Business

August 12, 2013

Northrop Grumman awarded $617 million for full-rate production E-2D Advanced Hawkeyes

Since the first E-2D Advanced Hawkeye took to the skies over St. Augustine, Fla., for the first time in August 2007, Northrop Grumman has delivered 10 new production E-2Ds to the U.S. Navy, on cost and on schedule. An additional 10 aircraft are in various stages of manufacturing and predelivery flight testing at the company’s St. Augustine Aircraft Integration Center. Initial operational capability with the Navy remains on track for 2015.

The U.S. Navy has awarded Northrop Grumman a $617 million contract for five full-rate production Lot 1 E-2D Advanced Hawkeye aircraft.

“Moving from low-rate production into full-rate production is a significant milestone for the E-2D Advanced Hawkeye program,” said Bart LaGrone, vice president, E-2/C-2 programs, Northrop Grumman Aerospace Systems. “We look forward to manufacturing and delivering a mature and effective airborne early warning, battle management, command and control system.”

“Attaining E-2D full-rate production is the culmination of years of hard work,” said Capt. John S. Lemmon, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231). “The E-2D team continues to work together with one vision and goal ñ deliver a solid product to the fleet.”

On Aug. 3, 2007, the first E-2D Advanced Hawkeye took to the skies over St. Augustine, Fla. Since then, Northrop Grumman has delivered 10 new production E-2Ds to the U.S. Navy, on cost and on schedule. An additional 10 aircraft are in various stages of manufacturing and predelivery flight testing at the company’s St. Augustine Aircraft Integration Center. Initial operational capability with the Navy remains on track for 2015.

The E-2D program continues to find ways to reduce costs and provide best value to the customer through improving aircraft delivery processes, standardizing repair methods and looking for opportunities to improve spares timing to increase the overall program affordability.

“We’ve got the right people and processes in place to make a seamless transition into full-rate production,” LaGrone said. “With the Navy’s E-2D program of record at 75 aircraft, full-rate production enables the production of the remaining 55 aircraft over the next 10 years and provides the opportunity for a cost-effective, multiyear procurement.”




All of this week's top headlines to your email every Friday.


 
 

 

Northrop, Navy celebrate legacy of EA-6B Prowler

Northrop Grumman photograph by Edgar Mills The U.S. Navy’s last operational EA-6B Prowler, designed and built by Northrop Grumman, lifts off from Naval Air Station Whidbey Island, Wash. in a ceremonial fly-away June 27 from its long time operational base. The Navy is retiring the Prowler after nearly 45 years of service.   The U.S....
 
 

Lockheed signs agreements for two full-flight simulators

Lockheed Martin Commercial Flight Training and Airbus have signed a frame contract enabling Airbus to expedite procurement of flight simulation devices for their customers, Airbus training centers and their affiliates worldwide. The frame contract emphasizes the shared intent to partner on future training programs, and combines Airbus’ and Lockheed Martin Commercial Flight Training’s expert...
 
 

Drone Aviation receives order for U.S. Army aerostat system enhancement

Drone Aviation Holding Corp., a developer of specialized lighter-than-air aerostats and tethered drones, announced June 24 that its wholly owned subsidiary, Drone Aviation Corp., has been awarded an order from U.S. Government prime contractor BAE Systems for parts and services related to enhancing and supporting two WASP aerostat systems owned and operated by the U.S....
 

 

Boeing names Muilenburg as chief executive officer

The Boeing board of directors has elected Dennis A. Muilenburg the company’s 10th chief executive, succeeding W. James (Jim) McNerney, Jr., who held the position for the past 10 years. Muilenburg, who has served as Boeing president and chief operating officer since 2013, becomes president and CEO July 1. McNerney, who joined Boeing’s board of...
 
 
boeing-thailand

Boeing, Thai Airways International celebrate 25th direct 777 delivery

  Boeing and Thai Airways International Public Company Limited celebrated the Thailand flag carrier’s 25th direct 777 delivery, a 777-300ER (Extended Range), from the Boeing delivery center in Everett, Wash.  “...
 
 

General Dynamics receives $219 million for U.S. Army’s WIN-T increment 2 systems

General Dynamics received the first full rate production order from the U.S. Army to build additional Warfighter Information Network – Tactical (WIN-T) Increment 2 systems.  The $219 million order includes the production of more than 300 vehicle-based network communication nodes along with related equipment and materials. WIN-T Increment 2 is the Army’s communications backbone providin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>