Space

July 24, 2013

Tenth parachute test for NASA’s Orion adds 10,000 feet of success

A complicated, high-altitude test July 24 demonstrated NASA’s new Orion spacecraft could land safely even if one of its parachutes failed.

The 10th in a series of evaluations to check out the Orion multipurpose crew vehicle’s parachute system dropped the test capsule from a C-17 aircraft at its highest altitude yet, 35,000 feet above the Arizona desert. One of three massive main parachutes was cut away early on purpose, leaving the spacecraft to land with only two. The test at the U.S. Army’s Yuma Proving Ground was the highest-altitude test of a human spacecraft parachute since NASA’s Apollo Program.

During previous tests, a mock capsule was dropped from a height of 25,000 feet and the parachutes deployed at no higher than 22,000 feet. The extra 10,000 feet of altitude at the beginning of Wednesday’s test made the demonstration the best so far of Orion’s parachute flight and landing.

“The closer we can get to actual flight conditions, the more confidence we gain in the system,” said Chris Johnson, project manager for the Orion capsule parachute assembly system at NASA’s Johnson Space Center in Houston. “What we saw today – other than the failures we put in on purpose – is very similar to what Orion will look like coming back during Exploration Flight Test-1′s Earth entry next year.”

During its return from space, Orion’s parachute system will begin to deploy 25,000 feet above the ground.

Engineers gathered data on the effects of losing a parachute during the descent. The team already proved Orion can land with just two of its three main parachutes, but this was the first opportunity to study how one parachute pulling away in mid-flight might affect the remaining two.

“We wanted to know what would happen if a cable got hooked around a sharp edge and snapped off when the parachutes deployed,” said Stu McClung, Orion’s landing and recovery system manager at Johnson. “We don’t think that would ever happen, but if it did, would it cause other failures? We want to know everything that could possibly go wrong, so that we can fix it before it does.”

The test was part of a series of parachute tests that will enable NASA to certify Orion to carry humans into space. The system already has met the necessary requirements for Orion’s first mission, Exploration Flight Test-1 (EFT-1), in September 2014. During that flight, Orion will travel 3,600 miles into orbit then return to Earth at speeds as fast as 20,000 mph, putting the parachute system to the test again as it lands in the Pacific Ocean.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 25, 2014

News: U.S. sends second carrier to Asia amid tensions with China - The Navy is sending a second aircraft carrier strike group to the Asia Pacific region amid new tensions with China over a dangerous aerial encounter between a Chinese interceptor and a Navy P-8 surveillance aircraft. SpaceX rocket explodes during test flight - A SpaceX rocket...
 
 

News Briefs August 25, 2014

China says U.S. plane intercept was professional China’s Defense Ministry has rejected U.S. accusations that a Chinese fighter jet conducted a dangerous intercept of a U.S. Navy surveillance aircraft off the coast of China in international airspace. The ministry issued a statement Aug. 23 attributed to spokesman Yang Yujun calling the U.S. accusations groundless. It...
 
 

Ukraine plans $3 billion boost to defense spending

KIEV, Ukraine – Ukraine’s president announced plans Aug. 24 to boost his country’s defense spending by an estimated 50 percent as government forces seek to overpower pro-Russian separatists in the east. President Petro Poroshenko pledged to spend an extra 40 billion hryvnia ($3 billion) by 2017 during a speech marking Ukraine’s independence from the Soviet...
 

 

NASA awards research facilities, engineering support services contract

NASA has awarded a contract for research facilities and engineering support services to InuTeq, LLC of Greenbelt, Maryland, in support of the Mission Information and Test Systems Directorate at NASA’s Armstrong Flight Research Center, Edwards, Calif. This cost-plus-award-fee contract covers a one-year base period beginning Nov. 1, 2014 and four one-year options, and is valued...
 
 

Navy Awards General Dynamics contract for LCS planning yard services

The U.S. Navy awarded General Dynamics Bath Iron Works a $100 million contract to provide planning yard services for the Littoral Combat Ship program. General Dynamics Bath Iron Works is a business unit of General Dynamics. Bath Iron Works, as the LCS Planning Yard, will provide maintenance and modernization support for all Navy LCS 1...
 
 
boeing-boc

Boeing, BOC Aviation announce order for 82 airplanes

  Boeing announced Aug. 25 an order by BOC Aviation for 50 737 MAX 8s, 30 Next-Generation 737-800s and two 777-300ERs (Extended Range). The order, valued at $8.8 billion at list prices, is the largest in BOC Aviation’...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>