Business

June 10, 2013

Northrop Grumman’s F-35 supplier in Israel delivers first advanced composite component from FMS

Northrop Grumman photograph

Northrop Grumman Corporation’s supplier in Israel – Elbit Systems-Cyclone – delivered its first advanced composite component for the F-35 Lightning II joint strike fighter center fuselage produced by Northrop Grumman. This delivery is a significant milestone for the F-35 program, as it is the first composite part manufactured by a country committed to purchasing future F-35s under the U.S. foreign military sales agreement.

REDONDO BEACH, Calif. -†Northrop Grummanís supplier in Israel Elbit Systems-Cyclone ñ delivered its first advanced composite component for the F-35 Lightning II joint strike fighter center fuselage produced by Northrop Grumman.

This delivery is a significant milestone for the F-35 program, as it is the first composite part manufactured by a country committed to purchasing future F-35s under the U.S. foreign military sales agreement.

The composite component delivered is one of 16 unique parts to be manufactured by Elbit Systems-Cyclone under a seven-year F-35 agreement with Northrop Grumman, which was signed in December 2011.

“We’re anticipating receiving more than 50 component deliveries from Cyclone this year, so this is a great start and shows Cyclone’s commitment to the program,” said Michelle Scarpella, vice president of the F-35 program for Northrop Grumman Aerospace Systems. “With the first delivery under its belt, Cyclone has demonstrated that it is equipped and qualified to manufacture and deliver quality composite parts for the joint strike fighter aircraft, 19 of which Israel has committed to purchasing.”

As a principal member of the Lockheed Martin-led F-35 industry team, Northrop Grumman performs a significant share of the work required to develop and produce the aircraft. In addition to manufacturing the F-35 center fuselage, Northrop Grumman designed and produces the aircraft’s radar and other key avionics including electro-optical and communications, navigation and identification subsystems. Northrop Grumman also develops mission systems and mission-planning software, leads the team’s development of pilot and maintenance training system courseware, and manages the team’s use, support and maintenance of low-observable technologies. In 2012, the company delivered 32 center fuselages and is on track to exceed 2012 delivery quantities in 2013.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>