Defense

July 17, 2013

First B-52 departs to depot for communications upgrade

Tags:
TSgt. Mike Andriacco
Barksdale AFB, La.

TSgt. Michael Zeigler and Staff Sgt. Aaron McCullum prepare to launch a B-52H Stratofortress July 16, 2013 on Barksdale Air Force Base, La. The B-52 was sent to Tinker Air Force Base, Okla., to receive the first Combat Network Communications Technology upgrade. The change will allow aircrew to receive real-time intelligence updates. Zeigler is assigned to the 96th Aircraft Maintenance Unit and McCullum is assigned to the 2nd Aircraft Maintenance Squadron.

The first B-52H Stratofortress departed Barksdale Air Force Base, La., July 16 is enroute to the depot at Tinker AFB, Okla., for the Combat Network Communications Technology, or CONECT,†upgrade.

The CONECT upgrade will allow B-52 crews to receive and send real-time digital information such as updated intelligence, mapping or targeting information while the aircraft is in flight.

“The CONECT modification will replace the evolutionary data link, and become a permanent part of the aircraft,” said CMSgt. Jeffrey Buxton, the†2nd Maintenance Group superintendent. “CONECT gives us the digital infrastructure that will be instrumental in future modifications to the B-52 aircraft.”

The CONECT upgrades include software and hardware such as new servers, modems, radios, data-links, receivers and digital workstations for the crew and will change the current appearance of the B-52 avionics system.

“It’s going to look considerably different,” Buxton said. “There will be six new monitors in the aircraft which will give us increased functionality. We’ll be able to tie in more systems to those monitors.”
The new displays will exhibit a multifunction, colored moving map at each crew position. This ensures all data is available to each crew member at all times.

“While we are traversing the world to get from point A to point B, we are actually receiving information regarding the battlefield in a real-time, immediate situation,” said Maj. Maxwell Dipietro, the 20th Bomb Squadron director of operations. “We will arrive to the battlefield with all the information we need to prosecute targets.”

A lot of effort went into the development of the new system and making sure that once newly installed in an aircraft, getting familiar with it would not be a lengthy process or a detriment to the mission.
“The great thing about this equipment is that a lot of it is based on the foundation of the equipment we currently have in the evolutionary data link,” Dipietro said. “So a lot of the training will be similar.”
This means that minimal training will be required to bring aircrews up to speed on the new equipment.

“There will be some indoctrination to the new equipment, but basically, our guys won’t skip a beat as far as incorporating this and utilizing this equipment,” Dipietro said.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 24, 2015

News: More than $1 billion in U.S. emergency reconstruction aid goes missing in Afghanistan - A total of $1.3 billion that the Pentagon shipped to its force commanders in Afghanistan between 2004 and 2014 for the most critical reconstruction projects can’t be accounted for by the Defense Department, 60 percent of all such spending under an...
 
 

News Briefs April 24, 2015

German defense minister: widely used rifle has no future A widely used assault rifle has “no future” with the German military in its current form, Germany’s defense minister said April 22, escalating a dispute over the weapon’s alleged shortcomings. Ursula von der Leyen said last month that a study showed the G36 rifle has a...
 
 
Army photograph

Composites key to tougher, lighter armaments

Army photograph XM-360 test firing at Aberdeen Proving Ground, Md., in 2007, is shown. The Army is on the cusp of revolutionizing materials that go into armament construction, making for stronger, lighter and more durable weapo...
 

 

Northrop Grumman signs long-term agreement with Raytheon

Northrop Grumman has entered a long-term agreement with Raytheon to supply its LN-200 Inertial Measurement Unit for Raytheon optical targeting systems. The long-term agreement with Raytheon’s Space and Airborne Systems business extends through 2018. The LN-200 provides camera stabilization on optical targeting systems that conduct long-range surveillance and target acquisition for various...
 
 

NTTR supports first F-35B integration into USMC’s weapons school exercise

The Nevada Test and Training Range was part of history April 21, when four U.S. Marine Corps-assigned F-35B Lightning IIs participated in its first Marine Corps’ Final Exercise of the Weapons and Tactics Instructor course on the NTTR’s ranges. The Final Exercise, or FINEX, is the capstone event to the U.S. Marine Corps Marine Aviation...
 
 
AAR-Textron

AAR awarded new contract from Bell Helicopter Textron to support T64 engines

AAR announced April 22 that Bell Helicopter Textron Inc. awarded its Defense Systems & Logistics business unit a contract providing warehouse and logistics services in support of upgrading T64 engines for the Bell V-280 Val...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>