Business

September 4, 2013

EURO HAWK® sets Record with 25-hour nonstop flight in Germany

On Aug. 8, the EURO HAWK(R) unmanned aircraft sets an endurance record by flying 25.3 hours nonstop in European airspace.

 

The EURO HAWK® unmanned aircraft system set an endurance record Aug. 8 when it flew continuously for 25.3 hours in European airspace.

Built by Northrop Grumman, operating through its subsidiary Northrop Grumman ISS International Inc., and Cassidian, the UAS climbed to 58,600 feet over Manching Air Base, Germany.

With a wingspan greater than most commercial airliners, EURO HAWK® can fly at altitudes more than 60,000 feet for more than 30 hours. It can detect radar and communication emitters with its advanced signals intelligence sensors and updated payload software.

“This is the longest flight flown in European skies by an unrefueled UAS in the more than 30,000-pound [14,600-kilogramme] class,” said Rolf Wirtz, head of Mission Systems, Cassidian’s UAS branch. “The EURO HAWK® has performed safely and reliably with good results throughout its entire flight test programme. It is the only system that can meet Germany’s requirement for high-altitude signals intelligence surveillance missions.”

On June 6, the EURO HAWK® flew over the North Sea for the first time, soaring throughout Germany before returning 6.5 hours later to Manching Air Base.

“To date, the EURO HAWK® has completed 19 flights and approximately 200 flight hours,” said Janis Pamiljans, sector vice president and general manager of Unmanned Systems for Northrop Grumman’s Aerospace Systems sector. “I commend the entire EURO HAWK® customer and industry team on achieving this record-breaking flight. We remain committed to delivering the best technology solution at the most affordable cost to meet Germany’s national security interests.”

EURO HAWK® is an interoperable, modular and cost-effective replacement to the retired fleet of manned Breguet Atlantic aircraft, which was in service from 1972-2010. The flight test phase is currently scheduled through September 2013.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 3, 2015

News Carter To China: US ‘Will Fly, Sail, Operate Wherever Law Allows’ Defense Secretary Ash Carter, in a speech billed as all about a new personnel approach for the Pentagon, laid out a clear line in the sand of the temporary islands the Chinese have been building. http://breakingdefense.com/2015/09/carter-to-china-us-will-fly-sail-operate-wherever-law-allows/ LRS-B details emerge: Major t...
 
 

News Briefs September 3, 2015

Soldier injured after parachute failed to deploy A soldier was injured during a U.S. Army Special Operations parachute training exercise in western Montana. Army officials at Fort Bragg, N.C., say 16 soldiers were conducting a free-fall parachute jump from two Blackhawk helicopters near Hamilton Aug. 31 when one soldier had an equipment malfunction and was...
 
 

Boeing, Jet2.com finalize order for 27 Next Generation 737-800s

Boeing and UK Leisure Airline Jet2.com have finalized an order for 27 Next Generation 737-800s, valued at approximately $2.6 billion at current list prices. Jet2.com currently operates an all-Boeing fleet of nearly 60 aircraft; however, this is the organization’s first direct Boeing order.† The aircraft will be used to take the company’s package holiday and...
 

 
boeing-emirates

Boeing, Emirates celebrate airline’s 150th 777 delivery

Boeing and Emirates Airline Sept. 3 celebrated the simultaneous delivery of three 777s — two 777-300ERs and one 777 Freighter — marking the entry of the 150th 777 into Emirates’ fleet. The delivery marks the first tim...
 
 

U.S. Air Force selects Chromalloy for F108 gas turbine engine module repairs

Chromalloy announced Sept. 2 that it has been selected by the U.S. Air Force to provide repairs on low pressure turbine modules for the F108 aircraft engine fleet, in a contract valued at up to $74 million. The one-year agreement was contracted by the Tinker Air Force Base in Oklahoma and includes four one-year options...
 
 
raytheon-colorado

Raytheon expanding in Colorado Springs

Raytheon will speed up growth of its Colorado Springs presence after signing a $700 million multi-year indefinite-delivery/indefinite-quantity contract to support operations at NORAD’s Cheyenne Mountain Complex. Under the...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>