Business

September 18, 2013

Boeing flies first 787-9 Dreamliner

boeing-dreamliner1
 

The Boeing 787-9 Dreamliner took to the skies for the first time Sept. 17, beginning a comprehensive flight-test program leading to certification and delivery in mid-2014.

With its distinctive new Boeing livery, the newest member of the efficient 787 family completed a 5-hour, 16-minute flight, taking off from Paine Field in Everett, Wash., at 11:02 a.m. local time and landing at 4:18 p.m. at Seattle’s Boeing Field.

“Today’s first flight marks a significant milestone for our team, including our partners,” said Boeing Commercial Airplanes President and Chief Executive Officer Ray Conner. “We are tremendously proud to have our customers fly the 787-9 and look forward to delivery of the first airplane to Air New Zealand next year.”

During today’s flight, 787-9 Senior Project Pilot Mike Bryan and 787 Chief Pilot Randy Neville departed to the north, reaching an altitude of 20,400 feet (6,218 meters) and an airspeed of 250 knots, or about 288 miles (463 kilometers) per hour, customary for a first flight. While Capts. Bryan and Neville tested the airplane’s systems and structures, onboard equipment transmitted real-time data to a flight-test team on the ground in Seattle.

“We accomplished a lot in this flight, and it went really well,” said Bryan. “The 787-9 is a great jet and we wanted to just keep on flying.”

Powered by two Rolls-Royce Trent 1000 engines, the first 787-9 will be joined in flight test by two additional airplanes, one of which will feature General Electric GEnx engines. Those airplanes are in the final stages of assembly in Boeing’s Everett factory. Over the coming months, the fleet will be subjected to a variety of tests and conditions to demonstrate the safety and reliability of the airplane’s design.

boeing-dreamliner2

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes first opened with the 787-8. With the fuselage stretched by 20 feet (6 meters) over the 787-8, the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers), with the same exceptional environmental performance — 20 percent less fuel use and 20 percent fewer emissions than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. Twenty-five customers from around the world have ordered 388 787-9s, accounting for 40 percent of all 787 orders.




All of this week's top headlines to your email every Friday.


 
 

 

Raytheon wins $46 million contract for South Korean Global Hawk ground stations

Raytheon has been awarded a contract valued at up to $45.7 million by Northrop Grumman Aerospace Systems for ground segments in support of four Global Hawk unmanned aircraft systems recently purchased by the Republic of Korea. Under this contract, Raytheon will deliver one building-based and one mobile ground segment to locations in South Korea. Work...
 
 

TOW 2A RF missiles successfully fired from helicopter

In the first of its kind launch, Raytheon fired tube-launched, optically-tracked, wireless-guided 2A radio frequency practice missiles from an AH-1W Cobra attack helicopter during a December exercise.  Raytheon, working with the Naval Air Systems Command, fired two TOW 2A RF practice missiles at ranges exceeding 2600 meters. The two tests verified the missile’s capability to...
 
 
NG-growler2

Northrop Grumman delivers center/aft ‘shipset’ for first international EA-18G Growler

Northrop Grumman photograph Northrop Grumman mechanics perform final quality inspections on the center/aft fuselage shipset produced by the company for the first Australian EA-18G Growler. The subassembly will be delivered to B...
 

 

Boeing, ANA finalize order for three 787-10 Dreamliners

Boeing and All Nippon Airways (ANA) today finalized an order for three 787-10 Dreamliners, valued at approximately $900 million at list prices. With this order, originally announced as a commitment in January 2015, ANA becomes Boeing’s newest 787-10 customer and first airline in Asia to operate the entire family of 787 Dreamliners. “We truly appreciate...
 
 

Poland’s MESKO, Raytheon sign second letter of intent

In a move designed to collaborate and share advanced defense technologies, Raytheon’s Missile Systems business signed a Letter of Intent with MESKO, Poland’s leading missile and ammunition manufacturer. Areas of cooperation focus on Raytheon’s solutions for the KRAB howitzer precision fires and new Polish Attack Helicopter, including offset proposals and opportunities for MESK...
 
 

Airbus Group delivers first new UH-72A Lakota for Army initial-entry trainer mission

Airbus Group March 25 delivered to the U.S. Army the first UH-72A Lakota helicopter to come off the Airbus Helicopters Inc. production line configured for the Lakota’s latest mission, as the service’s initial-entry training helicopter. The aircraft will join seven Lakotas previously in the Army inventory that have already been modified to the training configuration...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>