Business

August 31, 2013

Littoral Combat Ship Coronado completes acceptance trials

Independence-variant Littoral Combat Ship Coronado (LCS 4) successfully completed Acceptance Trials Aug. 23, in the Gulf of Mexico.

This milestone achievement involved the execution of intense comprehensive tests by the Navy while underway, which demonstrated the successful operation of the ship’s major systems and equipment. This is the last significant milestone before delivery of the ship, which is expected in September.

Upon returning from trials, Craig Perciavalle, President of Austal USA, remarked: “The successful completion of acceptance trials for this vessel validates the quality and reliability of Austal’s shipbuilding know-how. I am pleased with the performance of this ship which is a direct result of the hard work and incredible craftsmanship of the entire Austal USA team of shipbuilding professionals.”

The Littoral Combat Ship (LCS) is a fast, agile, focused-mission platform designed for operation in near-shore environments yet capable of open-ocean operation. This vessel is the second of twelve, 127-meter Independence-variant LCS class ships Austal has been contracted to build for the U.S. Navy (including USS Independence (LCS 2), delivered to the Navy in 2009). The final 10 of the 12 were awarded to Austal as prime contractor subsequent to a $3.5 billion block buy in 2010.

Austal’s teaming partner, General Dynamics Advanced Information Systems (a business unit of General Dynamics) is the ship systems integrator, responsible for the design, integration and testing of the navigation systems, C4I, and aviation systems. The ships’ highly flexible open architecture computing infrastructure (OPEN CI), designed, developed, and integrated by General Dynamics Advanced Information Systems, allows “plug and play” integration of both the core systems and the LCS mission modules.  It is designed to the Navy’s open architecture requirements, strictly adheres to published industry standards and facilitates the integration of commercially available products.

“Our open architecture computing infrastructure seamlessly integrates the ship’s combat management and seaframe control system with other critical systems giving the crew the flexibility to access any system anywhere on the ship,” said Mike Tweed-Kent, vice president and general manager of the Mission Integration Systems division at General Dynamics Advanced Information Systems. “This design allows the Navy to quickly and easily add new or upgrade existing capabilities to enhance the fleet’s overall operational effectiveness.”

The LCS program is in full swing at Austal USA with five ships under construction at this time. Coronado (LCS 4) will soon be followed by Jackson (LCS 6) which will launch at the end of the year and Montgomery (LCS 8), which is being assembled after celebrating its keel laying ceremony on June 25. Construction is well underway on Gabrielle Giffords (LCS 10) along with Omaha (LCS 12) which just started construction last month.

Perciavalle added, “The LCS program is maturing well as we leverage lessons-learned and improve productivity, while providing an incredible platform to fulfill the Navy’s needs.”

Austal has also been contracted by the U.S. Navy to build ten, 103-meter JHSVs under a 10-ship, $1.6 billion contract. Two of the ten have already been delivered. Austal continues to make steady forward progress on the JHSV program as USNS Millinocket (JHSV 3) prepares for Builder’s Sea Trials in the fall and will be delivered to the Navy later this year. Construction on Fall River (JHSV 4) and Trenton (JHSV 5) is also well underway in Austal’s Mobile, Ala. shipyard.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 2, 2015

News: Israel lobbies for more missile defense funds than Obama sought - For the second consecutive year, Israeli officials have asked the U.S. Congress to add more than $300 million to President Barack Obama’s budget request for their nation’s missile-defense programs.   Business: Inside one of the most intense, and unusual, Pentagon contracting wars - The much-anticipated...
 
 

News Briefs March 2, 2015

Italy resumes Navy exercise amid new tensions over Libya The Italian Navy is resuming exercises in the Mediterranean Sea, including near the coast of Libya, amid concerns about rapidly deteriorating security in the North African nation. The exercise began March 2 and includes anti-submarine, anti-aircraft and anti-ship training operations. The exercise was suspended for a...
 
 
LM-AEHF

Ingenuity drives Lockheed’s AEHF program to production milestone early

Lockheed Martin has successfully integrated the propulsion core and payload module for the fourth Advanced Extremely High Frequency (AEHF) satellite nearly five months ahead of schedule. Reaching this critical milestone early a...
 

 

First all-electric propulsion satellites send first on-orbit signals

Two Boeing 702SP (small platform) satellites, the first all-electric propulsion satellites to launch, have sent initial signals from space, marking the first step toward ABS, based in Bermuda, and Eutelsat, based in Paris, being able to provide enhanced communication services to their customers. Whatís more, the satellites were launched as a conjoined stack on a...
 
 

GA-ASI, Sener team to offer Predator B to Spain

General Atomics Aeronautical Systems, Inc. and SENER, a leading Spanish engineering company, announced March 2 that they have signed a teaming agreement that promotes the use of the multi-mission Predator B® RPA to support Spain’s airborne surveillance and reconnaissance requirements.  GAASI is a leading manufacturer of Remotely Piloted Aircraft systems, radars, and electro-optic and relate...
 
 
raytheon-satellite

Raytheon’s ‘Blue Marble’ imaging sensor delivered on schedule

Raytheon has delivered a second Visible Infrared Imaging Radiometer Suite instrument to support the National Oceanic and Atmospheric Administration’s Joint Polar Satellite System mission. The second VIIRS unit will fly ab...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>