Business

November 13, 2013

General Dynamics completes U.S. Army combat vehicle design review

General Dynamics Land Systems completed a successful Preliminary Design Review with the U.S. Army of its Ground Combat Vehicle Infantry Fighting Vehicle design on Oct. 31, 2013.

The four-day review was the culmination of many successful subsystem and component design reviews held from August through October.

During the review General Dynamics demonstrated that the baseline vehicle design is affordable, reliable and compliant to all Tier 1 requirements, which must be delivered in the vehicle’s initial configurations, and on track to gain compliance to selected Tier 2 requirements.† The review established that General Dynamics’ baseline Ground Combat Vehicle IFV design has a reasonable expectation of being judged operationally effective and suitable.

“The team did an outstanding job defining a path forward for the customer on the program,” said Robert Sorge, General Dynamics Land Systems senior director for the GCV IFV Program. “The strong performance has put us on a solid path for building the automotive test rig, continuing the system detailed design and enhancing each of the vehicle’s key subsystem and component level designs during the remainder of our technology demonstration contract.”

A team led by General Dynamics that includes Lockheed Martin, Raytheon Company and Tognum America, Inc., was awarded a $439.7 million contract for the Technology Development phase of the Army’s Ground Combat Vehicle Infantry Fighting Vehicle program in 2011. That contract was modified extending the period of performance six months into second quarter 2014.

The overall goal of the Army program is to develop and produce an affordable and operationally effective Infantry Fighting Vehicle in eight years.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines July 25, 2014

News: VA reform bills stalled by partisan bickering - Plans for a comprehensive Veterans Affairs Department reform bill that appeared all but finished a month ago devolved into partisan bickering and funding fights July 24, casting doubt on the future of a deal.   Business: Airbus, Boeing, Lockheed announce bids on Danish fighter competition; Saab withdraws -...
 
 

News Briefs July 25, 2014

Marines investigate corporal who vanished in Iraq U.S. Marine Corp officers are launching a formal investigation into whether a Lebanese-American Marine deserted his unit in Iraq or later after returning to the United States. A spokesman for the 2nd Marine Expeditionary Force at Camp Lejeune said July 24 that Cpl. Wassef Ali Hassoun is being...
 
 
Air Force photograph by A1C Erin OíShea

U.S. Forces display military might at Farnborough

Air Force photograph by A1C Erin O’Shea Capt. Tom Meyers discusses the F-15E Strike Eagle’s capabilities with spectators July 17, 2014, at the Farnborough International Airshow in England. Public access was granted ...
 

 
raptors4

Raptors, Falcons fuel up in desert skies

Three U.S. Air Force F-22 Raptors assigned to the 325th Fighter Wing, Tyndall Air Force Base, Fla., fly alongside a KC-135 Stratotanker assigned to the 93rd Air Refueling Squadron, Fairchild AFB, Wash., during Red Flag 14-3, Ju...
 
 
lm-kmax

Lockheed Martin’s unmanned cargo helicopter team returns from deployment

After lifting more than 4.5 million pounds of cargo and conducting thousands of delivery missions for the U.S. Marine Corps, the Lockheed Martin and Kaman Aerospace Corporation K-MAX cargo unmanned aircraft system has returned ...
 
 
Air Force photograph by A1C Thomas Spangler

Sun sets on Red Flag 14-3

Air Force photograph by A1C Thomas Spangler The sun sets behind a row of F-16 Fighting Falcons during Red Flag 14-3, July 16, 2014, at Nellis Air Force Base, Nev. Red Flag provides a series of intense air-to-air combat scenario...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>