Business

September 18, 2013

Boeing flies first 787-9 Dreamliner

boeing-dreamliner1
 

The Boeing 787-9 Dreamliner took to the skies for the first time Sept. 17, beginning a comprehensive flight-test program leading to certification and delivery in mid-2014.

With its distinctive new Boeing livery, the newest member of the efficient 787 family completed a 5-hour, 16-minute flight, taking off from Paine Field in Everett, Wash., at 11:02 a.m. local time and landing at 4:18 p.m. at Seattle’s Boeing Field.

“Today’s first flight marks a significant milestone for our team, including our partners,” said Boeing Commercial Airplanes President and Chief Executive Officer Ray Conner. “We are tremendously proud to have our customers fly the 787-9 and look forward to delivery of the first airplane to Air New Zealand next year.”

During today’s flight, 787-9 Senior Project Pilot Mike Bryan and 787 Chief Pilot Randy Neville departed to the north, reaching an altitude of 20,400 feet (6,218 meters) and an airspeed of 250 knots, or about 288 miles (463 kilometers) per hour, customary for a first flight. While Capts. Bryan and Neville tested the airplane’s systems and structures, onboard equipment transmitted real-time data to a flight-test team on the ground in Seattle.

“We accomplished a lot in this flight, and it went really well,” said Bryan. “The 787-9 is a great jet and we wanted to just keep on flying.”

Powered by two Rolls-Royce Trent 1000 engines, the first 787-9 will be joined in flight test by two additional airplanes, one of which will feature General Electric GEnx engines. Those airplanes are in the final stages of assembly in Boeing’s Everett factory. Over the coming months, the fleet will be subjected to a variety of tests and conditions to demonstrate the safety and reliability of the airplane’s design.

boeing-dreamliner2

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes first opened with the 787-8. With the fuselage stretched by 20 feet (6 meters) over the 787-8, the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers), with the same exceptional environmental performance — 20 percent less fuel use and 20 percent fewer emissions than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. Twenty-five customers from around the world have ordered 388 787-9s, accounting for 40 percent of all 787 orders.




All of this week's top headlines to your email every Friday.


 
 

 

Northrop Grumman awarded mission support services contract

The U.S. Army awarded Northrop Grumman a cost-plus-fixed-fee contract, with a potential value of $205 million, to continue providing mission logistics services in support of combat brigades training at the National Training Center in Fort Irwin, Calif. The contract covers one base year and two one-year options. Support will include the full range of mission...
 
 

Lockheed Martin completes operational flight tests of GMLRS alternative warhead

DALLAS, July 28, 2014 /PRNewswire/ –†Lockheed Martin has successfully completed all Developmental Test/Operational Test flight tests for the new Guided Multiple Launch Rocket System Alternative Warhead at White Sands Missile Range, N.M. The DT/OT tests included rockets fired at both mid and long range. All rockets were fired from a High Mobility Artillery Rocket System...
 
 
lm-kmax

Lockheed Martin’s unmanned cargo helicopter team returns from deployment

After lifting more than 4.5 million pounds of cargo and conducting thousands of delivery missions for the U.S. Marine Corps, the Lockheed Martin and Kaman Aerospace Corporation K-MAX cargo unmanned aircraft system has returned ...
 

 

SPEEA files age discrimination charge against Boeing

After months of investigation, the Society of Professional Engineering Employees in Aerospace, IFPTE Local 2001, charged Boeing with age discrimination. Acting on behalf of SPEEA-represented engineers, the union filed the third-party charges July 23 with the Equal Employment Opportunity Commission and the Washington State Human Rights Commission. The evidence is overwhelming that Boeing hatched...
 
 

Commercial jets push Boeing profits up 52 percent

Increased production of passenger jets helped push up Boeing’s profit by 52 percent in the second quarter, topping Wall Street’s expectations. The Chicago-based company said net income increased to $1.65 billion, or $2.24 per share, from $1.09 billion, or $1.41 per share, in the same quarter a year ago. Earnings, adjusted for non-recurring costs, came...
 
 

Comprehensive MEADS network tests demonstrate unmatched plug-and-fight missile defense capabilities

The Medium Extended Air Defense System recently completed a comprehensive system demonstration at Pratica di Mare Air Base near Rome, Italy. The two-week test demonstration included significant first-time events that were observed by several national delegations. “The outstanding result is that we have demonstrated the full range of advanced network capabilities that only MEADS can...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>