Business

August 5, 2013

General Dynamics Bath Iron Works awarded $212 million for DDG 1002 deckhouse, hangar, launch-system modules

The U.S. Navy has awarded General Dynamics Bath Iron Works $212 million for the design and construction of a steel deckhouse and hangar and construction of aft Peripheral Vertical Launching System modules for integration into Lyndon B Johnson (DDG 1002), the third ship of the U.S. Navy’s Zumwalt-class of guided missile destroyers.

General Dynamics Bath Iron Works is a business unit of General Dynamics.

“The design and production of these critical components of DDG 1002 will help maintain our specialized engineering and design skills and provides additional stability to our manufacturing workload,” said Jeff Geiger, president of Bath Iron Works.† “We are pleased to have been selected for this important work.”

The Zumwalt-class deckhouse includes the ship’s bridge, radars, antennas and intake/exhaust systems in a structure with a significantly smaller radar cross-section than other ships in the modern Navy fleet.† The enclosed hangar is designed to accommodate two medium-lift helicopters or other mission-related equipment.† The PVLS modules distribute the ship’s missile launchers in separate four-cell launcher compartments along the ship’s hull.

There are currently three DDG 1000 class destroyers in production at Bath Iron Works, Zumwalt (DDG 1000), Michael Monsoor (DDG 1001) and Lyndon B. Johnson (DDG 1002).† Zumwalt is scheduled to be delivered to the Navy in 2015.† The keel laying ceremony for DDG 1001 took place in May 2013 and Start of Fabrication for DDG 1002 was in April 2012.†




All of this week's top headlines to your email every Friday.


 
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 

General Dynamics to continue work on U.S. Air Force GPS III program

General Dynamics Advanced Information Systems, a business unit of General Dynamics, has been awarded a $25.4 million full-production contract from Lockheed Martin to support the U.S. Air Force Global Positioning System (GPS) III Network Communications Element for space vehicles seven and eight. The Air Force’s next-generation GPS III satellites will improve position, navigation and timing...
 

 

Javelin joint venture demonstrates vehicle-mounted missile launch

The Raytheon and Lockheed Martin Javelin Joint Venture recently fired a Javelin missile from a remote weapon station integrated onto a wheeled vehicle at Redstone Arsenal in Huntsville, Ala. The test demonstrated Javelin’s vehicle-launch capability to an international customer that has expressed interest in purchasing vehicles integrated with Javelin. The Javelin missile launched successfully...
 
 

Royal Australian Air Force scores direct hit with JSOW C

The Royal Australian Air Force has successfully tested a Raytheon Joint Standoff Weapon C against a hardened wall target at the RAAF Woomera Test Range. Launched from an F/A-18F Super Hornet at an operationally representative stand-off range and altitude of 25,000 feet, the JSOW C scored a direct hit. The RAAF test marked the third...
 
 

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C. Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>