Defense

October 21, 2013

Wing surpasses 2,000 sled test missions

The graphic displays a sled-propelled warhead just before it penetrates the target, midway through the target and exiting the target. Eglin’s sled track is part of the 96th Test Wing’s Kinetic Energy Munitions Test Facility at the Eglin Test and Training Complex Test Area C-74. The KEMTF at ETTC has been in operation since 1956 and reached 1,000 sled test missions in September 1978. The unit surpasses 2,000 test shots this summer.

 

The 96th Test Wing at Eglin Air Force Base, Fla., recently reached a historic testing milestone this summer. The 2,000th sled test mission was conducted at the 96th TW’s Kinetic Energy Munitions Test Facility at the Eglin Test and Training Complex Test Area C-74.

The 2,000th test was conducted in support of fuze development for the Air Force Life Cycle Management Center Hard Target Void Sensing Fuze program. The purpose of this series of sled tests was to demonstrate performance and shock survivability of the fuze during simulated target environments at both ambient and cold temperatures when installed in two different warheads.

“This 2,000th sled test event is a significant historical event for the wing and the 96th Range Group. Our team takes great pride in knowing their scientific and engineering contributions have a key role in continuing many years of consistent, successful test support,” said Jeri Ghosh, the 96th Range Group technical director.

The team consists of the 96th Range Support Squadron and the Eglin Test and Training Complex Operations and Maintenance Contractor, InDyne. The 96RANSS provides the technical, scientific and engineering support to create and accomplish a sled test event and the KEMTF is operated and maintained by InDyne.

The variety of testing that can be conducted at the KEMTF includes penetration tests, warhead survivability, fuze function, aeroballistics, simulated loft dispersion, transportation container evaluation, and simulated captive flight test of systems.

“KEMTF sled testing plays a critical role in the Air Force test process and directly supports the Armament Directorate’s charter to equip our warfighters with effective strike weapons,” said Robbie Thomas, the sled track instrumentation systems engineer. “It is a cost effective ground test capability proven to be a valuable asset to the Air Force and the weapons test process.”

The KEMTF mission is to offer test customers the ability to test inert and live, fuzed munitions against a variety of targets at operational velocities (up to 3,000 feet per second).

“Testing conducted at the KEMTF produces incredibly high quality video and more importantly it produces decision quality engineering data for weapons developers,” said Thomas. The Range Systems Flight provides range instrumentation and data acquisition systems design to capture test data.

The frequency of sled tests is driven directly by a weapon’s development schedule and test requirements. Many tests have complex target setups and often the test item requires environmental conditioning.

A warhead sits ready to launch prior to the 2,000th sled test shot earlier this year at Eglin Air Force Base, Fla. Eglin’s sled track is part of the 96th Test Wing’s Kinetic Energy Munitions Test Facility at the Eglin Test and Training Complex Test Area C-74. The KEMTF at ETTC has been in operation since 1956 and reached 1,000 sled test missions in September 1978. The unit surpasses 2,000 test shots this summer.

“On average we shoot one to two shots per month,” said Thomas.

Since 2010, more than 40 test shots were conducted with two more scheduled in 2013.

The targets those test shots are aimed at can be as large as 22 feet high by 22 feet wide, four feet thick and weigh as much as 160 tons. The Targets Flight provides the professional engineering design and fabrication of the target structures.

“We take great care during the design and build up of the targets, all in accordance with our customers’ requirements,” said Robin Peacock, P.E., the Targets Flight chief.

Once the design is complete, the monstrous targets are constructed at KEMTF’s on-site concrete casting yard. Building a large scale target can take up to a week to cast, and about 28 days to cure based on the specific design criteria and materials.

To move the target into place, a 230-ton crane and hauler transport and place the targets at precise locations at the end of the track to achieve accurate angle-of-attack impacts required for warhead testing. It can take up to 10 days to place the target depending on the complexity of the target design and layout.

The Targets Flight not only creates and places the target, it also provides engineering design for the buildup of the pusher and carrier sleds. It is also involved in the technical design of the combination of rocket motors to propel warheads down sled track at a terminal velocity of up to 3,000 feet per second.

“By design, we are able to engineer and produce accurate delivery of a warhead on target within five degrees angle of attack, which offers an unprecedented high degree of repeatability and reliability,” said Michael Nagel, the sled test design engineer.

The KEMTF at ETTC has been in operation since 1956 and reached 1,000 sled test missions in September 1978.

“The KEMTF’s success is due to the wealth of knowledge, expertise and many years of test experience within the 96th TW,” said Thomas.




All of this week's top headlines to your email every Friday.


 
 

 
Army photograph by C. Todd Lopez

Smart-mortar will help Soldiers more effectively hit targets

Army photograph by C. Todd Lopez Nick Baldwin and Evan Young, researchers with the Armament Research Development and Engineering Center at Picatinny Arsenal, Pennsylvania, discuss the 120mm Guided Enhanced Fragmentation Mortar ...
 
 

Air Force assigns new chief scientist

The Air Force announced the service’s new chief scientist to serve as a science and technology adviser to the secretary of the Air Force and the chief of staff of the Air Force, May 21. Dr. Greg Zacharias will be the 35th chief scientist and is ready to “dive in” to his new role. “I...
 
 

TSgt promotion release delayed to allow system validation

Technical sergeant promotion selection results, originally scheduled for release May 28, will be delayed to enable the Air Force to continue to validate extensive system changes to the Weighted Airman Promotion System, officials announced. The 15E6 technical sergeant promotion cycle is the first to incorporate recent changes in the enlisted evaluation and promotion system. Recent...
 

 

Freedom completes rough water trials

The littoral combat ship USS Freedom completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials in late March the Navy reported May 21. The U.S. Navy must demonstrate the seaworthiness and structural integrity of each new ship class. One of the primary ways the Navy verifies these qualities is through a...
 
 

Air Force releases Strategic Master Plan

The Air Force officially released the Strategic Master Plan May 21, which is the latest in a series of strategic documents designed to guide the organizing, training and equipping of the force over the coming decades. The SMP builds on the strategic imperatives and vectors described in the capstone document, America’s Air Force: A Call...
 
 

HYT extension possible for SrA-MSgt in 35 career fields

Eligible senior airmen, staff sergeants, technical sergeants and master sergeants in 35 Air Force specialties will be able to apply for a high year of tenure extension and, if approved, will be able to extend between 12 and 24 months past their current HYT. The Air Force is introducing several personnel and manpower initiatives to...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>