Business

September 9, 2013

Raytheon moves forward on DARPA Persistent Close Air Support (PCAS) program

Raytheon is moving forward with the Defense Advanced Research Projects Agency on the agency’s Persistent Close Air Support program, whose software could enable ground troops to receive close air support sooner by improving coordination among joint terminal attack controllers, airborne sensors and weapons.

Originally designed for the A-10 Thunderbolt, the recently expanded PCAS program intends to now develop a platform- and sensor-agnostic electronics suite that can be easily integrated onto multiple platforms.

During the current 12-month phase 2 effort, Raytheon is maturing the PCAS program from preliminary design to a critical design review, with an option for phase 3. The PCAS Phase 2 contract was awarded in Raytheon’s fourth quarter of 2012 and modified in the third quarter of 2013. The phase 3 PCAS contract is expected to include an 18-month, $25 million effort culminating in a series of flight tests and live-fire demonstrations.

Raytheon is the systems integrator for PCAS and leads an industry team comprised of Rockwell Collins, General Electric and BAE Systems. Raytheon brings its expertise in overall systems integration, weapons, aircraft integration and unmanned aircraft system ground control stations to PCAS.

“Every minute on the ground counts for warfighters waiting for close air support,” said Tom Bussing, vice president of Raytheon Missile Systems’ Advanced Missile Systems product line. “PCAS could reduce the critical minutes it takes to get it to them. Raytheon is not just developing next-generation weapons, we are constantly finding ways to make them more effective in theater to protect our troops.”




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>