Defense

August 26, 2013

Eglin’s 40th FTS expands A-10 fuel limitations in combat

Tags:
Samuel King Jr.
Eglin AFB, Fla.

An A-10C Thunderbolt II from the 40th Flight Test Squadron, moves down the runway at Eglin Air Force Base, Fla. The aircraft is loaded up with weaponry to test the combat carriage limits of the Sargent Fletcher external fuel tank. The A-10 flight personnel are testing to ensure the A-10 can carry the tank into a combat environment safely. If proven to be safe to carry, the tank will add up to 60 minutes of flighttime to its combat sortie.

The dreaded fuel light, either blinking or glowing red indicating low on gas, becomes a constant reminder that a stoppage of the drive, trip or mission is imminent. The A-10 section of the 40th Flight Test Squadron is testing the expansion of the Thunderbolt II’s fuel capability to prolong its flight time, remain in the fight and keep that fuel light off a while longer.

In 2012, Air Combat Command requested testing, via the Air Force Seek Eagle Office here, to possibly expand the A-10 carriage limits of its 600-gallon fuel tank with all existing fuel tank configurations such as various weapon loads.

“Currently, the A-10 doesn’t carry an external fuel store into combat,” said Maj. Olivia Elliott, the test pilot for the expansion. “The present flight limitations on the Sargent Fletcher tank restrict it from being flown in a combat environment.”

Flight testing was accomplished on the SF tank in 1997, but it was never evaluated for combat requirements. The goal for the 40th FTS team was to determine if the aircraft could safely reach those combat flight limits carrying the tank, thus carrying more fuel into battle.

An A-10C Thunderbolt II from the 40th Flight Test Squadron, returns to Eglin Air Force Base, Fla., after a test mission. The aircraft is loaded up with weaponry to test the combat carriage limits of the Sargent Fletcher external fuel tank. The A-10 flight personnel are testing to ensure the A-10 can carry the tank into a combat environment safely. If proven to be safe to carry, the tank will add up to 60 minutes of flighttime to its combat sortie.

“By expanding the fuel carriage limits, A-10C units can carry the 600-gallon tank into combat expanding loiter time by 45-60 minutes and pushing back tanker support,” said Elliott. “This will allow the aircraft to remain in flight during a combat situation longer, provide lengthier periods of armed over-watch for ground missions, as well as limit the amount of time spent air-to-air refueling during a combat sortie.”

In more than 30 missions, the tank was pushed to greater airspeeds, Mach levels and higher symmetrical (pulling Gs without rolling) and asymmetrical (rolling and pulling Gs) limits to simulate a possible combat setting.

At first, missions focused on gathering data to set the baseline for the aircraft’s handling characteristics. Then other missions focused on different aircraft load configurations to ensure sound flight capability.

“The scenarios were engineered to check a variety of weapons on the A-10 and clear the tank to the expanded limits with most combat weapons loaded on the aircraft,” said Capt. Rojas, of the 40th FTS.
There have been no anomalies seen to date in the testing, according to Elliott.

“The flying qualities of the aircraft show slightly reduced stability in the yaw axis; but during handling quality evaluations, there has been no decrease in aircraft tracking performance,” she said.

With only a few missions left to fly, the test team will begin the report write-up. The 40th passes on their findings to Seek Eagle. AFSEO will determine if a flight clearance can be issued. If it is, the Air Force Special Projects Office will update the A-10s flight clearance to include the expanded tank limits and the tank will be able to be used in combat.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late¬†- Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ‚...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>