

First flight of the 787-9 is scheduled for the second half of 2013, with first delivery to launch customer Air New Zealand set for early 2014. 20 customers around the world have ordered 355 787-9s, accounting for 40 percent of all 787 orders.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines December 17, 2014

News: U.S. Air Force tanker platform slated for year-end debut - Boeing is planning for first flight of its 767-2C – upon which the U.S. Air Force’s new KC-46 tanker will be based – by year’s end, six months late. Northrop Grumman wins $657.4 million deal to supply drones to South Korea - Northrop Grumman has won...
 
 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 

 
Coast Guard photograph

Navy demonstrates unmanned helicopter operations aboard Coast Guard cutter

http://static.dvidshub.net/media/video/1412/DOD_102145893/DOD_102145893-512×288-442k.mp4 Coast Guard photograph An MQ-8B Fire Scout UAS is tested off the Coast Guard Cutter Bertholf near Los Angeles, Dec. 5 2014. The Coast...
 
 
GPS-OCX

GPS III, OCX successfully demonstrate key satellite command, control capabilities

Lockheed Martin and Raytheon successfully completed the fourth of five planned launch and early orbit exercises to demonstrate new automation capabilities, information assurance and launch readiness of the worldís most powerfu...
 
 

Aerojet Rocketdyne successfully demonstrates 3D printed rocket propulsion system for satellites

Aerojet Rocketdyne has successfully completed a hot-fire test of its MPS-120 CubeSat High-Impulse Adaptable Modular Propulsion System. The MPS-120 is the first 3D-printed hydrazine integrated propulsion system and is designed to provide propulsion for CubeSats, enabling missions not previously available to these tiny satellites. The project was funded out of the NASA Office of Chief...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>