Business

July 26, 2013

100th jet in final production; first F-35 bound for Luke

Lockheed Martin photograph by John Wilson

 
The 100th Lockheed Martin F-35 Lightning II, the first aircraft destined for Luke Air Force Base in Glendale, Ariz., has entered the last stage of final assembly.

This conventional takeoff and landing aircraft, known as AF-41, is scheduled to arrive at the base next year.

During final assembly, the aircraft structure is completed, and electrical and hydraulic systems are added. Additionally, these systems are tested in preparation for fuel systems checks and engine runs. The final steps prior to acceptance by the Air Force include a series of checkout flights leading to the aircraft entering the service’s F-35 fleet. AF-41 is one of 126 F-35s in various stages of production worldwide.

In June, the Air Force announced its decision to increase the number of squadrons at Luke AFB to six with 144 aircraft, which will make it the largest F-35 base worldwide.  In addition to training U.S. pilots, Luke will also serve as an F-35A International Training site. Currently, Luke’s economic impact on the state of Arizona is $2.17 billion. With 14 F-35 suppliers in the state of Arizona, the program has an additional economic impact of $98 million.

 




All of this week's top headlines to your email every Friday.


 
 

 
dassault

Dassault Falcon Jet establishes new pilot operational support team

Arnaud Paulmier, head of Dassault Falcon Jet’s new operational support team. Dassault Falcon Jet recently established a new Pilot Operational Support Team in Teterboro, N.J., to support operators in the Western Hemisphere. Th...
 
 

U.S. Navy awards Raytheon $49.5 million enhanced Laser Maverick production contract

The U.S. Navy has awarded Raytheon a $49.5 million contract for production of new laser-guided Maverick missiles (AGM-65E2/L). The Navy also intends to exercise a contract option to purchase additional units bringing the total contract value to $54.9 million. The Maverick weapon system, a U.S. Air Force-led joint service program, is a forward firing, precision-guided,...
 
 
Northrop Grumman photograph by Alan Radecki

Second Northrop Grumman-built Triton UAS completes first flight

Northrop Grumman photograph by Alan Radecki The second MQ-4C Triton, built by Northrop Grumman for the U.S. Navy, successfully completed its first flight Oct. 15 PALMDALE, Calif. – The U.S. Navy’s second MQ-4C Triton un...
 

 
Raytheon photograph

Poland’s PIT-RADWAR signs letter of intent with Raytheon

Raytheon photograph Mike Shaughnessy, Vice President of Supply Chain, Raytheon Integrated Defense Systems and Jerzy Milosz, Member of Board and Director of R&D, PIT-RADWAR sign a letter of intent to explore further partners...
 
 

Raytheon to resume work on new electronic warfare planning management software program

The U.S. Army has directed Raytheon to resume work on an Electronic Warfare planning management software program that for the first time will give it automated tools to help plan and execute complex electronic warfare missions. The program restart follows a ruling by the U.S. Court of Federal Claims, which denied the protest filed by...
 
 

Northrop Grumman JCREW achieves milestone C; Program to enter production, deployment phase

Northrop Grumman has received Milestone C approval for its Joint Counter Radio-Controlled Improvised Explosive Device Electronic Warfare Increment 1 Build 1 (I1B1) system from the U.S. Naval Sea Systems Command. The JCREW I1B1 system is a jammer that defeats devices used to trigger improvised explosive devices (IEDs). Northrop Grumman developed mounted, dismounted and fixed-site variants...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>