Business

September 18, 2013

Boeing flies first 787-9 Dreamliner

boeing-dreamliner1
 

The Boeing 787-9 Dreamliner took to the skies for the first time Sept. 17, beginning a comprehensive flight-test program leading to certification and delivery in mid-2014.

With its distinctive new Boeing livery, the newest member of the efficient 787 family completed a 5-hour, 16-minute flight, taking off from Paine Field in Everett, Wash., at 11:02 a.m. local time and landing at 4:18 p.m. at Seattle’s Boeing Field.

“Today’s first flight marks a significant milestone for our team, including our partners,” said Boeing Commercial Airplanes President and Chief Executive Officer Ray Conner. “We are tremendously proud to have our customers fly the 787-9 and look forward to delivery of the first airplane to Air New Zealand next year.”

During today’s flight, 787-9 Senior Project Pilot Mike Bryan and 787 Chief Pilot Randy Neville departed to the north, reaching an altitude of 20,400 feet (6,218 meters) and an airspeed of 250 knots, or about 288 miles (463 kilometers) per hour, customary for a first flight. While Capts. Bryan and Neville tested the airplane’s systems and structures, onboard equipment transmitted real-time data to a flight-test team on the ground in Seattle.

“We accomplished a lot in this flight, and it went really well,” said Bryan. “The 787-9 is a great jet and we wanted to just keep on flying.”

Powered by two Rolls-Royce Trent 1000 engines, the first 787-9 will be joined in flight test by two additional airplanes, one of which will feature General Electric GEnx engines. Those airplanes are in the final stages of assembly in Boeing’s Everett factory. Over the coming months, the fleet will be subjected to a variety of tests and conditions to demonstrate the safety and reliability of the airplane’s design.

boeing-dreamliner2

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes first opened with the 787-8. With the fuselage stretched by 20 feet (6 meters) over the 787-8, the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers), with the same exceptional environmental performance — 20 percent less fuel use and 20 percent fewer emissions than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. Twenty-five customers from around the world have ordered 388 787-9s, accounting for 40 percent of all 787 orders.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 21, 2014

News: Former Ranger breaks silence on Pat Tillman death: I may have killed him - Almost 10 years after the friendly fire death of former NFL star turned Army Ranger Pat Tillman, a fellow ranger admits that he may have been the one who fired the fatal shot.   Business: Ship study should favor existing designs -...
 
 

News Briefs April 21, 2014

Navy OKs changes for submariners’ sleep schedules The U.S. Navy has endorsed changes to submarine sailors’ schedules based on research into sleep patterns by a military laboratory in Connecticut. With no sunlight to set day apart from night on a submarine, the Navy for decades has staggered sailors’ working hours on schedules with little resemblance...
 
 

NASA cargo launches to space station aboard SpaceX resupply mission

Nearly 2.5 tons of NASA science investigations and cargo are on the way to the International Space Station aboard SpaceX’s Dragon spacecraft. The spacecraft launched atop a Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida at 3:25 p.m., EDT, April 18. The mission is the company’s third...
 

 

Second series of CASIS-sponsored research payloads launch to ISS

The Center for the Advancement of Science in Space is proud to announce several sponsored research payloads have launched to the International Space Station onboard the Space Exploration Technology Corporation’s Dragon cargo capsule. This marks the second series of investigations headed to the station that are sponsored by CASIS, the nonprofit responsible for managing research...
 
 

Boeing to give California workers $47 million in back pay

PALMDALE, Calif. – Boeing will pay $47 million to hundreds of current and former Southern California employees who are owed back pay and benefits, a union announced April 18. An arbitrator ruled against the aerospace giant in January and laid down guidelines for the payments and interest, but it took months to cull through records...
 
 

NASA selects commercial crew program manager

NASA has selected Kathy Lueders as program manager for the agency’s Commercial Crew Program. Lueders, who has served as acting program manager since October 2013, will help keep the nation’s space program on course to launch astronauts from American soil by 2017 aboard spacecraft built by American companies. “This is a particularly critical time for...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>