Business

September 4, 2013

Boeing tanker remains on schedule with start of second refueling boom Assembly

Boeing workers in Seattle took another step toward delivering next-generation aerial refueling capability to the U.S. Air Force Sept. 3 when they began assembling the second refueling boom for the KC-46A Tanker program.

Based on the Boeing 767 commercial airplane, the KC-46A will feature a modernized fly-by-wire boom and hose and drogue systems, making it capable of refueling any U.S. or allied fixed wing aircraft any time on any mission. Whatís more, the KC-46 itself can be refueled in flight, adding to its substantially greater capability and mission flexibility.

“Our team is achieving significant milestones as we prepare for flight tests to begin, and we remain focused on delivering this capability on schedule,î said Maureen Dougherty, KC-46 vice president and program manager. The KC-46 boom is modeled after the proven KC-10 boom, which has performed extremely well in its 30 years of operation. Weíre enhancing its reliability, making it even better.

Five test booms are being built. The first will be used for risk-reducing laboratory tests that are scheduled to begin early next year. The second will be installed on a test aircraft to further evaluate the design.

Boeing invented the air refueling boom and has been building, upgrading and modifying them for more than 60 years. The company remains on plan to deliver the initial 18 combat-ready KC-46As by 2017. It will deliver 179 to the Air Force by 2027.




All of this week's top headlines to your email every Friday.


 
 

 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 
 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 

 
LM-C5

Lockheed Martin delivers 29th C-5M Super Galaxy

The 29th Lockheed Martin C-5M Super Galaxy takes off on its delivery flight.  Lockheed Martin delivered the 29th C-5M Super Galaxy to the U. S. Air Force July 28. A Defense Contract Management Agency (DCMA) aircrew ferried the...
 
 

Northrop Grumman successfully delivers deformable mirror for world’s largest solar telescope

The world’s largest ground-based solar telescope is one step closer to operation with the acceptance of the deformable mirror engineered by AOA Xinetics, a Northrop Grumman company. The Daniel K. Inouye Solar Telescope, currently under construction on Haleakala on the island of Maui, Hawaii, will offer unprecedented high-resolution images of the sun using the latest...
 
 

Raytheon appoints president, Integrated Defense Systems

Raytheon Chairman and CEO Thomas A. Kennedy announced July 30 the appointment of Wesley D. Kremer as President, Integrated Defense Systems, effective immediately. Kremer, 50, previously served as vice president of the Air and Missile Defense Systems product line of Raytheon Missile Systems. He succeeds Daniel J. Crowley, who informed the company of his intention...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>