Business

November 18, 2013

Boeing 787 Dreamliner reaches 1,000th order with Etihad Airways

The Boeing 787 Dreamliner received its 1,000th customer order Nov. 17 when Etihad Airways announced an order for 30 787-10 Dreamliners, valued at $8.7 billion at list prices.

With this order, the Dreamliner family has reached this sales milestone faster than any other widebody airplane in aviation history.

Launched in April 2004, the 787 family received its 1000th order in approximately nine years, about eight years faster than the popular Boeing 777. Including today’s announcement, the 787 Dreamliner has accumulated 1,012 orders from 60 customers worldwide.

“Our ongoing investment in the 787 is well-founded and is apparent by the record time in which the Dreamliner family received its 1,000th order,” said Boeing Commercial Airplanes President and CEO Ray Conner. “We are truly grateful for the continued confidence that our customers have placed in the 787 and together, we are excited about growing the product line and expanding our presence with this family of airplanes.”

Etihad now has 71 787 Dreamliners on order and is the world’s largest airline customer for the airplane.

“This is a significant, timely and essential order for us, as we celebrate our tenth anniversary and plan for our next decade and beyond,” said Etihad Airways President and CEO James Hogan. “In just 10 years, we have grown from a start-up carrier to a global airline. This order enables us to build upon our achievements, using the next generation of aircraft to support our next generation of development.”

In addition to bringing big-jet ranges to midsize airplanes, the 787 family provides airlines with unmatched fuel efficiency, resulting in exceptional environmental performance. The airplane uses at least 20 percent less fuel with 20 percent fewer emissions than today’s similarly sized airplanes. Airlines also realize more cargo revenue capacity — a 20 to 45 percent advantage over similarly sized airplanes.

The first member of the family, the 787-8, entered service in September 2011, and the longer 787-9 is in testing and on track to deliver in mid-2014. To date, 102 787 Dreamliners have been delivered to 16 customers around the world.

The 787-10 will be the third and longest member of the family. With its greater passenger and cargo capacity and high degree of commonality, the 787-10 will set a new benchmark for fuel efficiency and operating economics. The 787-10 will be 25 percent more efficient than airplanes of its size today and more than 10 percent better than anything offered by the competition for the future. Final assembly and flight test of the 787-10 are set to begin in 2017, with first delivery targeted for 2018.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines September 2, 2014

News: Debris yields clues that pilot never ejected - When investigators were finally able to safely enter the crash site of an F-15C “Eagle” fighter jet on the afternoon of Aug. 27, they made a grim discovery that concluded more than 30 hours of searching – the pilot never managed to eject from the aircraft.  ...
 
 

News Briefs September 2, 2014

Pentagon: Iraq operations cost $560 million so far U.S. military operations in Iraq, including airstrikes and surveillance flights, have cost about $560 million since mid-June, the Pentagon said Aug. 29. Rear Adm. John Kirby, the Pentagon press secretary, said the average daily cost has been $7.5 million. He said it began at a much lower...
 
 

Unmanned aircraft partnership reaches major milestone

A team of research students and staff from Warsaw University of Technology have successfully demonstrated the first phase of flight test and integration of unmanned aircraft platforms with an autonomous mission control system. The demonstration marks a significant milestone in a partnership between the university and Lockheed Martin that began earlier this year. This is...
 

 

Raytheon delivers first Block 2 Rolling Airframe Missiles to US Navy

Raytheon delivered the first Block 2 variant of its Rolling Airframe Missile system to the U.S. Navy as part of the company’s 2012 Low Rate Initial Production contract. RAM Block 2 is a significant performance upgrade featuring enhanced kinematics, an evolved radio frequency receiver, and an improved control system. “As today’s threats continue to evolve,...
 
 
Courtesy photograph

Two Vietnam War Soldiers, one from Civil War to receive Medal of Honor

U.S. Army graphic Retired Command Sgt. Maj. Bennie G. Adkins and former Spc. 4 Donald P. Sloat will receive the Medal of Honor for actions in Vietnam. The White House announced Aug. 26 that Retired Command Sgt. Maj. Bennie G. A...
 
 

Sparks fly as NASA pushes limits of 3-D printing technology

NASA has successfully tested the most complex rocket engine parts ever designed by the agency and printed with additive manufacturing, or 3-D printing, on a test stand at NASA’s Marshall Space Flight Center in Huntsville, Ala. NASA engineers pushed the limits of technology by designing a rocket engine injector – a highly complex part that...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>