Business

June 3, 2013

Newest 787 complements, extends the super-efficient family

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with 737 MAX. Many features of the livery on the original 787 are reflected in the new design, and the prominent number designator on the tail helps distinguish various models within the same product family.

Boeing has begun final assembly of the first 787-9 Dreamliner. The newest member of the 787 family began taking shape on schedule May 30 in Everett, Wash., when Boeing started joining large sections of the super-efficient jet.

“From the start, the entire 787-9 team has focused relentlessly on execution so that we fulfill the commitments to our customers,” said Mark Jenks, vice president, 787 Airplane Development, Boeing Commercial Airplanes. “Integrating the 787-9 into our production system on time is another clear sign that we are well prepared and well positioned for the work ahead.”

Boeing’s global partners delivered the first 787-9 sections to final assembly on or ahead of schedule, and strong progress continues beyond, with major assembly under way on the other flight-test airplanes. “The dedication, quality and skill of our partners are helping drive our disciplined performance,” said Jenks.

Boeing will build the first three 787-9s on its Temporary Surge Line in Everett to allow for smoother integration of the 787-9 into the production system while continuing to ramp up production across the 787 program.

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers) while using 20 percent less fuel than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

The first Boeing 787-9 Dreamliner began final assembly May 30 in Everett, Wash. Final assembly starts in the first position on the production line, shown here, where Boeing begins joining together large sections of the fuselage.

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with the 737 MAX. Many features of the livery on the original 787 are reflected in the new design. The prominent number designator on the tail helps distinguish various models within the same product family.

First flight of the 787-9 is scheduled for the second half of 2013, with first delivery to launch customer Air New Zealand set for early 2014. 20 customers around the world have ordered 355 787-9s, accounting for 40 percent of all 787 orders.

 




All of this week's top headlines to your email every Friday.


 
 

 
Boeing photograph

Boeing Maritime Surveillance Aircraft ready for demonstration flights

Boeing photograph The Boeing Maritime Surveillance Aircraft program is ready for customer demonstration flights, having completed the baseline ground and flight testing of the aircraft mission systems. The Boeing Maritime Surve...
 
 

Pratt & Whitney concludes PurePowerÆ geared turbofan engine partnering

Pratt & Whitney and Kawasaki Heavy Industries Ltd. met recently to commemorate the signing of a risk and revenue-sharing collaboration agreement for KHI to provide key hardware modules for Pratt & Whitney’s PurePower Geared Turbofan engines. Pratt & Whitney is a division of United Technologies Corp. Pratt & Whitney currently has 10 worldwide GTF collaboration...
 
 

U.S. Navy approves F/A-18 Super Hornet IRST system for production

The F/A-18 Super Hornet infrared search and track system, developed and integrated by Boeing and Lockheed Martin, received approval from the U.S. Navy to enter low-rate initial production. The IRST system consists of Lockheed Martin’s IRST21 sensor, the GE Aviation FPU-13 Fuel Tank Assembly and the Meggitt Defense Industry Environmental Control unit. The system demonstrated...
 

 

DRS Technologies to upgrade electronic warfare E/A-18 mission for U.S., Australia

DRS Technologies Inc., a Finmeccanica Company,†announced Jan. 22 that it has been awarded access to an indefinite-delivery/indefinite-quantity contract for the production and delivery of up to 180 Joint Tactical Terminal-Receivers for U.S. Navy and Australian EA-18G aircraft. The contract is valued up to $12 million and will include JTT-R production engineering, test set racks, fixtures...
 
 

DRS Technologies’ groundbreaking laser designating gimbal completes first flight test

DRS Technologies Inc., a Finmeccanica Company, announced Jan. 21 that it successfully performed the first airborne demonstration of its GS205-XRZ laser designating gimbal. At less than six inches in diameter and weighing less than nine pounds, the GS205 is one of the smallest stabilized, light-weight and fully qualified targeting systems on the market. During its...
 
 
Lockheed Martin image

Lockheed Martin delivers first enhanced automated testing station for U.S. Navy aircraft fleet

Lockheed Martin image The electronic Consolidated Automated Support System (eCASS) maximizes aircraft readiness. Lockheed Martin has delivered the first electronic Consolidated Automated Support System to the U.S. Navy for maxi...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>