Business

October 23, 2013

UTC Aerospace Systems selected by General Dynamics Land Systems to develop generator subsystem for Abrams ECP1 modernization program

UTC Aerospace Systems has been selected by General Dynamics Land Systems to design, develop, build and qualify the Generator Subsystem for the Abrams ECP1 modernization upgrade.

The generator subsystem includes both the electric generator and CAN-bus-enabled digital controller.

Prototype systems will be delivered to GDLS in the second half of 2014 for installation and qualification field testing on the Abrams.  UTC Aerospace Systems is a unit of United Technologies Corp.

The Abrams M1 main battle tank provides unprecedented mobility, survivability, and firepower for the warfighter.  To enhance its future combat superiority, the US Army awarded the Abrams ECP1 engineering development contract to GDLS in September 2012 to implement and integrate a group of system improvements into a single upgrade program for the M1A2SEPv2 baseline tank.  The objective of the effort is to prepare the Abrams tank to accept additional Army-directed requirements in the future without impacting current vehicle performance.  The generator subsystem, to be built by the company’s Space Systems business, located in Rockford, Ill., will enable GDLS to regain critical Space, Weight, Power and Cooling (SWaP-C) margin on the Abrams main battle tank, now slated to be an active component of the Army’s fleet through 2050.

The UTC Aerospace Systems generator subsystem will be capable of delivering up to 28 kW of output power at 28VDC to meet the current and future electric power needs of the Abrams M1 with power regulation provided by a compact digital controller.  Global Embedded Technologies, a small business Army contractor located in Farmington Hills, Mich., was selected by UTC Aerospace Systems to develop and furnish the digital controller.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 30, 2014

News: Software to power F-35 running as much as 14 months late - Software needed to operate Lockheed Martin’s F-35 jet, the Pentagon’s costliest weapons system, may be as much as 14 months late for required flight testing, according to a Pentagon review.   Business: Lockheed will turn on JLTV production line In August; 6-D truck...
 
 

News Briefs July 30, 2014

U.S. military deaths in Afghanistan at 2,197 As of July 29, 2014, at least 2,197 members of the U.S. military had died in Afghanistan as a result of the U.S.-led invasion of Afghanistan in late 2001, according to an Associated Press count. At least 1,819 military service members have died in Afghanistan as a result...
 
 
Lockheed Martin photograph by Tom Reynolds

F-35B successfully completes wet runway, crosswind testing

Lockheed Martin photograph by Tom Reynolds F-35B aircraft BF-4, piloted by Lockheed Martin Test Pilot Dan Levin, starts down the runway as part of wet runway and crosswind testing at Edwards AFB, Calif. In an important program ...
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. ...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 
NASA photograph by Carla Thomas

Katherine Lott awarded NASA Armstrong employee scholarship

NASA photograph by Carla Thomas Katherine Lott, the recipient of the 2014 NASA Armstrong Employee Exchange Council Joseph R. Vensel Memorial Scholarship, is congratulated by NASA Armstrong center director David McBride. Flankin...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>