Defense

September 23, 2013

Hill welcomes F-35 workload

Dignitaries and employees at Hill Air Force Base, Utah, get their first look at the F-35A Lightning II Joint Strike Fighter Sept. 20, 2013. Hill, Lockheed Martin, Utah elected officials and community members gathered for a ceremony to commemorate the beginning of F-35 depot maintenance at the Ogden Air Logistics Complex. The F-35A is a multi-variant, multi-role, fifth generation fighter, and will undergo organic depot modification work at Hill AFB.

Several hundred people gathered Sept. 20 in hangar 237 at Hill Air Force Base, Utah, to witness the first F-35A Lightning II arrive for depot level maintenance during a ceremony hosted by the Ogden Air Logistics Complex commander, Maj. Gen. H. Brent Baker, Sr.

The ceremony addressed Hill’s key role in the depot repair and the F-35’s role in national defense by several different speakers which included Sen. Mike Lee; Lorraine Martin, Lockheed Martin’s Executive Vice President and General Manager of the F-35 Lightning II Program; Rear Adm. Randolph Mahr, DOD F-35 Deputy Program Director; Lt. Gen. Bruce Litchfield, Air Force Sustainment Center commander; and Sen. Orrin Hatch.

Baker was the final speaker and gave the order to open the doors and unveil the aircraft to the capacity-packed-hangar’s attendees. Other dignitaries at the ceremony included local mayors, Utah Lt. Gov. Greg Bell and members of the Utah State House and Senate.

The first F-35A conventional takeoff and landing variant is from the 422nd Test and Evaluation Squadron, Nellis AFB, Nev., and is in a prototype configuration. The Ogden ALC will modify the aircraft with a series of structural and systems modifications to enhance critical capabilities needed during operational test and evaluation testing.

“For decades the shared partnership between Lockheed Martin and the Ogden ALC team has taken our legacy platforms – the F-16, C-130 and F-22 – to the next level, and the same will hold true for the F-35 Lightning II,” said Martin. “This aircraft was designed from its inception to evolve through modifications and upgrades so that our warfighters can continually outpace their opposition. I look forward to what the future holds for the F-35 and am excited to see that evolution unfold.”

The first F-35A Lightning II Joint Strike Fighter to arrive at Hill Air Force Base, Utah, sits on display in front of a hangar the morning of Sept. 20, 2013. Hill, Lockheed Martin, Utah elected officials and community members gathered for a ceremony to commemorate the beginning of F-35 depot maintenance at Hill AFB. The F-35 is a multi-variant, multi-role, fifth generation fighter, and will undergo organic depot modification work at Hill AFB.

Litchfield also talked about this historic day in the history of the ALC.

“The F-35 found the right home for sustainment,” he said. “Team Hill will deliver cost effective modifications for this aircraft.”

The F-35 Lightning II combines advanced stealth with fighter speed and agility, fully fused sensor information, network-enabled operations and advanced sustainment. Three distinct variants of the F-35 will eventually replace the A-10 and F-16 for the U.S. Air Force.

 




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 31, 2015

News: Carter: Military leaders could arm more troops at home – Following the recent fatal shooting of four Marines and a sailor in Tennessee, Defense Secretary Ash Carter is ordering the military services to consider new policies that would enhance security for troops at home, including potentially arming more personnel.   Business: DOD weighs supplier base,...
 
 

News Briefs July 31, 2015

U.S. delivering eight newer F-16 warplanes to Egypt The United States Embassy in Cairo says the U.S. is delivering eight newer F-16 warplanes to Egypt as part of an ongoing military support package. It says in a July 30 statement that the aircraft, of the current Block 52 production variant, will be flown in from...
 
 
Lockheed Martin photograph

Lockheed Martin successfully tests design changes for Orion spacecraft’s fairing separation system

Lockheed Martin photograph A protective panel for Orion’s service module is jettisoned during testing at Lockheed Martin’s Sunnyvale, California facility. This test series evaluated design changes to the spacecraft’s fair...
 

 

Australian company to provide parts for initial production of Triton UAS

Northrop Grumman has awarded the first Australian supplier contract for the U.S. Navy’s MQ-4C Triton unmanned aircraft system initial production lot to Ferra Engineering. Brisbane-based Ferra Engineering will manufacture mechanical sub-assemblies for the first four Triton air vehicles including structural components. “At Northrop Grumman it’s very important to not only develop...
 
 
Boeing photograph

CH-46 ‘Phrog’ makes its last hop

Boeing photograph The CH-46 Sea Knight helicopter commonly known as the “Phrog,” is set to retire and to be flown one last time by Reserve Marine Medium Helicopter Squadron (HMM) 774 on Aug. 1. The CH-46 Sea Knight is a med...
 
 

Insitu awarded LRIP Lot IV RQ-21A Blackjack Systems contract

Under the terms of its latest contract, Insitu will build six RQ-21A Blackjack systems for the U.S. Navy and Marine Corps. The $78-million Small Tactical Unmanned Aircraft Systems Lot IV Low Rate Initial Production contract is the latest event in the program’s progression toward the Initial Operational Test and Evaluation phase.   “This award will...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>