Business

September 13, 2013

Northrop Grumman delivers AEHF Flight 4 antenna precision pointing unit

Northrop Grumman technicians in Redondo Beach, Calif., thread wiring and cabling through the fourth protected communications payload for the U.S. Air Force’s Advanced Extremely High Frequency satellite system.

 

REDONDO BEACH, Calif. – The recent delivery of an electronics unit that precisely positions a highly sophisticated suite of antennas for the U.S. Air Force’s fourth Advanced Extremely High Frequency satellite continued Northrop Grumman’s consistent, on-schedule performance building protected communications payloads for the AEHF fleet.

The company delivered payloads for the first three Advanced EHF satellites ahead of schedule in 2007, 2008 and 2009, respectively, to Lockheed Martin Space Systems, Sunnyvale, Calif., the AEHF prime contractor. Integration of the recently delivered gimbal control unit begins immediately.

Advanced EHF, the next generation of protected military communications satellites, provides vastly improved global, survivable, highly secure, protected communications for strategic command and tactical warfighters operating on ground, sea and air platforms. The system also serves international partners including Canada, the Netherlands and the United Kingdom.

“The complexity of this payload provides users with literally millions of options for countering various enemy electronic, cyber and physical threats,” said Stuart Linsky, vice president, communication programs for Northrop Grumman Aerospace Systems. “The gimbal control unit on Advanced EHF payloads is one of the most advanced in the industry, operating seamlessly for precision pointing and for optimizing system performance.”

Each AEHF payload contains 10 mechanically steered antennas as part of a subsystem that processes gimbal-pointing commands for precision pointing. The GCU operates two crosslink antennas, two nulling antennas and six gimbaled dish antennas, all of which have greatly increased pointing accuracy and improved reliability.

“The benefit to warfighters is high reliability and high data rate broadband communications in remote regions not covered by fixed RF antenna assets,” Linsky said.

The AEHF payload provides and controls all EHF uplink, Super High Frequency downlink and crosslink functions, beam forming, on-board nulling, signal processing, and time and frequency control for low, medium and extended data rate operation.

The company has provided sophisticated and robust protected satellite communications payloads with increasing, highly secure connectivity to U.S. military forces for nearly 30 years. As the only company with this capability, Northrop Grumman delivers survivable communications that help achieve information superiority.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 18, 2014

Business: Lockheed to Lose 17 F-35s Under Automatic Pentagon Cuts - Pentagon will cut 17 of the 343 F-35 fighters it planned to buy from Lockheed Martin in fiscal 2016 through 2019 unless Congress repeals automatic budget cuts, according to a new Defense Department report. DOD looking for ways not to break MH-60R helo deal - The...
 
 

News Briefs April 18, 2013

U.S. military deaths in Afghanistan at 2,177 As of April 15, 2014, at least 2,177 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,802 military service members have died in Afghanistan as a result...
 
 
LM-F35-hours

F-35 fleet surpasses 15,000 flying hours

The Lockheed Martin F-35 Lightning II fleet recently surpassed 15,000 flight hours, marking a major milestone for the program.  “Flying 15,000 hours itself demonstrates that the program is maturing, but what I think is e...
 

 
nasa-cassini

NASA Cassini images may reveal birth of new Saturn moon

NASA’s Cassini spacecraft has documented the formation of a small icy object within the rings of Saturn that may be a new moon, and may also provide clues to the formation of the planet’s known moons. Images taken w...
 
 

NASA completes LADEE mission with planned impact on Moon’s surface

Ground controllers at NASA’s Ames Research Center in Moffett Field, Calif., have confirmed that NASA’s Lunar Atmosphere and Dust Environment Explorer spacecraft impacted the surface of the moon, as planned, between 9:30 and 10:22 p.m., PDT, April 17. LADEE lacked fuel to maintain a long-term lunar orbit or continue science operations and was intentionally sent...
 
 
Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech

NASA’s Kepler telescope discovers first Earth-size planet in ‘habitable zone’

Photograph courtesy of NASA Ames/SETI Institute/JPL-Caltech Kepler-186f resides in the Kepler-186 system about 500 light-years from Earth in the constellation Cygnus. The system is also home to four inner planets, seen lined up...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>