Business

November 18, 2013

Boeing 787 Dreamliner reaches 1,000th order with Etihad Airways

The Boeing 787 Dreamliner received its 1,000th customer order Nov. 17 when Etihad Airways announced an order for 30 787-10 Dreamliners, valued at $8.7 billion at list prices.

With this order, the Dreamliner family has reached this sales milestone faster than any other widebody airplane in aviation history.

Launched in April 2004, the 787 family received its 1000th order in approximately nine years, about eight years faster than the popular Boeing 777. Including today’s announcement, the 787 Dreamliner has accumulated 1,012 orders from 60 customers worldwide.

“Our ongoing investment in the 787 is well-founded and is apparent by the record time in which the Dreamliner family received its 1,000th order,” said Boeing Commercial Airplanes President and CEO Ray Conner. “We are truly grateful for the continued confidence that our customers have placed in the 787 and together, we are excited about growing the product line and expanding our presence with this family of airplanes.”

Etihad now has 71 787 Dreamliners on order and is the world’s largest airline customer for the airplane.

“This is a significant, timely and essential order for us, as we celebrate our tenth anniversary and plan for our next decade and beyond,” said Etihad Airways President and CEO James Hogan. “In just 10 years, we have grown from a start-up carrier to a global airline. This order enables us to build upon our achievements, using the next generation of aircraft to support our next generation of development.”

In addition to bringing big-jet ranges to midsize airplanes, the 787 family provides airlines with unmatched fuel efficiency, resulting in exceptional environmental performance. The airplane uses at least 20 percent less fuel with 20 percent fewer emissions than today’s similarly sized airplanes. Airlines also realize more cargo revenue capacity — a 20 to 45 percent advantage over similarly sized airplanes.

The first member of the family, the 787-8, entered service in September 2011, and the longer 787-9 is in testing and on track to deliver in mid-2014. To date, 102 787 Dreamliners have been delivered to 16 customers around the world.

The 787-10 will be the third and longest member of the family. With its greater passenger and cargo capacity and high degree of commonality, the 787-10 will set a new benchmark for fuel efficiency and operating economics. The 787-10 will be 25 percent more efficient than airplanes of its size today and more than 10 percent better than anything offered by the competition for the future. Final assembly and flight test of the 787-10 are set to begin in 2017, with first delivery targeted for 2018.




All of this week's top headlines to your email every Friday.


 
 

 
boeing-chinook

Boeing delivers first U.S. Army multiyear II configured Chinook

Boeing July 29 delivered the first multiyear II configured CH-47F Chinook helicopter to the U.S. Army one month ahead of schedule. The delivery was celebrated in a ceremony at the production facility in Ridley Township, Penn. â...
 
 
Army photograph by SSgt. Angela Stafford

Engineers developing safer, more accurate tracer round

Army photograph Tracer rounds enable the shooter to follow the projectile trajectory to make aiming corrections. However, the light emitted by these rounds also gives away the position of the shooter. Engineers at Picatinny Ars...
 
 

General Dynamics to continue work on U.S. Air Force GPS III program

General Dynamics Advanced Information Systems, a business unit of General Dynamics, has been awarded a $25.4 million full-production contract from Lockheed Martin to support the U.S. Air Force Global Positioning System (GPS) III Network Communications Element for space vehicles seven and eight. The Air Force’s next-generation GPS III satellites will improve position, navigation and timing...
 

 

Javelin joint venture demonstrates vehicle-mounted missile launch

The Raytheon and Lockheed Martin Javelin Joint Venture recently fired a Javelin missile from a remote weapon station integrated onto a wheeled vehicle at Redstone Arsenal in Huntsville, Ala. The test demonstrated Javelin’s vehicle-launch capability to an international customer that has expressed interest in purchasing vehicles integrated with Javelin. The Javelin missile launched successfully...
 
 

Royal Australian Air Force scores direct hit with JSOW C

The Royal Australian Air Force has successfully tested a Raytheon Joint Standoff Weapon C against a hardened wall target at the RAAF Woomera Test Range. Launched from an F/A-18F Super Hornet at an operationally representative stand-off range and altitude of 25,000 feet, the JSOW C scored a direct hit. The RAAF test marked the third...
 
 

Boeing to assemble 787-10 Dreamliner in South Carolina

Boeing announced July 30 that final assembly of the 787-10, the newest and longest member of the 787 Dreamliner family of airplanes, will take place exclusively in North Charleston, S.C. Boeing will continue to assemble both 787-8s and 787-9s in Everett, Wash., and North Charleston. Design of the 787-10 is underway in Everett, with final...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>