Space

June 21, 2013

Aerojet Rocketdyne successfully completes first in a series of full-motion tests on America’s next rocket engine

The leading rocket engine manufacturer Aerojet Rocketdyne announced June 21 that it successfully completed the first in a series of full motion hot-fire tests on the J-2X engine at John C. Stennis Space Center in Mississippi.

NASA has selected the J-2X as the upper-stage propulsion for the evolved 143-ton (130-metric ton) Space Launch System (SLS), an advanced heavy-lift launch vehicle.

“This successful test was extremely important in that it provided valuable information on how the engine will operate during flight as it steers humans aboard the Space Launch System to destinations beyond low-Earth orbit and ultimately to Mars,” said Walt Janowski, program manager, Aerojet Rocketdyne.

“The live fire also gives us an opportunity to ensure that the A-1 test stand, where the J-2X was gimbaled, will be ready to test the RS-25 engines, which will be used to power the core stage of the SLS in 2017.”

The A-1 test stand allowed engineers to gimbal, or pivot, the J-2X engine during a live firing, and to test the range of motion for the engine’s flexible parts. Gimbal tests on that stand were last performed on the Space Shuttle Main Engines, which powered all 135 space shuttle missions with 100 percent ascent mission success. Those engines, also called RS-25s, will return to the test stand in 2014 for use on the core stage of the SLS.




All of this week's top headlines to your email every Friday.


 
 

 
nasa-cassini

NASA Cassini images may reveal birth of new Saturn moon

NASA’s Cassini spacecraft has documented the formation of a small icy object within the rings of Saturn that may be a new moon, and may also provide clues to the formation of the planet’s known moons. Images taken w...
 
 

NASA completes LADEE mission with planned impact on Moon’s surface

Ground controllers at NASA’s Ames Research Center in Moffett Field, Calif., have confirmed that NASA’s Lunar Atmosphere and Dust Environment Explorer spacecraft impacted the surface of the moon, as planned, between 9:30 and 10:22 p.m., PDT, April 17. LADEE lacked fuel to maintain a long-term lunar orbit or continue science operations and was intentionally sent...
 
 
Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech

NASA’s Kepler telescope discovers first Earth-size planet in ‘habitable zone’

Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech Kepler-186f resides in the Kepler-186 system about 500 light-years from Earth in the constellation Cygnus. The system is also home to four inner planets, seen lined up...
 

 

Lockheed Martin solar ultraviolet imager installed on GOES-R weather satellite

Lockheed Martin has delivered a new solar analysis payload that will help scientists measure and forecast space weather, which can damage satellites, electrical grids and communications systems on Earth. The Solar Ultraviolet Imager instrument was integrated with the first flight vehicle of the National Oceanic and Atmospheric Administrationís next-generation Geostationary Operational Environm...
 
 
Lockheed Martin photograph

NASA’s Orion Spacecraft powers through first integrated system testing

Lockheed Martin photograph Engineers in the Operations and Checkout Building at NASAís Kennedy Space Center in Florida, perform avionics testing on the Orion spacecraft being prepared for its first trip to space later this yea...
 
 

NASA signs agreement with SpaceX for use of historic launch pad

NASA Kennedy Space Center’s historic Launch Complex 39A, the site from which numerous Apollo and space shuttle missions began, is beginning a new mission as a commercial launch site. NASA signed a property agreement with Space Exploration Technologies Corporation (SpaceX) of Hawthorne, Calif., on Monday for use and occupancy of the seaside complex along Florida’s...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>