Business

July 26, 2013

100th jet in final production; first F-35 bound for Luke

Lockheed Martin photograph by John Wilson

 
The 100th Lockheed Martin F-35 Lightning II, the first aircraft destined for Luke Air Force Base in Glendale, Ariz., has entered the last stage of final assembly.

This conventional takeoff and landing aircraft, known as AF-41, is scheduled to arrive at the base next year.

During final assembly, the aircraft structure is completed, and electrical and hydraulic systems are added. Additionally, these systems are tested in preparation for fuel systems checks and engine runs. The final steps prior to acceptance by the Air Force include a series of checkout flights leading to the aircraft entering the service’s F-35 fleet. AF-41 is one of 126 F-35s in various stages of production worldwide.

In June, the Air Force announced its decision to increase the number of squadrons at Luke AFB to six with 144 aircraft, which will make it the largest F-35 base worldwide.  In addition to training U.S. pilots, Luke will also serve as an F-35A International Training site. Currently, Luke’s economic impact on the state of Arizona is $2.17 billion. With 14 F-35 suppliers in the state of Arizona, the program has an additional economic impact of $98 million.

 




All of this week's top headlines to your email every Friday.


 
 

 

Lockheed Martin Australia to deliver modern, affordable C-130J training solutions to RAAF

The Royal Australian Air Force has awarded Lockheed Martin Australia a contract to supply a modern C-130J-30 Virtual Maintenance Trainer and a Multi-Function Training Aid to support maintenance and aircrew training at RAAF Base Richmond. Through this major upgrade, the RAAF will have a standardized curriculum tailored for its operations and based on decades of...
 
 

Raytheon awarded U.S. Air Force aircraft integration, life cycle technical support contract

Raytheon has been awarded a $35 million sole-source contract by the U.S. Air Force to provide aircraft integration and life-cycle technical support on an advanced bomb carriage and release system for aircraft. The advanced system will allow both the Air Force and U.S. Navy to perform more missions utilizing less aircraft. “JMM BRU end users...
 
 

General Dynamics UK completes review for SCOUT reconnaissance variant

OAKDALE, South Wales – General Dynamics UK has successfully completed the Critical Design Review for the SCOUT Reconnaissance variant, as part of the SCOUT Specialist Vehicle program. The completion of the SCOUT Reconnaissance variant CDR is a significant marker in the SCOUT SV program, with the first SCOUT Reconnaissance pre-production prototype to be completed later...
 

 

Boeing, Royal Australian Air Force test extended range weapon

The Boeing Joint Direct Attack Munition Extended Range demonstrated significant range increase while maintaining its expected accuracy during flight testing conducted by Boeing and the Royal Australian Air Force. The testing centered on a new wing kit that, when used in conjunction with the weaponís guidance kit, increases the bomb’s range from approximately 15 miles...
 
 

DRS Technologies to provide comm systems for Royal New Zealand Navy frigates

DRS Technologies Inc., a Finmeccanica Company, announced Feb. 25 that its Canadian subsidiary will be providing tactical integrated communications systems to the New Zealand Ministry of Defense for the Royal New Zealand Navy’s ANZAC-class frigates. This subcontract was awarded to DRS Technologies Canada Ltd. in support of a communications modernization contract from Lockheed Martin Canada...
 
 

Northrop Grumman LITENING achieves two million operating hour milestone

In the life cycle of every military system, some milestones stand out as signature achievements. One million operating hours is one of them – and Northrop Grumman’s fielded AN/AAQ-28(V) LITENING pods have hit that number for the second time. “This is a significant milestone for the LITENING program and our team is proud to be...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>