Business

August 31, 2013

Littoral Combat Ship Coronado completes acceptance trials

Independence-variant Littoral Combat Ship Coronado (LCS 4) successfully completed Acceptance Trials Aug. 23, in the Gulf of Mexico.

This milestone achievement involved the execution of intense comprehensive tests by the Navy while underway, which demonstrated the successful operation of the ship’s major systems and equipment. This is the last significant milestone before delivery of the ship, which is expected in September.

Upon returning from trials, Craig Perciavalle, President of Austal USA, remarked: “The successful completion of acceptance trials for this vessel validates the quality and reliability of Austal’s shipbuilding know-how. I am pleased with the performance of this ship which is a direct result of the hard work and incredible craftsmanship of the entire Austal USA team of shipbuilding professionals.”

The Littoral Combat Ship (LCS) is a fast, agile, focused-mission platform designed for operation in near-shore environments yet capable of open-ocean operation. This vessel is the second of twelve, 127-meter Independence-variant LCS class ships Austal has been contracted to build for the U.S. Navy (including USS Independence (LCS 2), delivered to the Navy in 2009). The final 10 of the 12 were awarded to Austal as prime contractor subsequent to a $3.5 billion block buy in 2010.

Austal’s teaming partner, General Dynamics Advanced Information Systems (a business unit of General Dynamics) is the ship systems integrator, responsible for the design, integration and testing of the navigation systems, C4I, and aviation systems. The ships’ highly flexible open architecture computing infrastructure (OPEN CI), designed, developed, and integrated by General Dynamics Advanced Information Systems, allows “plug and play” integration of both the core systems and the LCS mission modules.  It is designed to the Navy’s open architecture requirements, strictly adheres to published industry standards and facilitates the integration of commercially available products.

“Our open architecture computing infrastructure seamlessly integrates the ship’s combat management and seaframe control system with other critical systems giving the crew the flexibility to access any system anywhere on the ship,” said Mike Tweed-Kent, vice president and general manager of the Mission Integration Systems division at General Dynamics Advanced Information Systems. “This design allows the Navy to quickly and easily add new or upgrade existing capabilities to enhance the fleet’s overall operational effectiveness.”

The LCS program is in full swing at Austal USA with five ships under construction at this time. Coronado (LCS 4) will soon be followed by Jackson (LCS 6) which will launch at the end of the year and Montgomery (LCS 8), which is being assembled after celebrating its keel laying ceremony on June 25. Construction is well underway on Gabrielle Giffords (LCS 10) along with Omaha (LCS 12) which just started construction last month.

Perciavalle added, “The LCS program is maturing well as we leverage lessons-learned and improve productivity, while providing an incredible platform to fulfill the Navy’s needs.”

Austal has also been contracted by the U.S. Navy to build ten, 103-meter JHSVs under a 10-ship, $1.6 billion contract. Two of the ten have already been delivered. Austal continues to make steady forward progress on the JHSV program as USNS Millinocket (JHSV 3) prepares for Builder’s Sea Trials in the fall and will be delivered to the Navy later this year. Construction on Fall River (JHSV 4) and Trenton (JHSV 5) is also well underway in Austal’s Mobile, Ala. shipyard.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines January 28, 2015

News: Panel will propose new military retirement system - The long-awaited report on military compensation set to drop Thursday will propose fundamental changes to military retirement and health care benefits, according to several people familiar with the report. Source: DOD to request $585 billion for fiscal 2016 - The Department of Defense is preparing to submit a...
 
 

News Briefs January 28, 2015

Defense contractor to pay $2 million to settle claims A Northern California defense contractor will pay the federal government $2 million to settle claims about its manufacturing of parts for remote-controlled aircraft. The U.S. Attorney’s Office in Sacramento says Sacramento-based Composite Engineering Inc. agreed to pay the money to end allegations that it artificially inflated...
 
 
Navy photograph

USS Roosevelt marks 200,000 trap

Navy photograph An F/A-18F Super Hornet flown by Capt. Daniel Grieco, commanding officer of the aircraft carrier USS Theodore Roosevelt (CVN 71), and Capt. Benjamin Hewlett, deputy commander of Carrier Air Wing (CVW) 1, complet...
 

 
Navy photograph by PO1 William Larned

USS California returns from maiden deployment

Navy photograph by PO1 William Larned The Virginia-class attack submarine USS California (SSN 781) returns from its maiden deployment to its homeport at Naval Submarine Base New London. Under the command of Cmdr. Shawn Huey, Ca...
 
 
Army photograph

Army proves new watercraft capabilities

Army photograph Marine Corps assets are loaded onto the USNS Sgt. Matej Kocak (T-AK 3005), from an U.S. Army Landing Craft Utility, or LCU, USAV Port Hudson during port operations, at White Beach Naval Base, Jan. 22, 2015. Sold...
 
 

Orbital stockholders approve merger with ATK’s aerospace, defense groups

Orbital Sciences Corporation announced Jan. 27 that at a special meeting, the company’s stockholders voted overwhelmingly to approve the proposed merger with the Aerospace and Defense Groups of Alliant Techsystems Inc., pursuant to the definitive transaction agreement dated April 28, 2014. Approximately 99 percent of the votes cast at the special meeting voted in favor...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>