Business

September 18, 2013

Boeing flies first 787-9 Dreamliner

boeing-dreamliner1
 

The Boeing 787-9 Dreamliner took to the skies for the first time Sept. 17, beginning a comprehensive flight-test program leading to certification and delivery in mid-2014.

With its distinctive new Boeing livery, the newest member of the efficient 787 family completed a 5-hour, 16-minute flight, taking off from Paine Field in Everett, Wash., at 11:02 a.m. local time and landing at 4:18 p.m. at Seattle’s Boeing Field.

“Today’s first flight marks a significant milestone for our team, including our partners,” said Boeing Commercial Airplanes President and Chief Executive Officer Ray Conner. “We are tremendously proud to have our customers fly the 787-9 and look forward to delivery of the first airplane to Air New Zealand next year.”

During today’s flight, 787-9 Senior Project Pilot Mike Bryan and 787 Chief Pilot Randy Neville departed to the north, reaching an altitude of 20,400 feet (6,218 meters) and an airspeed of 250 knots, or about 288 miles (463 kilometers) per hour, customary for a first flight. While Capts. Bryan and Neville tested the airplane’s systems and structures, onboard equipment transmitted real-time data to a flight-test team on the ground in Seattle.

“We accomplished a lot in this flight, and it went really well,” said Bryan. “The 787-9 is a great jet and we wanted to just keep on flying.”

Powered by two Rolls-Royce Trent 1000 engines, the first 787-9 will be joined in flight test by two additional airplanes, one of which will feature General Electric GEnx engines. Those airplanes are in the final stages of assembly in Boeing’s Everett factory. Over the coming months, the fleet will be subjected to a variety of tests and conditions to demonstrate the safety and reliability of the airplane’s design.

boeing-dreamliner2

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes first opened with the 787-8. With the fuselage stretched by 20 feet (6 meters) over the 787-8, the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers), with the same exceptional environmental performance — 20 percent less fuel use and 20 percent fewer emissions than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. Twenty-five customers from around the world have ordered 388 787-9s, accounting for 40 percent of all 787 orders.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 2, 2015

News: Israel lobbies for more missile defense funds than Obama sought - For the second consecutive year, Israeli officials have asked the U.S. Congress to add more than $300 million to President Barack Obama’s budget request for their nation’s missile-defense programs.   Business: Inside one of the most intense, and unusual, Pentagon contracting wars - The much-anticipated...
 
 

News Briefs March 2, 2015

Italy resumes Navy exercise amid new tensions over Libya The Italian Navy is resuming exercises in the Mediterranean Sea, including near the coast of Libya, amid concerns about rapidly deteriorating security in the North African nation. The exercise began March 2 and includes anti-submarine, anti-aircraft and anti-ship training operations. The exercise was suspended for a...
 
 
LM-AEHF

Ingenuity drives Lockheed’s AEHF program to production milestone early

Lockheed Martin has successfully integrated the propulsion core and payload module for the fourth Advanced Extremely High Frequency (AEHF) satellite nearly five months ahead of schedule. Reaching this critical milestone early a...
 

 

First all-electric propulsion satellites send first on-orbit signals

Two Boeing 702SP (small platform) satellites, the first all-electric propulsion satellites to launch, have sent initial signals from space, marking the first step toward ABS, based in Bermuda, and Eutelsat, based in Paris, being able to provide enhanced communication services to their customers. Whatís more, the satellites were launched as a conjoined stack on a...
 
 

GA-ASI, Sener team to offer Predator B to Spain

General Atomics Aeronautical Systems, Inc. and SENER, a leading Spanish engineering company, announced March 2 that they have signed a teaming agreement that promotes the use of the multi-mission Predator B® RPA to support Spain’s airborne surveillance and reconnaissance requirements.  GAASI is a leading manufacturer of Remotely Piloted Aircraft systems, radars, and electro-optic and relate...
 
 
raytheon-satellite

Raytheon’s ‘Blue Marble’ imaging sensor delivered on schedule

Raytheon has delivered a second Visible Infrared Imaging Radiometer Suite instrument to support the National Oceanic and Atmospheric Administration’s Joint Polar Satellite System mission. The second VIIRS unit will fly ab...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>