Business

October 31, 2013

Raytheon, U.S. Air Force complete series of SDB II test flights

Raytheon and the U.S. Air Force concluded a series of test flights with the Small Diameter Bomb II (SDB II) culminating in direct hits on targets moving at operationally representative speeds.

Earlier supporting tests were performed in a multitude of different environments and scenarios, key to maturing seeker algorithms and validating the weapon’s aerodynamic performance. All test flights helped reinforce the system’s capability to satisfy a critical war fighter need.

“These successes are the latest in a series of test flights demonstrating Raytheon’s readiness to progress the SDB II program to the System Verification Review and Milestone C,” said John O’Brien, SDB II program director for Raytheon Missile Systems. “These tests showcase the game-changing capability of Raytheon’s tri-mode seeker to detect, track and engage moving targets in adverse weather.”

SDB II can hit targets from a range of more than 40 nautical miles. It has a powerful warhead capable of destroying armored targets, yet keeps collateral damage to a minimum through a small explosive footprint. It is highly accurate and offers warfighters the flexibility to change targets through a datalink that passes inflight updates to the weapon.

SDB II employs Raytheon’s uncooled tri-mode seeker. The new seeker operates in three modes: millimeter-wave radar, uncooled imaging infrared and semiactive laser. These three modes enable the weapon to seek and destroy targets, even in adverse weather conditions from standoff ranges. SDB II’s integrated seeker is built in Raytheon’s automated tri-mode seeker factory.

The Department of Defense has validated SDB II as a weapon that meets a critical warfighter need and has invested more than $700 million in the SDB II program.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines August 1, 2014

News: Military downsizing leaves U.S. too weak to counter global threats, panel finds - An independent panel appointed by the Pentagon and Congress said July 31 that President Obama’s strategy for sizing the armed services is too weak for today’s global threats. Defense industry funds flow to contenders for key House chairmanships - Four of the top...
 
 

News Briefs August 1, 2014

China allows foreign reporters at news conference Foreign reporters are being allowed to attend China’s Defense Ministry briefings for the first time, marking a small milestone in the increasingly confident Chinese military’s efforts to project a more transparent image. Restrictions still apply and there is no sign of an improvement in the generally paltry amount...
 
 
Army photograph by John Andrew Hamilton

Rapid Equipping Force, PEO Soldier test targeting device at White Sands Missile Range

Army photograph by John Andrew Hamilton SFC Justin Rotti, a combat developer from the Training and Doctrine Command Fire Cell, Fires Center of Excellence, uses a developmental hand held precision targeting device during a test ...
 

 

NASA awards modification for geophysics, geodynamics, space geodesy support contract

NASA has awarded a modification to Stinger Ghaffarian Technologies Inc. of Greenbelt, Md. to continuing working the the Geophysics, Geodynamics and Space Geodesy Support Services contract. The maximum ordering value of the GGSG contract will increase to $76.8 million. The previous amount was $49.5 million. The increase in the maximum ordering value of the contract...
 
 
boeing-japan

Boeing, All Nippon Airways finalize order for 40 wide-body airplanes

  Boeing and All Nippon Airways July 31 finalized an order for 40 widebody airplanes – 20 777-9Xs, 14 787-9 Dreamliners and six 777-300ERs (Extended Range) – as part of the airline’s strategic long-haul fleet ren...
 
 

Excalibur Ib enters full rate production, receives $52 million award

TUCSON, Ariz., July 31, 2014 /PRNewswire/ — Raytheon’s Excalibur Ib precision guided projectile has entered full rate production. U.S. Army approval of FRP completes Excalibur Ib’s low rate initial production phase. †Additionally, the U.S. Army has awarded Raytheon $52 million for continued Excalibur Ib production. “The full rate production decision is the culmination ...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>