Business

September 20, 2013

Boeing, GECAS finalize order for 10 787-10 Dreamliners

Boeing and GE Capital Aviation Services, the commercial aircraft leasing and financing arm of General Electric, announced Sept. 19 that they have completed an order for 10 787-10 Dreamliners.

The order, valued at $2.9 billion at list prices, completes the commitment originally announced during the 2013 Paris Air Show in June and builds momentum in the airplane leasing market for the 787-10.

“These airplanes are an excellent addition to our broad portfolio of modern, fuel-efficient aircraft,” said GECAS President and CEO Norman C.T. Liu. “This order enables us to offer our airline customers an airplane with the lowest operating costs.”

The new 787-10, launched in June 2013, will extend and complement the family, carrying 300 to 330 passengers up to 7,000 nautical miles (12,964 km) and accommodating more than 90†percent of the world’s twin-aisle routes. The 787-10 also will be 25 percent more fuel-efficient than airplanes of its size today and more than 10 percent better than anything being offered by the competition for the future.

“As a leader in the leasing industry, GECAS’s 787-10 order is a strong statement about the capabilities of this highly efficient airplane,” said Boeing Commercial Airplanes President and CEO Ray Conner. “The 787-10 will provide GECAS customers the efficiencies and passenger comforts needed to succeed in an increasingly competitive marketplace.”

The 787-10 will feature the 787 family’s unique interior. The interior technologies make the passenger experience more enjoyable, including large, dimmable windows; cleaner air; higher humidity; lower cabin altitude; bigger stowage bins; soothing LED lighting and a smoother ride. To date, the 787-10 has accumulated 102 orders and commitments from five customers worldwide.

These 787-10s bring the total number of airplanes GECAS has ordered from Boeing to 598 since 1995, including 737s, 747s, 757s, 767s, 777s and 787s. To date, GECAS has taken delivery of 451 Boeing airplanes.




All of this week's top headlines to your email every Friday.


 
 

 

Northrop Grumman awarded mission support services contract

The U.S. Army awarded Northrop Grumman a cost-plus-fixed-fee contract, with a potential value of $205 million, to continue providing mission logistics services in support of combat brigades training at the National Training Center in Fort Irwin, Calif. The contract covers one base year and two one-year options. Support will include the full range of mission...
 
 

Lockheed Martin completes operational flight tests of GMLRS alternative warhead

DALLAS, July 28, 2014 /PRNewswire/ –†Lockheed Martin has successfully completed all Developmental Test/Operational Test flight tests for the new Guided Multiple Launch Rocket System Alternative Warhead at White Sands Missile Range, N.M. The DT/OT tests included rockets fired at both mid and long range. All rockets were fired from a High Mobility Artillery Rocket System...
 
 
lm-kmax

Lockheed Martin’s unmanned cargo helicopter team returns from deployment

After lifting more than 4.5 million pounds of cargo and conducting thousands of delivery missions for the U.S. Marine Corps, the Lockheed Martin and Kaman Aerospace Corporation K-MAX cargo unmanned aircraft system has returned ...
 

 

SPEEA files age discrimination charge against Boeing

After months of investigation, the Society of Professional Engineering Employees in Aerospace, IFPTE Local 2001, charged Boeing with age discrimination. Acting on behalf of SPEEA-represented engineers, the union filed the third-party charges July 23 with the Equal Employment Opportunity Commission and the Washington State Human Rights Commission. The evidence is overwhelming that Boeing hatched...
 
 

Commercial jets push Boeing profits up 52 percent

Increased production of passenger jets helped push up Boeing’s profit by 52 percent in the second quarter, topping Wall Street’s expectations. The Chicago-based company said net income increased to $1.65 billion, or $2.24 per share, from $1.09 billion, or $1.41 per share, in the same quarter a year ago. Earnings, adjusted for non-recurring costs, came...
 
 

Comprehensive MEADS network tests demonstrate unmatched plug-and-fight missile defense capabilities

The Medium Extended Air Defense System recently completed a comprehensive system demonstration at Pratica di Mare Air Base near Rome, Italy. The two-week test demonstration included significant first-time events that were observed by several national delegations. “The outstanding result is that we have demonstrated the full range of advanced network capabilities that only MEADS can...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>