Business

July 29, 2013

Lockheed Martin completes long-range surveillance radar demonstration

Lockheed Martin successfully operated its full-scale prototype long-range air surveillance radar during a recent capability demonstration to the U.S. Air Force.

The Three-Dimensional Expeditionary Long-Range Radar will serve as the principal Air Force long-range, ground-based sensor for detecting, identifying, and reporting aerial targets. This next-generation system will replace the Air Force’s AN/TPS-75 air search radar.

During the event, the 3DELRR full-scale prototype showed its maturity, flexibility, scalability, and the benefits of its open technology design. More than 70 U.S. Air Force, U.S. Marine Corps and Office of Secretary of Defense personnel attended the demonstration either locally or via webcast. The radar detected required targets of opportunity launched from the Syracuse airport and surrounding areas. The company hired additional test aircraft for the event, putting the prototype through more advanced†performance detection and tracking scenarios expected of long-range radars.

Originally unveiled in December 2010, Lockheed Martin’s 3DELRR solution met all the requirements for this demonstration two and half years earlier, and used this opportunity to highlight the radar’s evolving design to the customer. The radar’s design addresses 100 percent of 3DELRR requirements, including critical extended air surveillance reach for early warning from aerial threats.

“We began working a 3DELRR solution more than 10 years ago and are the only prime contractor that has been involved with each phase of the program up to this point,” said Mark Mekker, director of ground-based air surveillance programs at Lockheed Martin. “Since day one, we†have partnered with our customer to provide the most affordable 3DELRR solution that addresses their mission – because we understand their mission. We are implementing a cost-effective, long-term solution that addresses the challenges they face today and those they will face tomorrow, as well as being able to consolidate the missions of several other long-range radars currently in service.”

The Air Force is expected to release its request for proposals for the next phase of the program in the August or September 2013 timeframe. With that competition, the customer will select one contractor for the engineering and manufacturing development phase, which will be awarded in 2014.

In June 2009, Lockheed Martin was awarded a $25 million contract from the Air Force to begin developing a prototype for the 3DELRR radar. The team successfully completed a capabilities demonstration in January and December 2010. In August 2012, Lockheed Martin was awarded a contract for the 15-month pre-engineering manufacturing development (pre-EMD) phase of the contract.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>