In the news...

August 9, 2013

Groups sue to block demolition at ex-nuclear site

SIMI VALLEY, Calif. – Several environmental groups Aug. 6 sued state regulators over the cleanup of a former nuclear research lab, saying low-level radioactive waste was improperly shipped to landfills.
Consumer Watchdog, along with other groups, filed a lawsuit Aug. 6 in Sacramento County Superior Court against the Department of Public Health and Department of Toxic Substances Control, which oversees the cleanup at the Santa Susana Field Laboratory.

Located about 30 miles northwest of Los Angeles, Santa Susana was once home to nuclear research and rocket engine tests. In 1959, one of the reactors suffered a partial nuclear meltdown. Responsible parties including Boeing, NASA and the U.S Energy Department have been working with state officials to meet a 2017 deadline to rid the nearly 2,900-acre site of contaminated soil.

In their complaint, the groups contend that materials from several buildings that were demolished were sent to landfills and metal recycling shops that are not licensed to accept radioactive waste. They also sought a temporary restraining order to stop Boeing from tearing down a plutonium fuel fabrication building on the hilltop complex.

ìIt is paramount that the public be protected from toxic, and in this instance radioactive, harm,î Liza Tucker of Consumer Watchdog said in a statement.

Officials at the toxic control agency rejected the allegations, saying that debris sent offsite posed no threat to human health or the environment.

Stewart Black, a deputy director at DTSC, said the state followed the rules in the demolishing and disposal of old buildings.

During the Cold War, workers at the site tested thousands of rockets and experimented with nuclear reactors, which were operational until 1980. And by the time the rest of the lab closed in 2006, a toxic legacy of radioactive and chemical contamination had been left.

Former workers and residents in nearby neighborhoods have blamed the lab for a variety of health problems. AP




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>