Defense

August 21, 2013

NAWCAD team helps British crew complete new helo tests

The upgraded CH-47 Chinook, outfitted with bright red skis, hovers over the airfield at Naval Air Station Patuxent River as it completes checks of a new digital automatic flight control system. The system gives the aircraft better low speed capabilities, allowing for safer maneuvering and increased control.

Royal Air Force flight crews completed testing of their new MK6 tandem rotor helicopter with the help of the Naval Air Warfare Center Aircraft Division at Naval Air Station Patuxent River, Md., Aug. 10.
NAWCAD employees provided assistance to the RAF under a commercial service agreement with Boeing. NAS Patuxent River offers many unique testing areas such as sloped landing pads, maneuvering courses and heavy lift stations. Flying in these testing areas ensured the helicopterís new digital automatic flight control system could operate successfully in a wide range of environments and scenarios, from operations in a desert theater to supply drops in the Arctic.

This is going to give us increased control in degraded visual environments, when operating in very difficult conditions such as in the dark or with dust and snow that prevent the pilot from seeing,î said RAF Flight Leader Chris Boddy. ìThis gives control to the aircraft so the pilot can monitor the profiles of the aircraft flying and not be overworked.

In addition to the digital AFCS, the upgraded version of Boeingís CH-47 Chinook contains distinctive items such as the COBRA fire suppression system, the external rescue hoist and a rotor brake. The new frame structure of the MK6 allows for lower maintenance and vibration signatures for longer life.

Several RAF teams visited NAS Patuxent River over the test period, allowing different crews to conduct tests and gain experience flying the aircraft.

We really appreciate all the facilities we have been able to use on base and places in the local community as well, Boddy said. ìItís been a good place to work and live.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 22, 2014

News: GAO: Pentagon violated law with Bergdahl swap - Congressional investigators say the Pentagon violated the law when it swapped five Taliban leaders for Army Sgt. Bowe Bergdahl, who was held prisoner in Afghanistan for five years.   Business: U.S. Air Force issues RFI for new rocket engine - The US Air Force is officially looking into...
 
 

News Briefs August 22, 2014

U.S. military deaths in Afghanistan at 2,200 As of Aug. 20, 2014, at least 2,200 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,821 military service members have died in Afghanistan as a result...
 
 
navair-triton

MQ-4C Tritons to arrive at Pax River this fall

  MQ-4C Triton test air vehicles at Northrop Grumman’s facility in Palmdale, Calif., will fly cross-country to Naval Air Station Patuxent River, Md., this fall. The MQ-4C completed a test flight Aug. 19 with updated ...
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
global-hawk2

Air Combat Command loans Global Hawk to GVCTF

Air Force photograph by Jennifer Romo The 412th Test Wing’s Global Vigilance Combined Test Force received a Global Hawk Block 40 Aug. 6, on loan from Air Combat Command. Tail number 2035, from Grand Forks AFB, N.D., is jo...
 
 

NASA awards program analysis, Control Bridge III Contract

NASA has awarded the Program Analysis and Control III Bridge contract for support services to ASRC Research & Technology Solutions of Beltsville, Md. The cost-plus-fixed-fee, indefinite delivery/indefinite quantity basic contract has a minimum ordering value of $1 million and a maximum ordering value of $37 million, with a performance period beginning Aug. 30 through Feb....
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>