Business

November 18, 2013

Boeing 787 Dreamliner reaches 1,000th order with Etihad Airways

The Boeing 787 Dreamliner received its 1,000th customer order Nov. 17 when Etihad Airways announced an order for 30 787-10 Dreamliners, valued at $8.7 billion at list prices.

With this order, the Dreamliner family has reached this sales milestone faster than any other widebody airplane in aviation history.

Launched in April 2004, the 787 family received its 1000th order in approximately nine years, about eight years faster than the popular Boeing 777. Including today’s announcement, the 787 Dreamliner has accumulated 1,012 orders from 60 customers worldwide.

“Our ongoing investment in the 787 is well-founded and is apparent by the record time in which the Dreamliner family received its 1,000th order,” said Boeing Commercial Airplanes President and CEO Ray Conner. “We are truly grateful for the continued confidence that our customers have placed in the 787 and together, we are excited about growing the product line and expanding our presence with this family of airplanes.”

Etihad now has 71 787 Dreamliners on order and is the world’s largest airline customer for the airplane.

“This is a significant, timely and essential order for us, as we celebrate our tenth anniversary and plan for our next decade and beyond,” said Etihad Airways President and CEO James Hogan. “In just 10 years, we have grown from a start-up carrier to a global airline. This order enables us to build upon our achievements, using the next generation of aircraft to support our next generation of development.”

In addition to bringing big-jet ranges to midsize airplanes, the 787 family provides airlines with unmatched fuel efficiency, resulting in exceptional environmental performance. The airplane uses at least 20 percent less fuel with 20 percent fewer emissions than today’s similarly sized airplanes. Airlines also realize more cargo revenue capacity — a 20 to 45 percent advantage over similarly sized airplanes.

The first member of the family, the 787-8, entered service in September 2011, and the longer 787-9 is in testing and on track to deliver in mid-2014. To date, 102 787 Dreamliners have been delivered to 16 customers around the world.

The 787-10 will be the third and longest member of the family. With its greater passenger and cargo capacity and high degree of commonality, the 787-10 will set a new benchmark for fuel efficiency and operating economics. The 787-10 will be 25 percent more efficient than airplanes of its size today and more than 10 percent better than anything offered by the competition for the future. Final assembly and flight test of the 787-10 are set to begin in 2017, with first delivery targeted for 2018.




All of this week's top headlines to your email every Friday.


 
 

 
Boeing photograph

Boeing program completes critical design, safety reviews

Boeing photograph Boeing recently completed the Phase Two Spacecraft Safety Review of its Crew Space Transportation-100 spacecraft and the Critical Design Review of its integrated systems, meeting all of the companyís Commerci...
 
 
LM-C130

Keep on Rockin’: C-130J ferries to Little Rock AFB

  The 61st Airlift Squadron at Little Rock Air Force Base, Ark., received another Lockheed Martin C-130J Super Hercules airlifter Aug. 21.  Brig. Gen. Brian Robinson, vice commander, 618th Air and Space Operations Center ...
 
 

Air Force tests Raytheon’s upgraded High-Speed Anti-Radiation Missile

Raytheon Company and the U.S. Air Force successfully flight tested an upgraded High-Speed Anti-Radiation Missile. The HARM Control Section Modification is more precise and accurate, which reduces potential collateral damage. During this test mission, an F-16 aircraft fired an HCSM, AGM-88F, against an emitter located outside of a zone of exclusion, which contained a similar...
 

 

F-16V completes major capability milestone

The newest configuration of the F-16 Fighting Falcon, the F-16V, has reached a major capability milestone with the integration of a new Active Electronically Scanned Array radar. Completing this milestone on schedule demonstrates our ability to meet program commitments, said Roderick McLean, vice president and general manager of the F-16/F-22 Integrated Fighter Group at Lockheed...
 
 
Lockheed Martin photograph

Robots moving robots: Lockheed Martin conducts first fully autonomous mission

Lockheed Martin photograph A K-MAX unmanned helicopter delivers an SMSS unmanned ground vehicle during a fully autonomous mission demonstration at Fort Benning, Ga. A safety pilot was on board K-MAX but did not operate the cont...
 
 

Lockheed Martin introduces maritime test bed

Using a newly developed advanced maritime test bed, Lockheed Martin recently demonstrated how continually evolving technologies such as data fusion and predictive analytics can be used to share intelligence quickly and securely – even in limited bandwidth naval settings. This new software test platform, designed to mimic different naval environments at sea and ashore, allowed...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>