Space

October 23, 2013

NASA awards bridge contract for multidisciplinary engineering, technical services

NASA has awarded a bridge contract to AS and D Inc. of Greenbelt, Md., for continued multidisciplinary engineering and technical services until a follow-on contract is awarded at the agency’s Goddard Space Flight Center, also in Greenbelt.

Known as Multidisciplinary Engineering and Technical Services II Bridge (METS 2 Bridge), this is a cost-plus-fixed-fee, indefinite delivery-indefinite quantity contract with an ordering value ranging from a minimum of $5 million to a maximum of $90 million and a period of performance extending from Oct. 22 through April 30, 2015. There is one $20 million option for a one-year extension through Sept. 30, 2015.

AS & D Inc. will continue its systems engineering support for several operating divisions in Goddard’s Applied Engineering and Technology Directorate, including mechanical systems; software management; instrument systems and technology; electrical engineering; and mission engineering and systems analysis. This support includes the formulation, design, development, flight and non-flight fabrication, integration, test, verification, and operation of components, subsystems, systems, science instruments, and complete spacecraft for multiple projects.

Task orders issued under the METS 2 Bridge contract provide critical support to a wide range of NASA programs and projects including the James Webb Space Telescope; the Magnetosphere Multiscale mission; the Global Precipitation Measurement mission; Geostationary Operational Environmental Satellites; the Ice, Cloud, Land Elevation Satellite II/Atlas mission; and the Mars Atmosphere Volatile Evolution mission.




All of this week's top headlines to your email every Friday.


 
 

 

NASA launches new Micro-g NExT for undergraduates

NASA is offering undergraduate students an opportunity to participate in a new microgravity activity called Micro-g Neutral Buoyancy Experiment Design Teams. The deadline for proposals is Jan. 28, 2015. Micro-g NExT challenges students to work in teams to design and build prototypes of spacewalking tools to be used by astronauts for spacewalk training in the...
 
 
launch1

Storm fails to quench liftoff of secret reconnaissance satellite

The fiery launch of an Atlas V (541), among the most powerful of the venerable Atlas family, briefly dispelled the gloom over Californiaís Central Coast on the evening of Dec. 12. A team of personnel from United Launch Allianc...
 
 

Lockheed Martin wins Alaska spaceport bid

ANCHORAGE, Alaska – The state-owned space agency Dec. 12 named Lockheed Martin the winner of a bidding process to reconfigure a launch pad to accommodate larger rockets than what the Kodiak Launch Complex can currently handle. Lockheed Martin beat out three other bidders to reconfigure launch pad one at the Kodiak site, officials with the...
 

 
LM-orion-recover

Orion spacecraft heading home after successful at-sea recovery by U.S. Navy, NASA

Engineers are getting their first look at the Lockheed Martin-built Orion spacecraft following its successful flight test and recovery Dec. 5. With the spacecraft recovered from the Pacific and brought to port in San Diego, tec...
 
 
Northrop Grumman image

Northrop Grumman to supply navigation system for SBIRS GEO-5 satellite

Northrop Grumman image Artist’s rendering of the Space-Based Infrared System’s Geosynchronous Earth Orbit satellite.   WOODLAND HILLS, Calif. –¬†Northrop Grumman has been selected by prime contractor Lock...
 
 
boeing-spacecraft

Boeing CST-100 spacecraft moves another step closer to flight

Boeing and NASA recently completed the Ground Segment Critical Design Review and set the baseline design for the company’s Commercial Crew Transportation System, moving a step closer to the planned early 2017 voyage to th...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>