Space

November 25, 2013

NASA delivers precipitation satellite to Japan for 2014 launch

A U.S. Air Force C-5 transport aircraft carrying the Global Precipitation Measurement Core Observatory landed at Kitakyushu Airport in Japan at approximately 10:30 p.m., EST, Nov. 23.

An international satellite that will set a new standard for global precipitation measurements from space has completed a 7,300-mile journey from the United States to Japan, where it now will undergo launch preparations.

A U.S. Air Force C-5 transport aircraft carrying the Global Precipitation Measurement Core Observatory landed at Kitakyushu Airport, about 600 miles southwest of Tokyo, at approximately 10:30 p.m., EST, Nov. 23.

The spacecraft, the size of a small private jet, is the largest satellite ever built at NASAís Goddard Space Flight Center in Greenbelt, Md. It left Goddard inside a large shipping container Nov. 19 and began its journey across the Pacific Ocean Nov. 21 from Joint Base Andrews in Maryland, with a refueling stop in Anchorage, Alaska.

From Kitakyushu Airport, the spacecraft was loaded onto a barge heading to the Japan Aerospace Exploration Agency’s Tanegashima Space Center on Tanegashima Island in southern Japan, where it will be prepared for launch in early 2014 on an H-IIA rocket.

“We have been building GPM hardware at Goddard for over four years,” said Art Azarbarzin, GPM project manager, who traveled with the spacecraft on its flight to Japan. “We are excited now to get the spacecraft to Tanegashima and looking forward to the launch.”

The satellite is designed to pool together precipitation measurements taken by a constellation of orbiting U.S. and international partner satellites, resulting in a single and comprehensive dataset of global precipitation every three hours.

The satellite will measure rain and snow using two science instruments: the GPM Microwave Imager and the Dual-frequency Precipitation Radar. The GMI captures precipitation intensities and horizontal patterns, while the DPR provides insights into the three-dimensional structure of rain, snow and other precipitation particles. Together, these two instruments provide a database of measurements against which other partner satellites’ microwave observations can be meaningfully compared and combined to make a global precipitation dataset.

The GPM mission is a partnership led by NASA and JAXA. Goddard built and assembled the satellite. JAXA provided the DPR instrument and launch services. The Ball Aerospace & Technologies Corp., Boulder, Colo., built the GMI under contract to Goddard.

The GPM constellation is a network of satellites from multiple U.S. and international space agencies, including NASA, JAXA, the U.S. Department of Defense’s Defense Meteorological Satellite Program, the U.S. National Oceanic and Atmospheric Administration; Japan; the Centre National d’Etudes Spatiales in France; the Indian Space Research Organisation; and the European Organisation for the Exploitation of Meteorological Satellites.




All of this week's top headlines to your email every Friday.


 
 

 

NASA partners punctuate summer with spacecraft development advances

Spacecraft and rocket development is on pace this summer for NASA’s aerospace industry partners for the agency’s Commercial Crew Program as they progress through systems testing, review boards and quarterly sessions under their† Space Act Agreements with the agency. NASA engineers and specialists continue their review of the progress as the agency and partners move...
 
 

NASA seeks proposals for commercial Mars data relay satellites

NASA has issued a Request for Information to investigate the possibility of using commercial Mars-orbiting satellites to provide telecommunications capabilities for future robotic missions to the Red Planet. We are looking to broaden participation in the exploration of Mars to include new models for government and commercial partnerships, said John Grunsfeld, associate administrator of NASAR...
 
 
NASA photograph

NASA’s Chandra X-ray Observatory celebrates 15th anniversary

NASA photograph To celebrate the 15th anniversary of NASA’s Chandra X-ray Observatory, four new images of supernova remnants are being released. These spectacular cosmic vistas are the glowing debris fields that were crea...
 

 
NASA photograph

NASA begins engine test project for space launch system rocket

NASA photograph RS-25 rocket engine No. 0525 is positioned onto the A-1 Test Stand at NASAís Stennis Space Center in Mississippi preparation for a series of developmental tests. Engineers have taken a crucial step in preparing...
 
 

SSL selected to study asteroid retrieval for NASA

Space Systems/Loral, a leading provider of commercial satellites, announced July 18 that it was one of the companies selected by NASA to study system concepts and key technologies for NASA’s Asteroid Redirect Mission, which is expected to be a key part of the agency’s path to sending humans to Mars. SSL will conduct two studies;...
 
 
NASA image

NASA turns over next-gen air traffic management tool to FAA

NASA image As seen in this image, Terminal Sequencing and Spacing technology enables air traffic controllers to better manage the spacing between aircraft as they save both time and fuel and reducing emissions, flying more effi...
 




0 Comments


Be the first to comment!


Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>