Defense

September 13, 2013

DOD officials announce missile defense siting study

Pursuant to the fiscal 2013 National Defense Authorization Act, the Defense Department has initiated a study to evaluate five candidate sites in the continental United States for the potential future deployment of additional ground-based interceptors, Pentagon officials announced Sept. 12.

Two missile defense sites with long-range interceptor missiles already are active at Fort Greely, Alaska, and Vandenberg Air Force Base, Calif. Today, these sites provide protection for the U.S. against limited intercontinental ballistic missile attacks, officials said.

“In response to a congressional requirement, we are evaluating several sites in the continental United States for a potential future deployment of additional Ground-based Interceptors, or GBIs,” said Navy Vice Adm. James D. Syring, the director of the Missile Defense Agency. “While the administration has not made a decision to build another missile defense facility in the U.S. for homeland defense, if a decision were to be made in the future to construct a new site, completing the required site study and environmental impact statement would shorten the timeline required to build such a site.”

Completing the mandatory siting study and the associated follow-on environmental impact statement would decrease the time necessary to build a site if a decision is made to do so, officials said. An environmental impact study would take 18 to 24 months to complete once the siting study is finished, they added.

A small Defense Department team will visit each candidate site to obtain information on basic infrastructure, including the electrical power supply, water resources, transportation access and other areas for assessing the suitability of a potential site.

All of the sites are on federal land and are operated by the Defense Department, the National Guard or both, officials said.  They are:

  • Fort Drum, N.Y.;
  • Camp Ethan Allen Training Site, Vt.;
  • Naval Air Station Portsmouth SERE Training Area, Maine;
  • Camp Ravenna Joint Training Center, Ohio; and
  • Fort Custer Training Center, Mich.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 2, 2014

News: Debris yields clues that pilot never ejected - When investigators were finally able to safely enter the crash site of an F-15C “Eagle” fighter jet on the afternoon of Aug. 27, they made a grim discovery that concluded more than 30 hours of searching – the pilot never managed to eject from the aircraft.  ...
 
 

News Briefs September 2, 2014

Pentagon: Iraq operations cost $560 million so far U.S. military operations in Iraq, including airstrikes and surveillance flights, have cost about $560 million since mid-June, the Pentagon said Aug. 29. Rear Adm. John Kirby, the Pentagon press secretary, said the average daily cost has been $7.5 million. He said it began at a much lower...
 
 

Unmanned aircraft partnership reaches major milestone

A team of research students and staff from Warsaw University of Technology have successfully demonstrated the first phase of flight test and integration of unmanned aircraft platforms with an autonomous mission control system. The demonstration marks a significant milestone in a partnership between the university and Lockheed Martin that began earlier this year. This is...
 

 

Raytheon delivers first Block 2 Rolling Airframe Missiles to US Navy

Raytheon delivered the first Block 2 variant of its Rolling Airframe Missile system to the U.S. Navy as part of the company’s 2012 Low Rate Initial Production contract. RAM Block 2 is a significant performance upgrade featuring enhanced kinematics, an evolved radio frequency receiver, and an improved control system. “As today’s threats continue to evolve,...
 
 
Courtesy photograph

Two Vietnam War Soldiers, one from Civil War to receive Medal of Honor

U.S. Army graphic Retired Command Sgt. Maj. Bennie G. Adkins and former Spc. 4 Donald P. Sloat will receive the Medal of Honor for actions in Vietnam. The White House announced Aug. 26 that Retired Command Sgt. Maj. Bennie G. A...
 
 

Sparks fly as NASA pushes limits of 3-D printing technology

NASA has successfully tested the most complex rocket engine parts ever designed by the agency and printed with additive manufacturing, or 3-D printing, on a test stand at NASA’s Marshall Space Flight Center in Huntsville, Ala. NASA engineers pushed the limits of technology by designing a rocket engine injector – a highly complex part that...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>