Defense

November 6, 2013

AFRL engineers conduct rain erosion testing

Materials and coatings created for aerospace systems that travel at high rates of speed are repeatedly exposed to rain droplets could make the systems, materials and coatings susceptible to damage or erosion.

Engineers from the Air Force Research Laboratory Materials and Manufacturing Directorate’s Systems Support Division conducted testing on mission critical components for a Navy aircraft system that were experiencing premature erosion in flight.

Conducted in late-August 2013, RX engineers, in cooperation with peers from the Navy, tested the components in their unique, one-of-a-kind supersonic rain erosion (SURE) testing rig, which simulates the impact of rain on aerospace systems travelling at transonic and supersonic speeds.

The SURE capability (nicknamed “The Supersoaker”), which was installed at RX’s Coatings Technology Integration Office facility in 2011, enables researchers to conduct both predictive modeling of material behaviors, and large- and full-scale component rain erosion testing. The testing rig appealed to Navy personnel, because it allowed them to recreate in flight conditions in a laboratory environment where they could closely monitor the impact of erosion on identical components several times.

The SURE capability allows researchers to test systems, materials and new technologies for missile materials, coatings for aircraft leading edges, optical materials, rotor blades, radomes, antennas and other commercial technologies at speeds up to Mach 2.5. Because the SURE operates at speeds that are not already offered by the AFRL Rain Erosion Test Facility or the Holloman High Speed Test Track (HHSTT), material and system developers can use the SURE capability to establish a testing baseline in the mid-range, which was unavailable before development of the SURE apparatus.

The SURE apparatus produces 1-2 mm diameter water droplets, and achieves 12 gallons of output a minute at 50,000 pounds per square inch. Droplet size is controlled by the size of an interchangeable nozzle used in the system. Droplet speed is independently controlled by pump pressure.

During the testing, erosion damage was capture using a high speed camera monitoring components through a window to the chamber. This allowed Navy personnel to review the results of the testing on a video monitor in another part of the facility immediately following testing.

The SURE capability is operated and maintained by personnel from the University of Dayton Research Institute (UDRI) by-way-of an on-site contract with the CTIO. A cooperative research and development agreement between RX and UDRI accommodates testing for commercial and industrial customers.

Navy counterparts were pleased with the results of the testing and are currently discussing their return for follow on testing, which will allow them to determine preventative maintenance or design changes to safeguard their system from the affects of rain erosion.

Additionally, this testing was the first full-scale component testing conducted using the SURE capability at CTIO, which provides confidence in its ability to handle full-scale component testing for other DoD, Air Force, commercial and industry customers in the future.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines March 4, 2015

News: Pentagon: Another BRAC will save money - Pentagon planners have a new pitch to lawmakers skeptical of a fresh round of base closings: We promise we’ll save money this time.   Business: China’s new C919 will begin test flights this year - China’s new superjet will take to the skies for the first time later this...
 
 
Air Force photograph by SrA. Jensen Stidham

World War II pilot reunited with P-47

Air Force photograph by SrA. Jensen Stidham Retired Air National Guard Chief Warrant Officer 2 Robert Hertel, laughs while under the wing of a P-47 Thunderbolt during the Heritage Flight Training and Certification Course Feb. 2...
 
 

News Briefs March 4, 2015

General: 8,500 Islamic State fighters killed in Iraq so far The U.S.-led military coalition in Iraq has killed more than 8,500 Islamic State fighters since its bombing campaign began in August, the top general overseeing the coalition said March 3. Army Gen. Lloyd Austin, the commander of U.S. Central Command, said the Islamic State, which...
 

 
Lockheed Martin photograph

Turning up the heat

Lockheed Martin photograph Lockheed Martin ATHENA laser weapon system defeats a truck target by disabling the engine, demonstrating its military effectiveness against enemy ground vehicles. Latest evolution of Lockheed Martin l...
 
 

USO Visit

Air Force photograph by Jet Fabara Actor Vince Vaughn speaks with Edwards Airmen and 412th Security Forces Squadron members at the base library before introducing an advance screening of his new movie, “Unfinished Business,” at the base theater Feb. 28.
 
 

Sikorsky S-97 RAIDERô team begins final assembly of second aircraft

Sikorsky Aircraft Corp., a subsidiary of United Technologies Corp., announced March 4 the start of final assembly of the second S-97 RAIDERô helicopter at the company’s Development Flight Center. Along with a team of industry suppliers, Sikorsky is developing two RAIDERô prototypes to demonstrate the revolutionary new capabilities in improved maneuverability and flight speed. The...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>