Business

June 28, 2013

Lockheed Martin-led team lays keel on nation’s ninth Littoral Combat Ship

The keel laying ceremony for LCS 9, the future USS Little Rock, took place at Marinette Marine Corporation’s shipyard on June 27, 2013. Pictured from left to right: Monsignor James Dillenburg, Keel Laying Chaplain; Chuck Goddard, President & CEO Marinette Marine Corporation; Mrs. Janee Bonner, ship sponsor; Joe North, Lockheed Martin Vice President of Littoral Ship Systems; Francesco Valente, President & CEO Fincantieri Marine Group, and U.S. Navy Commander Nate Schneider, LCS Program Manager’s Representative, Supervisor of Shipbuilding Bath, Detachment Marinette.

A Lockheed Martin-led industry team officially laid the keel for the U.S. Navy’s ninth Littoral Combat Ship (LCS), the future USS Little Rock, in a ceremony held at Marinette Marine Corporation June 27.

The industry team is building the Freedom-variant LCS for the U.S. Navy on budget, has delivered two ships with four others under construction and two in the early material procurement stages. With the nation’s first LCS, USS Freedom, currently on its maiden deployment to Southeast Asia, the Lockheed Martin-led team is addressing the Navy’s need for an affordable, highly-networked and modular ship unlike any other in the world, designed to conduct a variety of missions including anti-surface, mine and submarine warfare.

In keeping with a time-honored tradition, ship sponsor Janée Bonner authenticated the keel by having her initials welded into a sheet of the ship’s steel. She was assisted by Marinette Marine Corporation’s President and CEO Chuck Goddard.

“It is an honor to serve as the sponsor of the future USS Little Rock, the ninth ship in a class that’s so vital to our national defense strategy,” said Janée Bonner. “This marks the beginning of my commitment to support her, as well as the brave crews that will serve on the ship to defend our country.”

The Lockheed Martin-led LCS team includes ship builder Marinette Marine Corporation, a Fincantieri company, naval architect Gibbs & Cox, as well as nearly 900 suppliers in 43 states, including approximately 30 small businesses in Wisconsin and Michigan.

“This is a great milestone for the U.S. Navy’s future USS Little Rock and for the program as we continue to deliver ships,” said Joe North, vice president of Littoral Ship Systems at Lockheed Martin Mission Systems and Training. “As we transition into serial production, we’re applying lessons-learned to the construction process that our team has learned from supporting the U.S. Navy in maintaining the team’s first and second ships.”

Lay the keel is a shipbuilding term that marks the beginning of the module erection process, which is a significant undertaking that signifies the ship coming to life. Modern warships are now largely built in a series of pre-fabricated, complete hull sections rather than a single keel, so the actual start of the shipbuilding process is now considered to be when the first sheet of steel is cut and is often marked with a ceremonial event.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines January 23, 2015

News: Yemen chaos threatens U.S. counterterror efforts, including drone program - The White House’s strategy for fighting al-Qaeda in Yemen – repeatedly presented as a model by President Obama – was left in tatters Thursday by the resignation of the man who personally approved U.S. drone strikes in the country and the collapse of its central...
 
 

News Briefs January 23, 2015

NATO detects key Russian military equipment in east Ukraine NATO’s top commander in Europe says the alliance has detected the presence of key Russian military equipment in eastern Ukraine that, in the past, has accompanied large inflows of Russian troops. Gen. Philip Breedlove told a news conference Jan. 22 in Brussels that Russian electronic warfare...
 
 
Boeing photograph

Boeing Maritime Surveillance Aircraft ready for demonstration flights

Boeing photograph The Boeing Maritime Surveillance Aircraft program is ready for customer demonstration flights, having completed the baseline ground and flight testing of the aircraft mission systems. The Boeing Maritime Surve...
 

 
Air Force photograph by Jacqueline Cowan

F135 test demonstrates success of AEDC workshare initiative

Air Force photograph by Jacqueline Cowan Aerospace Testing Alliance Test Engineer Darren Carroll, pictured in front, assists as Pratt & Whitney Test Engineer Ronnie Thomas does a borescope inspection of the fan on the F135 ...
 
 
U.S. Air Force photo by Master Sgt. Kevin J. Gruenwald

40 years of Red Flag at Nellis

U.S. Air Force photo by Master Sgt. Kevin J. Gruenwald A flight of F-15 Eagles and F-16 Fighting Falcons Aggressors fly in formation over the Nevada Test and Training Ranges June 5, 2008. The proposal for Red Flag came in early...
 
 
Lockheed Martin photograph

Navy gears up to order production of 29 aircraft diagnostic systems

Lockheed Martin photograph Petty Officers Third Class Ira Schwartz assigned to Fleet Readiness Center Southeast at Naval Air Station Jacksonville, Fla., left, and Devin Riley from Fleet Readiness Center Mid-Atlantic at Naval Ai...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>