Space

August 16, 2013

NASA, commercial crew partners fund additional development milestones

NASA announced Aug. 15 it is adding some additional milestones to agreements with three U.S. commercial companies that are developing spaceflight capabilities that could eventually provide launch services to transport NASA astronauts to the International Space Station from U.S. soil.

NASA is supporting the development of these capabilities through its Commercial Crew Integrated Capability (CCiCap) initiative. As part of this initiative, NASA is exercising and funding specific additional milestones for these next generation space transportation systems. The agency has extended the Space Act Agreements (SAAs) for The Boeing Company of Houston, Space Exploration Technologies (SpaceX) of Hawthorne, Calif., and Sierra Nevada Corporation (SNC) of Louisville, Colo., to include one or two additional milestones each under CCiCap.

“Our commercial partners are on-track developing innovative, new space systems that can safely, reliably and affordably transport astronauts and end the gap in U.S. human spaceflight capabilities,” said William Gerstenmaier, associate administrator for Human Exploration and Operations at NASA Headquarters in Washington. “These additional milestones are specifically targeted by NASA and our partners to reduce risk and improve development efforts.”

In their respective CCiCap SAAs, which were awarded in August 2012, NASA’s partners listed optional milestones that could be exercised to continue the development and maturation of their space systems. After negotiation with the partners, NASA decided to fund revised portions of existing CCiCap optional milestones and extend the period of performance for the CCiCap SAAs from May 2014 to August 2014. The industry partners also will be contributing financially to the execution of these milestones.

The revisions, in the form of amendments to the SAAs, are posted online at http://commercialcrew.nasa.gov/page.cfm?ID=38.

The milestones are:

  • Boeing Spacecraft Safety Review. NASA’s investment is $20 million and the milestone is planned to be accomplished in July 2014.
  • SpaceX Dragon Parachute Tests. NASA’s investment is $20 million and the milestone is planned to be accomplished over several months culminating in November 2013.
  • SNC Incremental Critical Design Review #1. NASA’s investment is $5 million and the milestone is planned to be accomplished in October 2013.
  • SNC Incremental Reaction Control System Testing #1. NASA’s investment is $10 million and the milestone is planned to be accomplished in July 2014.

These milestones each reduce risks, advance the partners’ development efforts or accelerate schedules consistent with the goals of CCiCap. NASA plans to use fiscal year 2014 funding for the total government investment of $55 million. Funding these optional milestones does not alter or affect NASA’s acquisition strategy for the agency’s Commercial Crew Program.

While NASA works with U.S. industry partners to develop and advance new commercial space capabilities, the agency also is developing the Orion spacecraft and the Space Launch System (SLS), a crew capsule and heavy-lift rocket to provide an entirely new capability for human exploration. Designed to be flexible for launching spacecraft for crew and cargo missions, SLS and Orion will expand human presence beyond low-Earth orbit and enable new missions of exploration in the solar system, including to an asteroid and Mars.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines January 23, 2015

News: Yemen chaos threatens U.S. counterterror efforts, including drone programĀ - The White House’s strategy for fighting al-Qaeda in Yemen – repeatedly presented as a model by President Obama – was left in tatters Thursday by the resignation of the man who personally approved U.S. drone strikes in the country and the collapse of its central...
 
 

News Briefs January 23, 2015

NATO detects key Russian military equipment in east Ukraine NATO’s top commander in Europe says the alliance has detected the presence of key Russian military equipment in eastern Ukraine that, in the past, has accompanied large inflows of Russian troops. Gen. Philip Breedlove told a news conference Jan. 22 in Brussels that Russian electronic warfare...
 
 
Boeing photograph

Boeing Maritime Surveillance Aircraft ready for demonstration flights

Boeing photograph The Boeing Maritime Surveillance Aircraft program is ready for customer demonstration flights, having completed the baseline ground and flight testing of the aircraft mission systems. The Boeing Maritime Surve...
 

 
Air Force photograph by Jacqueline Cowan

F135 test demonstrates success of AEDC workshare initiative

Air Force photograph by Jacqueline Cowan Aerospace Testing Alliance Test Engineer Darren Carroll, pictured in front, assists as Pratt & Whitney Test Engineer Ronnie Thomas does a borescope inspection of the fan on the F135 ...
 
 
U.S. Air Force photo by Master Sgt. Kevin J. Gruenwald

40 years of Red Flag at Nellis

U.S. Air Force photo by Master Sgt. Kevin J. Gruenwald A flight of F-15 Eagles and F-16 Fighting Falcons Aggressors fly in formation over the Nevada Test and Training Ranges June 5, 2008. The proposal for Red Flag came in early...
 
 
Lockheed Martin photograph

Navy gears up to order production of 29 aircraft diagnostic systems

Lockheed Martin photograph Petty Officers Third Class Ira Schwartz assigned to Fleet Readiness Center Southeast at Naval Air Station Jacksonville, Fla., left, and Devin Riley from Fleet Readiness Center Mid-Atlantic at Naval Ai...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>