Business

June 3, 2013

Newest 787 complements, extends the super-efficient family

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with 737 MAX. Many features of the livery on the original 787 are reflected in the new design, and the prominent number designator on the tail helps distinguish various models within the same product family.

Boeing has begun final assembly of the first 787-9 Dreamliner. The newest member of the 787 family began taking shape on schedule May 30 in Everett, Wash., when Boeing started joining large sections of the super-efficient jet.

“From the start, the entire 787-9 team has focused relentlessly on execution so that we fulfill the commitments to our customers,” said Mark Jenks, vice president, 787 Airplane Development, Boeing Commercial Airplanes. “Integrating the 787-9 into our production system on time is another clear sign that we are well prepared and well positioned for the work ahead.”

Boeing’s global partners delivered the first 787-9 sections to final assembly on or ahead of schedule, and strong progress continues beyond, with major assembly under way on the other flight-test airplanes. “The dedication, quality and skill of our partners are helping drive our disciplined performance,” said Jenks.

Boeing will build the first three 787-9s on its Temporary Surge Line in Everett to allow for smoother integration of the 787-9 into the production system while continuing to ramp up production across the 787 program.

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers) while using 20 percent less fuel than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

The first Boeing 787-9 Dreamliner began final assembly May 30 in Everett, Wash. Final assembly starts in the first position on the production line, shown here, where Boeing begins joining together large sections of the fuselage.

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with the 737 MAX. Many features of the livery on the original 787 are reflected in the new design. The prominent number designator on the tail helps distinguish various models within the same product family.

First flight of the 787-9 is scheduled for the second half of 2013, with first delivery to launch customer Air New Zealand set for early 2014. 20 customers around the world have ordered 355 787-9s, accounting for 40 percent of all 787 orders.

 




All of this week's top headlines to your email every Friday.


 
 

 
DOD photograph by Air Force MSgt. Adrian Cadiz

Carter announces manufacturing initiative to aid war fighters

DOD photograph by Air Force MSgt. Adrian Cadiz Defense Secretary Ash Carter announces the creation of a National Manufacturing Innovation Institute to produce hybrid electronics during a speech at the National Full Scale Aerody...
 
 

U.S. Army awards CIRCM contract to Northrop Grumman

The U.S. Army Aug. 28 awarded Northrop Grumman a $35,372,762 cost-plus-fixed-fee, fixed-price incentive, and firm-fixed-price hybrid contract with options for engineering and manufacturing development and low-rate initial production of the Common Infrared Countermeasure program. Work will be performed at Northrop Grumman’s Land & Self Protection Systems Division facility in Rolling Me...
 
 

Northrop Grumman awarded position on Air Force training systems acquisition III contract

The U.S. Air Force has awarded Northrop Grumman a position on the Training Systems Acquisition III indefinite delivery/indefinite quantity contract to support war fighter training systems at global U.S. Air Force operating locations. Twelve companies have been awarded positions on TSA III, which has a ceiling value of approximately $20.9 billion over 10 years, if...
 

 
Navy photograph

Raytheon and U.S. Navy collaborate to optimize minehunting sonar

Navy photograph The Remote Minehunting System and AN/AQS-20A Minehunting Sonar on USS Independence. Raytheon is working closely with the Naval Undersea Warfare Center — Division Newport to enhance the features of the comp...
 
 

Boston Engineering receives Air Force contract to advance UAV motor control capabilities

Boston Engineering today announced a $150,000 contract from the U.S. Air Force to enhance its UAV capabilities and to also reduce drone noise. Specifically, Boston Engineering will demonstrate an embedded motor control platform to accelerate U.S. Air Force UAV research and development initiatives. Embedded motor controllers underpin critical UAV operations including drone propulsion and sensors...
 
 

Boeing receives $1.49 billion contract for 13 P-8A Poseidon ircraft

Boeing will provide the first P-8A Poseidon maritime surveillance aircraft for Australia and additional P-8As for the U.S. Navy following a $1.49 billion contract award from the Navy for 13 aircraft. The order includes nine aircraft for the U.S. Navy and four Poseidon aircraft for the Royal Australian Air Force, a long-time partner to the...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>