Business

September 20, 2013

Boeing, GECAS finalize order for 10 787-10 Dreamliners

Boeing and GE Capital Aviation Services, the commercial aircraft leasing and financing arm of General Electric, announced Sept. 19 that they have completed an order for 10 787-10 Dreamliners.

The order, valued at $2.9 billion at list prices, completes the commitment originally announced during the 2013 Paris Air Show in June and builds momentum in the airplane leasing market for the 787-10.

“These airplanes are an excellent addition to our broad portfolio of modern, fuel-efficient aircraft,” said GECAS President and CEO Norman C.T. Liu. “This order enables us to offer our airline customers an airplane with the lowest operating costs.”

The new 787-10, launched in June 2013, will extend and complement the family, carrying 300 to 330 passengers up to 7,000 nautical miles (12,964 km) and accommodating more than 90†percent of the world’s twin-aisle routes. The 787-10 also will be 25 percent more fuel-efficient than airplanes of its size today and more than 10 percent better than anything being offered by the competition for the future.

“As a leader in the leasing industry, GECAS’s 787-10 order is a strong statement about the capabilities of this highly efficient airplane,” said Boeing Commercial Airplanes President and CEO Ray Conner. “The 787-10 will provide GECAS customers the efficiencies and passenger comforts needed to succeed in an increasingly competitive marketplace.”

The 787-10 will feature the 787 family’s unique interior. The interior technologies make the passenger experience more enjoyable, including large, dimmable windows; cleaner air; higher humidity; lower cabin altitude; bigger stowage bins; soothing LED lighting and a smoother ride. To date, the 787-10 has accumulated 102 orders and commitments from five customers worldwide.

These 787-10s bring the total number of airplanes GECAS has ordered from Boeing to 598 since 1995, including 737s, 747s, 757s, 767s, 777s and 787s. To date, GECAS has taken delivery of 451 Boeing airplanes.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines April 14, 2014

Business: U.S. Navy looks to leverage submarine work to keep costs down - The U.S. Navy hopes to save money and time by leveraging industry investments as it replaces its Ohio-class nuclear-armed submarines with the Virginia-class attack submarines now built by General Dynamics Corp and Huntington Ingalls Industries Inc.  Study raises red flags on California aerospace...
 
 

News Briefs April 14, 2014

U.S. Navy destroyer Zumwalt christened in Maine The U.S. Navy has christened the first ship of its newest class of destroyers, a 610-foot (186-meter)-long warship with advanced technologies and a stealthy design that will reduce its visibility on enemy radars. The warship bears the name of the late Adm. Elmo ìBudî Zumwalt, who became the...
 
 
Navy photograph by Seamn Edward Guttierrez III

Russian aircraft flies near U.S. Navy ship in Black Sea

Navy photograph by Seamn Edward Guttierrez III Sailors man the rails as the Arleigh Burke-class guided-missile destroyer USS Donald Cook arrives at Naval Station Rota, Spain, Feb. 11, 2014. Donald Cook is the first of four Arle...
 

 

45th Space Wing launches NRO Satellite on board Atlas V

The 45th Space Wing successfully launched a United Launch Alliance Atlas V rocket from Space Launch Complex 41, Vandenberg Air Force Base, Calif., at 1:45 p.m. April 10 carrying a classified national security payload. The payload was designed and built by the National Reconnaissance Office. “I am proud of the persistence and focus of the...
 
 

U.S. Air Force selects Cubic for Moroccan P5 air combat training system

Cubic Defense Systems, a subsidiary of Cubic Corporation announced April 11 it has been awarded a contract valued at more than $5 million from the U.S. Air Force to supply its P5 Combat Training System to the Moroccan Air Force. Morocco will join the United States Air Force, Navy, and Marine Corps, along with a...
 
 
Lockheed Martin photograph

NASA’s Orion Spacecraft powers through first integrated system testing

Lockheed Martin photograph Engineers in the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, perform avionics testing on the Orion spacecraft being prepared for its first trip to space later this ye...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>