Business

November 18, 2013

Boeing launches 777X with record-breaking orders, commitments

Boeing Nov. 17 launched the 777X program at the 2013 Dubai Airshow with a record-breaking number of customer orders and commitments for the newest member of its twin-aisle product family.

Agreements for 259 airplanes from four customers across Europe and the Middle East provide a strong foundation to support development and production of the airplane.

Representing the largest product launch in commercial jetliner history by dollar value, 777X orders and commitments include Lufthansa with 34 airplanes; Etihad Airways with 25; Qatar Airways with 50 and Emirates with 150 airplanes. The combined value of the agreements is more than $95 billion at list prices.

“We are proud to partner with each of these esteemed airlines to launch the 777X – the largest and most-efficient twin-engine jetliner in the world,” said Boeing Commercial Airplanes President and CEO Ray Conner. “Its ground-breaking engine technologies and all-new composite wing will deliver unsurpassed value and growth potential to our customers.”

The 777X builds on the passenger-preferred and market-leading 777, which today commands 55 percent of market share in its category in terms of backlog, and 71 percent of the in-service fleet worldwide. The 777X family includes the 777-8X and the 777-9X, both designed to respond to market needs and customer preferences.

The 777X builds on the best-in-class dispatch reliability from today’s 777, as well as offering more market coverage and revenue capability that surpasses the competition. The 777-8X competes directly with the A350-1000, while the 777-9X is in a class by itself.

Opening new growth opportunities for airlines, the 777-9X offers seating for more than 400 passengers, depending on an airline’s configuration choices. With a range of more than 8,200 nautical miles (15,185 km), the airplane will have the lowest operating cost per seat of any commercial airplane.

The second member of the family, the 777-8X, will be the most flexible jet in the world. The airplane will seat 350 passengers and offer an incredible range capability of more than 9,300 nautical miles (17,220 km). In addition, the airplane will have unmatched takeoff and payload capability compared to the competition.

“The airplane will build on the market-leading 777 and will provide superior operating economics,” said Conner. “The airplane will be 12 percent more fuel efficient than any competing airplane, necessary in today’s competitive environment.”

The 777X introduces the latest technologies in multiple places, including the most advanced commercial engine ever – the GE9X by GE Aviation – and an all-new high-efficiency composite wing that has a longer span than today’s 777. The airplane’s folding, raked wingtip and optimized span deliver greater efficiency, significant fuel savings and complete airport gate compatibility.

Like the 787 Dreamliner which was launched as the 7E7, the 777X will be formally named at a later date. Design of the 777X is underway and suppliers will be named in the coming months. Production is set to begin in 2017, with first delivery targeted for 2020.




All of this week's top headlines to your email every Friday.


 
 

 
dassault

Dassault Falcon Jet establishes new pilot operational support team

Arnaud Paulmier, head of Dassault Falcon Jet’s new operational support team. Dassault Falcon Jet recently established a new Pilot Operational Support Team in Teterboro, N.J., to support operators in the Western Hemisphere. Th...
 
 

U.S. Navy awards Raytheon $49.5 million enhanced Laser Maverick production contract

The U.S. Navy has awarded Raytheon a $49.5 million contract for production of new laser-guided Maverick missiles (AGM-65E2/L). The Navy also intends to exercise a contract option to purchase additional units bringing the total contract value to $54.9 million. The Maverick weapon system, a U.S. Air Force-led joint service program, is a forward firing, precision-guided,...
 
 
Northrop Grumman photograph by Alan Radecki

Second Northrop Grumman-built Triton UAS completes first flight

Northrop Grumman photograph by Alan Radecki The second MQ-4C Triton, built by Northrop Grumman for the U.S. Navy, successfully completed its first flight Oct. 15 PALMDALE, Calif. – The U.S. Navy’s second MQ-4C Triton un...
 

 
Raytheon photograph

Poland’s PIT-RADWAR signs letter of intent with Raytheon

Raytheon photograph Mike Shaughnessy, Vice President of Supply Chain, Raytheon Integrated Defense Systems and Jerzy Milosz, Member of Board and Director of R&D, PIT-RADWAR sign a letter of intent to explore further partners...
 
 

Raytheon to resume work on new electronic warfare planning management software program

The U.S. Army has directed Raytheon to resume work on an Electronic Warfare planning management software program that for the first time will give it automated tools to help plan and execute complex electronic warfare missions. The program restart follows a ruling by the U.S. Court of Federal Claims, which denied the protest filed by...
 
 

Northrop Grumman JCREW achieves milestone C; Program to enter production, deployment phase

Northrop Grumman has received Milestone C approval for its Joint Counter Radio-Controlled Improvised Explosive Device Electronic Warfare Increment 1 Build 1 (I1B1) system from the U.S. Naval Sea Systems Command. The JCREW I1B1 system is a jammer that defeats devices used to trigger improvised explosive devices (IEDs). Northrop Grumman developed mounted, dismounted and fixed-site variants...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>