Business

August 26, 2013

Boeing rolls out first 787-9 Dreamliner

boeing-dreamliner
 

Boeing has completed the first 787-9 Dreamliner. The second member of the super-efficient 787 family rolled out of the Everett, Wash., factory Aug. 24 to the flight line, where teams are preparing it to fly later this summer.

At 20 feet longer than the 787-8, the 787-9 will extend the 787 family in both capacity and range, carrying 40 more passengers an additional 300 nautical miles. The 787-9 leverages the visionary design of the 787-8 such as its exceptional environmental performance — 20 percent less fuel use and 20 percent fewer emissions than similarly sized airplanes — and passenger-pleasing features.

With the second and third airplanes in final assembly, Boeing and the 787-9 are on track. First delivery to launch customer Air New Zealand is set for mid-2014.

 




All of this week's top headlines to your email every Friday.


 
 

 

Raytheon wins $46 million contract for South Korean Global Hawk ground stations

Raytheon has been awarded a contract valued at up to $45.7 million by Northrop Grumman Aerospace Systems for ground segments in support of four Global Hawk unmanned aircraft systems recently purchased by the Republic of Korea. Under this contract, Raytheon will deliver one building-based and one mobile ground segment to locations in South Korea. Work...
 
 

TOW 2A RF missiles successfully fired from helicopter

In the first of its kind launch, Raytheon fired tube-launched, optically-tracked, wireless-guided 2A radio frequency practice missiles from an AH-1W Cobra attack helicopter during a December exercise.  Raytheon, working with the Naval Air Systems Command, fired two TOW 2A RF practice missiles at ranges exceeding 2600 meters. The two tests verified the missile’s capability to...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 

 

Boeing, ANA finalize order for three 787-10 Dreamliners

Boeing and All Nippon Airways (ANA) today finalized an order for three 787-10 Dreamliners, valued at approximately $900 million at list prices. With this order, originally announced as a commitment in January 2015, ANA becomes Boeing’s newest 787-10 customer and first airline in Asia to operate the entire family of 787 Dreamliners. “We truly appreciate...
 
 

Poland’s MESKO, Raytheon sign second letter of intent

In a move designed to collaborate and share advanced defense technologies, Raytheon’s Missile Systems business signed a Letter of Intent with MESKO, Poland’s leading missile and ammunition manufacturer. Areas of cooperation focus on Raytheon’s solutions for the KRAB howitzer precision fires and new Polish Attack Helicopter, including offset proposals and opportunities for MESK...
 
 

Airbus Group delivers first new UH-72A Lakota for Army initial-entry trainer mission

Airbus Group March 25 delivered to the U.S. Army the first UH-72A Lakota helicopter to come off the Airbus Helicopters Inc. production line configured for the Lakota’s latest mission, as the service’s initial-entry training helicopter. The aircraft will join seven Lakotas previously in the Army inventory that have already been modified to the training configuration...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>