Business

July 8, 2013

Northrop Grumman supports successful propulsion system rocket engine test

Northrop Grumman recently supported the successful test of the Minuteman III Propulsion System Rocket Engine at NASA’s White Sands Testing Facility in Las Cruces, N.M.

The PSRE is the liquid post-boost upper stage of the Minuteman III intercontinental ballistic missile. This was a designated product quality assurance test, which is a full mission duty ground static test conducted in NASA’s altitude test cell. The PQA test is performed to verify the quality of the PSRE after it is refurbished by the PSRE life-extension program. This test represents the last of seven PQA static tests for the PSRE LEP program.

“The entire ICBM team, including our Aerojet and Boeing teammates and the Air Force, celebrate the success of this program as it comes to an end with this final accomplishment,” said Tony Spehar, Northrop Grumman vice president and program manager for the ICBM Prime Integration Contract. “These PSRE tests have ensured the reliability of the nation’s deployed Minuteman fleet.”

The PSRE LEP program, initiated in 2000, is managed under a joint partnership between Northrop Grumman and the U.S. Air Force. The program is responsible for refurbishing the entire Minuteman III fleet of PSREs and extending its service life through 2030. Upon completion of the program last month, 558 PSREs will have been delivered to the Air Force.




All of this week's top headlines to your email every Friday.


 
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. â...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 

General Dynamics to continue work on U.S. Air Force GPS III program

General Dynamics Advanced Information Systems, a business unit of General Dynamics, has been awarded a $25.4 million full-production contract from Lockheed Martin to support the U.S. Air Force Global Positioning System (GPS) III Network Communications Element for space vehicles seven and eight. The Air Force’s next-generation GPS III satellites will improve position, navigation and timing...
 

 

Javelin joint venture demonstrates vehicle-mounted missile launch

The Raytheon and Lockheed Martin Javelin Joint Venture recently fired a Javelin missile from a remote weapon station integrated onto a wheeled vehicle at Redstone Arsenal in Huntsville, Ala. The test demonstrated Javelin’s vehicle-launch capability to an international customer that has expressed interest in purchasing vehicles integrated with Javelin. The Javelin missile launched successfully...
 
 

Royal Australian Air Force scores direct hit with JSOW C

The Royal Australian Air Force has successfully tested a Raytheon Joint Standoff Weapon C against a hardened wall target at the RAAF Woomera Test Range. Launched from an F/A-18F Super Hornet at an operationally representative stand-off range and altitude of 25,000 feet, the JSOW C scored a direct hit. The RAAF test marked the third...
 
 

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C. Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>