Space

November 20, 2013

Ball Aerospace-built STPSat-3 Satellite Launches from Wallops Island

ball-satellite
The Ball Aerospace & Technologies Corp. STPSat-3 satellite built for the Department of Defense and part of the Operationally Responsive Space-3 (ORS-3) mission, successfully launched from Wallops Island, Va., on board a Minotaur I at 8:15 p.m., EST, Nov. 19.

STPSat-3 joins its predecessor, the Ball-built STPSat-2, which launched in 2010 on the same date.

These satellites demonstrate the ability to rapidly access space by using standard interfaces on a standard spacecraft bus.†Payloads are designed to be compatible with the spacecraft bus, resulting in lower spacecraft non-recurring costs, shorter acquisition timelines, decreased spacecraft build costs, and increased spaceflight opportunities.

“Standard interfaces allowed rapid satellite integration and test, and for the spacecraft bus to be built in 47 days independently of the payloads,” said Ball Aerospace President Rob Strain. “In less than a year, STPSat-3 was an integrated, fully-tested and ready-to-ship satellite with five payloads and a de-orbit module.”

Ball Aerospace has integrated the standard spacecraft bus used on STPSat-2 and STPSat-3 into its Ball Configurable Platform product line to offer customers more affordable and responsive space missions.

One of the instruments onboard the satellite, the Total Solar Irradiance Calibration Transfer Experiment is a sensor hosted for NOAA and NASA. The sensor, built by CU-Boulder’s Laboratory for Atmospheric and Space Physics will provide for continual calibration of the sun’s total energy input to the Earth, which affects Earth’s atmosphere and weather patterns.

“With very minor modifications and close collaboration with partners, the TCTE instrument was adapted for Ball’s flexible STPSat-3 spacecraft to provide critical weather information for the nation,” added Strain. “STPSat-3 was the perfect option to enable a quick ride to space and mitigated a possible total solar irradiance gap after the precursory TSI-measuring instrument experienced a launch failure in 2011.”

STPSat-3 is managed by the U.S. Air Force Space and Missile Systems Center, Space Development & Test Directorate at Kirtland Air Force Base, N.M., as part of the Space Test Program, Standard Interface Vehicle (STP-SIV) program.

The ORS-3 Mission, also known as the Enabler Mission, will demonstrate launch and range improvements to include: automated vehicle trajectory targeting, range safety planning, and flight termination; employ a commercial-like procurement with FAA licensing of a Minotaur 1; and launch the Air Force’s Space Test Program Satellite-3 and 28 cubesats on an Integrated Payload Stack.† These enablers not only focus on the ability to execute a rapid call up mission, they automate engineering tasks that once took months and reduce those timelines to days and/or hours† resulting in decreased mission costs.




All of this week's top headlines to your email every Friday.


 
 

 

Headlines October 20, 2014

News: Navy grounds ‘Top Guns’ - The F/A-18s needs spare parts and in too many cases they’re being taken from brand new jets. This is a risk to national security and pilots’ lives.   Business: Boeing seeks revised schedule for U.S. aerial tanker - Boeing is revising its master schedule for developing the new U.S. Air Force...
 
 

News Briefs October 20, 2014

New military medical team to help with Ebola in U.S. Defense Secretary Chuck Hagel has ordered the military to prepare and train a 30-member medical support team that could provide short-term help to civilian health professionals if there are more Ebola cases in the United States. His spokesman, Rear Adm. John Kirby, says the team...
 
 

Dragon ‘fires up’ for flight

The Air Force and NATO are undergoing a cooperative development effort to upgrade the avionics and cockpit displays of AWACS aircraft belonging to the 552nd Air Control Wing at Tinker Air Force Base, Okla., and the NATO E-3 Sentrys from Geilenkirchen, Germany. The Diminishing Manufacturing Sources Replacement of Avionics for Global Operations and Navigation, otherwise...
 

 
Boeing photographs

Boeing-built X-37B successfully completes third flight

Unmanned spacecraft concludes record-setting 674-day mission   Boeing photograph A third mission of the Boeing-built X-37B Orbital Test Vehicle was completed on Oct. 17, 2014, when it landed and was recovered at Vandenberg...
 
 

Boeing concludes commercial crew space act agreement for CST-100/Atlas V

Boeing has successfully completed the final milestone of its Commercial Crew Integrated Capability Space Act Agreement with NASA. The work and testing completed under the agreement resulted in significant maturation of Boeing’s crew transportation system, including the CST-100 spacecraft and Atlas V rocket. NASA in July approved the Critical Design Review Board milestone for Boeing’...
 
 

AF to release small business research solicitations

The Air Force Small Business Innovation Research and Small Business Technology Transfer program office is set to release its fiscal year 2015 list of topics Oct. 22, on the SBIR/STTR website.  Small businesses and research institutions with expertise to address the topics’ technology challenges are encouraged to submit proposals. During 2014, the Defense Department SBIR...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>