Business

August 5, 2013

General Dynamics Bath Iron Works awarded $212 million for DDG 1002 deckhouse, hangar, launch-system modules

The U.S. Navy has awarded General Dynamics Bath Iron Works $212 million for the design and construction of a steel deckhouse and hangar and construction of aft Peripheral Vertical Launching System modules for integration into Lyndon B Johnson (DDG 1002), the third ship of the U.S. Navy’s Zumwalt-class of guided missile destroyers.

General Dynamics Bath Iron Works is a business unit of General Dynamics.

“The design and production of these critical components of DDG 1002 will help maintain our specialized engineering and design skills and provides additional stability to our manufacturing workload,” said Jeff Geiger, president of Bath Iron Works.† “We are pleased to have been selected for this important work.”

The Zumwalt-class deckhouse includes the ship’s bridge, radars, antennas and intake/exhaust systems in a structure with a significantly smaller radar cross-section than other ships in the modern Navy fleet.† The enclosed hangar is designed to accommodate two medium-lift helicopters or other mission-related equipment.† The PVLS modules distribute the ship’s missile launchers in separate four-cell launcher compartments along the ship’s hull.

There are currently three DDG 1000 class destroyers in production at Bath Iron Works, Zumwalt (DDG 1000), Michael Monsoor (DDG 1001) and Lyndon B. Johnson (DDG 1002).† Zumwalt is scheduled to be delivered to the Navy in 2015.† The keel laying ceremony for DDG 1001 took place in May 2013 and Start of Fabrication for DDG 1002 was in April 2012.†




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 29, 2014

News: U.S. military limits warplanes used for Islamic State bombings - The U.S. is relying mostly on warplanes already positioned in the region for its air war against the Islamic State, as opposed to dispatching a major buildup of aerial forces that happened in previous campaigns.   Business: At DOD, it’s use-it-or-lose-it season - As fiscal 2014...
 
 

News Briefs September 29, 2014

Navy awards ship design grant to UNO The University of New Orleans has received a $210,000 grant from the Navy s Office of Naval Research to test information gathering and analysis techniques intended to improve warship design. The goal for warship designers is to produce a vessel that can be repurposed numerous times throughout its...
 
 
Courtesy photograph

TACP-M ties it all together

Air National Guard photograph by SSgt. Lealan Buehrer Tactical air control party specialists with the 169th Air Support Operations Squadron survey an enemy-controlled landing zone before calling in close-air support Aug. 14, 20...
 

 
Air Force photograph by A1C Thomas Spangler

Nellis aggressor squadron inactivated

Air Force photograph by A1C Thomas Spangler SSgt. Justin White signals to Maj. Sam Joplin to begin taxiing a 65th Aggressor Squadron F-15 Eagle to the runway Sept. 18, 2014, at Nellis Air Force Base Nev. The roles and responsib...
 
 
Army photograph by SSgt. Mary S. Katzenberger

82nd Airborne helps commemorate 70th Anniversary of Operation Market Garden

Army photograph by SSgt. Mary S. Katzenberger A paratrooper assigned to the 82nd Airborne Division, reflects near the grave of a British paratrooper at the Arnhem Oosterbeek War Cemetery, Sept. 14, 2014, in the Netherlands. The...
 
 

Raytheon awarded $251 million Tomahawk missile contract

The U.S. Navy has awarded Raytheon a $251 million contract to procure Tomahawk Block IV tactical cruise missiles for fiscal year 2014 with an option for 2015. The contract calls for Raytheon to build and deliver Tomahawk Block IV cruise missiles to the U.S. Navy and U.K. Royal Navy. Raytheon will also conduct flight tests...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>